ML19210B425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
* Oh                      Y
Oh                      Y FEGULATORY INFORt1ATION DISTRIBOTION SYSTEM (RIDS 1 DISTRIEUTION FOR INCOMING MATERIAL                                                        50-289 FEC: REID R W                                      ORG: HEREEIN J G                                    DOCDATE: 03/13/75 NRC                                              NETROPOL EDISON                                    DATE RCVD: OS/16'7?
                        .
FEGULATORY INFORt1ATION DISTRIBOTION SYSTEM (RIDS 1 DISTRIEUTION FOR INCOMING MATERIAL                                                        50-289 FEC: REID R W                                      ORG: HEREEIN J G                                    DOCDATE: 03/13/75 NRC                                              NETROPOL EDISON                                    DATE RCVD: OS/16'7?
                                                                                                                  ,
DOCTYPE: LETTER                NOTARIZED: NO                                                              COPIES RECEIVED
DOCTYPE: LETTER                NOTARIZED: NO                                                              COPIES RECEIVED


Line 37: Line 34:
                                                                 '            7911080SY/
                                                                 '            7911080SY/


.
                       .                                                          .---su          .,j--, i-              3-of:4,e,6.e.
                        ,    .
n      Mit KA #40GM15 METROPOLITAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603                                      TELEPHONE 215 - 9 3 3601 March 13, 1978 GQL 0360 Director of Nuclear Reactor Regulation Attn: Mr. R. W. Reid, Chief Operating Reactors Branch :To. L U. S. Nucleat- Regulatory Cc= mission                                                                                      -
  .
                                                -                  -                - - - -    ---            . _ - - . - _ - -
                  '
                                                                                                                                  --
                -
                       .                                                          .---su          .,j--, i-              3-
                                                            -
of:4,e,6.e.
n      Mit KA #40GM15
                                                  ,
METROPOLITAN EDISON COMPANY
                                                              --                                                __
POST OFFICE BOX 542 READING, PENNSYLVANI A 19603                                      TELEPHONE 215 - 9 3 3601 March 13, 1978 GQL 0360 Director of Nuclear Reactor Regulation Attn: Mr. R. W. Reid, Chief Operating Reactors Branch :To. L U. S. Nucleat- Regulatory Cc= mission                                                                                      -
                                                                                                                    -
Washingten, D. C.      20555                                                            .
Washingten, D. C.      20555                                                            .


Line 58: Line 41:


Three Mile Island Nuclear Station, Unit 1 (TMI-1)                              ~ 's                  -
Three Mile Island Nuclear Station, Unit 1 (TMI-1)                              ~ 's                  -
                                                                                                                                      '
Operating License No. DPR-50 Docket No. 50-239 Cycle 3 Extension Metropolitan Edison Company letter of March 1, 1978, GQL 0337, submitted auditional information with respect to Technical Specification Change Re-quest No. 72, Cycle 3 Extension. It has been noted that en Page 11 of the above submittal the Doppler coeff,10-5 Ak/k/cy (EOL) for Cycle 3 2 315 EFPD's was shown as      .152. The correct value is -1.52.
Operating License No. DPR-50 Docket No. 50-239 Cycle 3 Extension Metropolitan Edison Company letter of March 1, 1978, GQL 0337, submitted auditional information with respect to Technical Specification Change Re-quest No. 72, Cycle 3 Extension. It has been noted that en Page 11 of the above submittal the Doppler coeff,10-5 Ak/k/cy (EOL) for Cycle 3 2 315 EFPD's was shown as      .152. The correct value is -1.52.
Enclosed please find forty (h0) copies of revised Page 11.
Enclosed please find forty (h0) copies of revised Page 11.
91ncerely,
91ncerely, J. G. Herbein Vice President-Generation JCH:PJS:cj g Enclosure 00 I 9, p ''
                                                                                .
J. G. Herbein Vice President-Generation JCH:PJS:cj g Enclosure 00 I 9, p ''
i
i
                                                                                     "=**                                    1584 014 s
                                                                                     "=**                                    1584 014 s


                -            .
' ''                                    COMPARISON OF KEY ACCIDE:IT A iD TR."JISII:!T PAPJJ Z ERS AFFECTED BY CYCLE 3 E:CE:ISION SAFETY STUDY FOR CYCLE 3    CYCLE 9 8 PAP 1d E ER                          RELCAD REPCRT  315 EFPD's Doppler coeff, 10
' ''                                    COMPARISON OF
        .
KEY ACCIDE:IT A iD TR."JISII:!T PAPJJ Z ERS AFFECTED BY CYCLE 3 E:CE:ISION SAFETY STUDY FOR CYCLE 3    CYCLE 9 8 PAP 1d E ER                          RELCAD REPCRT  315 EFPD's Doppler coeff, 10
                     -5 Ak/k/ F (EOL)                    -1.33      -1.52 M0derator coeff,10- Ak/k/ F (EOL)                      -3.0      -2.60 All rod group vorth, 5Ak/k, HZP                        10.0      8.72
                     -5 Ak/k/ F (EOL)                    -1.33      -1.52 M0derator coeff,10- Ak/k/ F (EOL)                      -3.0      -2.60 All rod group vorth, 5Ak/k, HZP                        10.0      8.72
   ?'a&"- ejected red worth, HZP, 5Ak/k                  1.00      0.68              l I:axi== dropped rod vorth, HFP, 5Ak/k                  0.h6        less than 0.20 Maxi == stuck rod vorth, HZP, EOC, %Ak/k              2.1        2.07            l lIini=um shutdown margin, HZP, %Ak/k                  1.0        greater than 1.4 Revised: 3/2/78 11 1584 015}}
   ?'a&"- ejected red worth, HZP, 5Ak/k                  1.00      0.68              l I:axi== dropped rod vorth, HFP, 5Ak/k                  0.h6        less than 0.20 Maxi == stuck rod vorth, HZP, EOC, %Ak/k              2.1        2.07            l lIini=um shutdown margin, HZP, %Ak/k                  1.0        greater than 1.4 Revised: 3/2/78 11 1584 015}}

