{{#Wiki_filter:I., AEC D1.I3CTION FOR PART 50 DOCKET MA.
{{#Wiki_filter:I         .                                                                               ,
I_A_L, 2569-(TEMPORARY FORM)
AEC D1   .I3CTION FOR PART 50 DOCKET MA.           I_A_L,                         2569
CONTROL NO:
-
DTD*[D)[ F{y f FILE: 'y gg ROM: DATE OF DOC DATE REC'D LTR MEMO RPT OT!ER E.ictropolitan Edison Company Reading, Penn. 19603 Mr. R.C. Arnold 3-25-74 3-27-74 X TO: ORIG CC OTHER SENT AEC PDR XXX SENT LOCAL PDR XXX A. Giambusso 1 signed CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
(TEMPORARY FORM)                                 CONTROL NO:
XXX 21 50-289 DESCRIPTION:
DTD y
ENCLOSURES:
                  *
Ltr trans the following...
[D)[ F {y f gg
Information concerning Operational Quality Assurance Plan, App. lA, which will be submitted as an amendment to the FSAR.
                                    '
FILE:
ROM:                                     DATE OF DOC         DATE REC'D         LTR       MEMO     RPT     OT!ER E.ictropolitan Edison Company Reading, Penn. 19603 Mr. R.C. Arnold                               3-25-74             3-27-74             X TO:                                           ORIG             CC     OTHER               SENT AEC PDR     XXX SENT LOCAL PDR XXX A. Giambusso                                 1 signed CLASS       UNCLASS       PROP INFO           INPUT         NO CYS REC'D                 DOCKET NO:
XXX                                                 21                     50-289 DESCRIPTION:                                                   ENCLOSURES:
Ltr trans the following...                                         Information concerning Operational Quality Assurance Plan, App. lA, which will be submitted as an amendment to the FSAR.
ACKNOWLE ED (21 cys enc 1 rec'd)
ACKNOWLE ED (21 cys enc 1 rec'd)
PLANT NAME:
PLANT NAME:               Three Mile Island #1                                             rp FOR ACTION /INFORMATION                             3-27-74     JB BUTLER (L)       /SCIMENCER(L)               ZIDIANN(L)               REGAN(E)
Three Mile Island #1 rp FOR ACTION /INFORMATION 3-27-74 JB BUTLER (L)
W/ Copie8           W/YCopies                 W/ Copies                 W/ Copies CLARK (L)             STOLZ(L)                 DICKER (E)
/SCIMENCER(L)
W/ Copies           W/ Copies                 W/ Copies                 W/ Copies GOLLER(L)           VASSALLO(L)               KNIGHION(E)
ZIDIANN(L)
W/ Copies           W/ Copies                 W/ Copies                 W/ Copies KNIEL(L)             SCHDIEL(L)               YOUNGBLOOD(E)
REGAN(E)W/ Copie8 W/YCopies W/ Copies W/ Copies CLARK (L)STOLZ(L)DICKER (E)
W/ Copies           W/ Copies                 W/ Copies                 W/ Copies m                               INTEP27AL DISTRIEUTION REG FITU J               TECli REVIEW         DE; TON                                         A/T I::D
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)VASSALLO(L)
  #AEC PDR                     HENDRIE               GRIMES               LIC ASST                   BRAIIL'll
KNIGHION(E)
/ OGC, R00'i P-506A           SCHROEDER             GAMMILL             DIGGS (L)                   SALTZMAN vMUNTZING/ STAFF           MACCARY               KASTNER                                         B. HURT GEARIN (L)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)SCHDIEL(L)