Latest revision as of 05:40, 2 February 2020

Forwards Corrections to 780301 (Gql 0337) Tech Spec Change Request 72 to OL DPR-50,App a Re Cycle 3 Extension
ML19210B425
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/13/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-0360, GQL-360, NUDOCS 7911080641
Download: ML19210B425 (3)


Text

-

Oh Y FEGULATORY INFORt1ATION DISTRIBOTION SYSTEM (RIDS 1 DISTRIEUTION FOR INCOMING MATERIAL 50-289 FEC: REID R W ORG: HEREEIN J G DOCDATE: 03/13/75 NRC NETROPOL EDISON DATE RCVD: OS/16'7?

DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 40 ADDITIONAL INFO WITH RESPECT TO TECH 9PEC EHANGE H PEOUEST NO. 72, CYCLE O EXTENSION.

PLANT NAN 5.: THREE MILE ISLAND - UNIT 1 REVIEWER INITIAL: XF9 DISTRIBUTOR INITIAL: 0L

- + + + + + + + + + - + + + + - + - + +

  • DISTRIBUTION OF THIS MATERIAL I S A S FO L L O WS * * * * * * * * * * * * * * -* * + ->

GENERAL DISTRIEUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE AOO1)

FOR ACTION: BR CHI =c m n**W/7 ENCL INTERNAL: REG FILE **W/ T NRC PDR**W/ ENCL

' ' ~ ' - ~

u OELD**LTR ONLY HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAO**W/ ENCL BAER**W/ ENCL BUTLER **W/rCL GRIMES **W/ ENCL J COLLINS *4 ./ ENCL J. NCGOUGH**W/ ENCL EXTERNAL: LPDR'S HARRISBURG, PA**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACPS CAT B**W/16 ENCL 1584 013 DISTRIElJTION: LTR 40 ENCL $9 CONTPOL NER: 7907i0202 312E: 1P+1P

~*******************+++*********++ //

T H E E N D V * * * * * * * * * * * + + * * * + 4 * * * * + + -* * * + * + + + + <

' 7911080SY/

. .---su .,j--, i- 3-of:4,e,6.e.

n Mit KA #40GM15 METROPOLITAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 9 3 3601 March 13, 1978 GQL 0360 Director of Nuclear Reactor Regulation Attn: Mr. R. W. Reid, Chief Operating Reactors Branch :To. L U. S. Nucleat- Regulatory Cc= mission -

Washingten, D. C. 20555 .

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1) ~ 's -

Operating License No. DPR-50 Docket No. 50-239 Cycle 3 Extension Metropolitan Edison Company letter of March 1, 1978, GQL 0337, submitted auditional information with respect to Technical Specification Change Re-quest No. 72, Cycle 3 Extension. It has been noted that en Page 11 of the above submittal the Doppler coeff,10-5 Ak/k/cy (EOL) for Cycle 3 2 315 EFPD's was shown as .152. The correct value is -1.52.

Enclosed please find forty (h0) copies of revised Page 11.

91ncerely, J. G. Herbein Vice President-Generation JCH:PJS:cj g Enclosure 00 I 9, p

i

"=** 1584 014 s

' COMPARISON OF KEY ACCIDE:IT A iD TR."JISII:!T PAPJJ Z ERS AFFECTED BY CYCLE 3 E:CE:ISION SAFETY STUDY FOR CYCLE 3 CYCLE 9 8 PAP 1d E ER RELCAD REPCRT 315 EFPD's Doppler coeff, 10

-5 Ak/k/ F (EOL) -1.33 -1.52 M0derator coeff,10- Ak/k/ F (EOL) -3.0 -2.60 All rod group vorth, 5Ak/k, HZP 10.0 8.72

?'a&"- ejected red worth, HZP, 5Ak/k 1.00 0.68 l I:axi== dropped rod vorth, HFP, 5Ak/k 0.h6 less than 0.20 Maxi == stuck rod vorth, HZP, EOC, %Ak/k 2.1 2.07 l lIini=um shutdown margin, HZP, %Ak/k 1.0 greater than 1.4 Revised: 3/2/78 11 1584 015