CASE                     KNIGHT                 BALLARD
YOUNGBLOOD(E)
                                                                      /GOULBOURNE (L)                 PLANS GIAMBUSSO               PAWLICKI               SPANGLER LEE (L)                     MCDONALD
W/ Copies W/ Copies W/ Copies W/ Copies m INTEP27AL DISTRIEUTION REG FITU J TECli REVIEW DE; TON A/T I::D#AEC PDR HENDRIE GRIMES LIC ASST BRAIIL'll/ OGC, R00'i P-506A SCHROEDER GAMMILL DIGGS (L)SALTZMAN B. HURT vMUNTZING/ STAFF MACCARY KASTNER GEARIN (L)
  / BOYD                       SHA0                                       MAIGRET (L)                 DUBE w/ Input
CASE KNIGHT BALLARD/GOULBOURNE (L)
  /M00RE (L)(L'R)             STELLO                 ENVIRO
PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L)MCDONALD/ BOYD SHA0 MAIGRET (L)
                                                                      / REED (E)
DUBE w/ Input
DEYOUNG(L)(EUR)         HOUSTON           v MULLER                                             I F0 SERVICE (L)
/M00RE (L)(L'R)
SKOVHOLT (L)             NOVAK                 DICKER             SHEPPARD (L)
STELLO ENVIRO/ REED (E)
C. MILES P. COLLINS               ROSS                   KNIGHTON SLATER (E)                 3* EIEC DENISE                   IPPOLITO             YOUNGBLOOD SMITH (L)               V 0' Leary
I F0 DEYOUNG(L)(EUR)
  / REG OPR                 / TEDESCO             /REGAN                 TEETS (L)               / Thornburg FILE & REGION (3)       LONG             / PROJECT LDR           WADE (E)                 /Klecker MORRIS                   LAINAS                 St. Marv (2)       WILLIAMS (E)             / Kari STEELE                   BENAROYA               HARLESS                                                       '-
HOUSTON v MULLER SERVICE (L)
WILSON (L)               /Paton
C. MILES SKOVHOLT (L)
                            / VOLIFER [2 )                                                                           ,      ,
NOVAK DICKER SHEPPARD (L) 3* EIEC P. COLLINS ROSS KNIGHTON SLATER (E)
    ,                                         EXTERNAL DISTRIEUTICM                         irn7       7 ' fl     fd
DENISE IPPOLITO YOUNGBLOOD SMITH (L)V 0' Leary
    'l - LOCAL PDR Harrisburg. Pa.                                                           I'V'       '"V ff
/ REG OPR/ TEDESCO/REGAN TEETS (L)/ Thornburg FILE & REGION (3)
        ,- DTIC(ALE?2:ATHY)                   (1)(2)(10)-NATIO"AL LAD'S                             1-PDR-SAN /LA/NY 1 - NSIC(2UCRANA!i)                               /1-ASLBP(E/U Bidr,,Rm 529)                 1-GERALD LELLCUC S ASLB(YORE                                         l-U. PEN.iINGTO:;, Em E-201 GT           BR00KiiAVEN NAT. LAB l-CONSULTANT' S                           1-AGMED(Ruth Guast:1
LONG/ PROJECT LDR WADE (E)/Klecker MORRIS LAINAS St. Marv (2)
/16 - CYS ACRS M3%KLI Sent to Goulbourne                     Ni3CIARK/ BLUNE/AGBABIAN                 RM- B-12 7, GT.
WILLIAMS (E)
3-27-74                   1-GURALD ULRIKSON.. I' L                     Q.. MULLER..F-309 G'
/ Kari STEELE BENAROYA HARLESS WILSON (L)
 
/Paton'-/ VOLIFER [2 )
.    -
, , EXTERNAL DISTRIEUTICM irn7 7 ' fl fd ,'l - LOCAL PDR Harrisburg. Pa.
h c.i!dtery         Fi       v.
I'V''"V ff ,- DTIC(ALE?2:ATHY)
                                                                    --
(1)(2)(10)-NATIO"AL LAD'S 1-PDR-SAN /LA/NY 1 - NSIC(2UCRANA!i)
* fg c2 gu               mre 7:n ma rss METROPOLITAN EDISON COMPANY
/1-ASLBP(E/U Bidr,,Rm 529) 1-GERALD LELLCUC S ASLB(YORE l-U. PEN.iINGTO:;, Em E-201 GT BR00KiiAVEN NAT. LAB l-CONSULTANT' S 1-AGMED(Ruth Guast:1
  'C'~ ' WcE 30X N2 AEADING. PENNSYLV ANI A 196C':                                             TELEPHONE 215 - 9 3-2601 March 25, 197h
/16 - CYS ACRS M3%KLI Sent to Goulbourne Ni3CIARK/ BLUNE/AGBABIAN RM- B-12 7, GT.
                                                                                                                ,;,       -~               .,
3-27-74 1-GURALD ULRIKSON..
                                                                                                            / '.                      *
I' L Q.. MULLER..F-309 G' h c.i!dtery Fi v..---*fg c2 gu mre 7:n ma rss METROPOLITAN EDISON COMPANY
                                                                                                                                        , ,, \
'C'~' WcE 30X N2 AEADING. PENNSYLV ANI A 196C':
Mr. A. Giambusso                                                                          ,.
TELEPHONE 215 - 9 3-2601 March 25, 197h
bi!i[ki[it,                           r.,
,;,-~., , ,, \/ '.*bi!i[ki[it, r., Mr. A. Giambusso
t
/,l4;' 0,4 /d//
                                                                                                                                ,
t ,., Deputy Director for Reactor Projects H. *Office of Regulation
Deputy Director for Reactor Projects                                                      H            /,l4;' 0,4 /d//
' i-'.)-'~" U. S. Atomic Energy Commission
Office of Regulation                                                                       ' i-
['', ,'Washington, DC 205h5 T(/. . . , u., ,, D.,r -[s ''h '
                                                                                                        -
s'/ i q9
                                                                                                                    '               . *      .)
                                                                                                                                  '~"
U. S. Atomic Energy Commission                                                               ['',                           ,'
Washington, DC     205h5                                                                     T(/ ,,
                                                                                                                            ...,         u.,
s'/ D.,r i        q9 ''h '
                                                                                                                                -[s


==Dear Mr. Giambusso:==
==Dear Mr. Giambusso:==
                                                                                              .


.
==Subject:==
':'hree Mile Island Nuclear Station Unit 1 c->        Docket :Io. 50-289 Attached are one original and 20 copies of information which vill be included as an amendment to the Three Mile Island Unit 1 FSAR to modify the Operational Quality Assurance Plan, Appendix 1A. This information is submitted to resolve objections in the previous filing noted in Mr. Schwencer's letter of March 12, 197h. The amendment has been prepared, is being printed, and will be submitted shortly.
Sincere,17,
                                                                                            ,
                                                  , h \ l 'I ,
                                                    *                                '
_ , ; . -- -*qi,,                                              .
                                                                                      ~ . . ._ . I    ~
(Y',fsf
                                                                      '
N    R. C. AR'~0LD
                                        ,            sM> . :          .
v-\    Vice President El v4,s    D    ~                    ;[i RCA:RSB:1v                H
* t Attachments
                                                        '
E.'          i-          -
                                                                                  ,
ec:  J. P. O'Reilly e.s
                                            %,,
                                                        -
                                                          , _ , ,
                                                                          , .-f
                                                                            ;>
W. A. Verrochi                ' #
                                                    <.&
                                                            '
                                                                    /
                                                                                                    -  -,      n'1 e c r, o GVvU


==Subject:==
. ,
':'hree Mile Island Nuclear Station Unit 1 c->Docket :Io. 50-289 Attached are one original and 20 copies of information which vill be included as an amendment to the Three Mile Island Unit 1 FSAR to modify the Operational Quality Assurance Plan, Appendix 1A.
      .
This information is submitted to resolve objections in the previous filing noted in Mr. Schwencer's letter of March 12, 197h. The amendment has been prepared, is being printed, and will be submitted shortly.
Manaaer-Onerational Quality Assurance                                                   .
Sincere,17, , , h \ l 'I ,*'(Y',fsf'~ . . ._ . I
The Manager-Operational Quality Assurance, who reports to the Vice President-Generation, has the responsibility for ensuring the detailed develop =ent, direction, and overall coordination of operational quality assurance activities for Three Mile Island Nuclear Generating Station Unit 1 which covers all activities affecting quality, including operations , inservice inspection, =aintenance, refueling, codifications, engineering support, and procure =ent for the Three Mile Island Nuclear Generating Station Unit 1.     The Manager-Operational Quality Assurance has the authority and organizational freedc= to identif'y quality problems and provide s olutions .
_ , ; . -- -*qi,,~.N R. C. AR'~0LD sM> . : v-\Vice President
., El v4,s D ~
;[i RCA:RSB:1v H*t Attachments E.'', i--.-f-e.s ec: J. P. O'Reilly
%,,;>, , _ , ,/' #W. A. Verrochi
'<.&n'1--, e c r, o GVvU
.,.Manaaer-Onerational Quality Assurance
.The Manager-Operational Quality Assurance, who reports to the Vice President-Generation, has the responsibility for ensuring the detailed develop =ent, direction, and overall coordination of operational quality assurance activities for Three Mile Island Nuclear Generating Station Unit 1 which covers all activities affecting quality, including operations , inservice inspection, =aintenance, refueling, codifications, engineering support, and procure =ent for the Three Mile Island Nuclear Generating Station Unit 1.
The Manager-Operational Quality Assurance has the authority and organizational freedc= to identif'y quality problems and provide s olutions .
In the detailed imple=entation of this progra=, the Manager-Operational Quality Assurance vill coordinate with the GPU Service Corporation Manager of Quality Assurance. This coordination is to ensure that all GPU co=panies e= ploy the se=e basic appr,;;- A to operational quality assurance programs and procedures in the interest of standardization and =ulti-plant use where feasible.
In the detailed imple=entation of this progra=, the Manager-Operational Quality Assurance vill coordinate with the GPU Service Corporation Manager of Quality Assurance. This coordination is to ensure that all GPU co=panies e= ploy the se=e basic appr,;;- A to operational quality assurance programs and procedures in the interest of standardization and =ulti-plant use where feasible.
Specific responsibilities of the Manager-Operational Quality Assurance include the following ite=s:
Specific responsibilities of the Manager-Operational Quality Assurance include the following ite=s:
1.Development and i=plementation of the Operating Quality Assurance Progra= and changes thereto.
: 1. Development and i=plementation of the Operating Quality Assurance Progra= and changes thereto.
2.Maintenance of Operaticnal Quality Assurance organization in accor-dance with the Operational Quality Assurance Progra=.
: 2. Maintenance of Operaticnal Quality Assurance organization in accor-dance with the Operational Quality Assurance Progra=.
3 Develop =ent and implementation of a quality assurance training progra= for quality assurance personnel. He also ensures that quality assurance indoctrination is provided to appropriate per-sonnel outside of the quality assurance organization.
3     Develop =ent and implementation of a quality assurance training progra= for quality assurance personnel. He also ensures that quality assurance indoctrination is provided to appropriate per-sonnel outside of the quality assurance organization.
h.Supervision and direction of generation depart =ent staff quality assurance engineers and the site quality assurance organization under the site Quality Control Supervisor.
: h. Supervision and direction of generation depart =ent staff quality assurance engineers and the site quality assurance organization under the site Quality Control Supervisor.
5 Approval or concurrence with Metropolitan Edison Co=pany and vendor quality assurance and quality control documents (such as NDE and special process procedures) in accordance with this Quality Assurance Plan., 6.Concurrence, fro = a quality assurance standpoint, with design and engineering docu=ents such as specifications, drawings, and instal-lation require =ents used for equip =ent or site work.
5     Approval or concurrence with Metropolitan Edison Co=pany and vendor quality assurance and quality control documents (such as NDE and special process procedures) in accordance with this Quality Assurance Plan.                       ,
7 Concurrence with the Quality Assurance Syste=s List.
: 6. Concurrence, fro = a quality assurance standpoint, with design and engineering docu=ents such as specifications, drawings, and instal-lation require =ents used for equip =ent or site work.
8.Review and approval of audit and surveillance schedules, supervision lof the planning for audits and surveillance, review of results of audits and surveillance, and ensuring of follow-up correction of nenConfor=ances.
7     Concurrence with the Quality Assurance Syste=s List.
r 7^7 ,b0[dJLl1A-6
: 8. Review and approval of audit and surveillance schedules, supervision     l of the planning for audits and surveillance, review of results of audits and surveillance, and ensuring of follow-up correction of nenConfor=ances.
., Station Sucerintendent The Station Superintendent is directly responsible for the safe operation of Three LEle Island Nuclear Generating Station Unit 1.
r     ^7 7
His specific responsi-bilities include the following:
1A-6                        ,b0[
1.Operating the Three Mile Island Nuclear Generating Station Unit 1 in compliance with the requirements of the operating license including Technical Specifications and this Operating Quality Assurance Plan.
l        dJL
2.Initiating corrective action (including shutdown of the unit as required by the Technical Specifications) when operations are not being conducted in accordance with the requirements contained in ite: "1" above.3.Ensuring that conditions adverse to quality, when identified, are corrected for all activities involving operations, maintenance, repair, refueling , testing, and site engineering.
 
h.Approving and implementing station administration, operation, testing, repair, maintenance, refueling, health physics , environ = ental, and emergency procedures as required by the Technical Specifications, Section 15.6.1 and 15.6.2.
. ,
5 Ensuring that =cdifications to structures, components, and syste=s are properly coordinated and that necessary safety precautions; e.g. , tag outs, draining of systems , designation of exclusion areas,letc. , are perfor=ed in accordance with written procedures.
Station Sucerintendent The Station Superintendent is directly responsible for the safe operation of Three LEle Island Nuclear Generating Station Unit 1. His specific responsi-bilities include the following:
6.Ensuring that plant purchase requisitions are prepared using approved specifications which have received required quality assurance and engineering reviews.
: 1. Operating the Three Mile Island Nuclear Generating Station Unit 1 in compliance with the requirements of the operating license including Technical Specifications and this Operating Quality Assurance Plan.
7 Ensuring that station staff training and qualifications are main-t ained.8.Ensuring inservice inspections a 3 performed as required.
: 2. Initiating corrective action (including shutdown of the unit as required by the Technical Specifications) when operations are not being conducted in accordance with the requirements contained in ite: "1" above.
: 3. Ensuring that conditions adverse to quality, when identified, are corrected for all activities involving operations, maintenance, repair, refueling , testing, and site engineering.
: h. Approving and implementing station administration, operation, testing, repair, maintenance, refueling, health physics , environ = ental, and emergency procedures as required by the Technical Specifications, Section 15.6.1 and 15.6.2.
5     Ensuring that =cdifications to structures, components, and syste=s are properly coordinated and that necessary safety precautions; e.g. , tag outs, draining of systems , designation of exclusion areas,   l etc. , are perfor=ed in accordance with written procedures.
: 6. Ensuring that plant purchase requisitions are prepared using approved specifications which have received required quality assurance and engineering reviews.
7     Ensuring that station staff training and qualifications are main-t ained.
: 8. Ensuring inservice inspections a 3 performed as required.
The Station Superintendent is assisted in carrying out the above responsibilities by the Station Engineer, the Maintenance Supervisor, and the Operations Supervisor, and their staffs. The organization, responsibilities, and qualifications of the station staff are specified in station procedures.
The Station Superintendent is assisted in carrying out the above responsibilities by the Station Engineer, the Maintenance Supervisor, and the Operations Supervisor, and their staffs. The organization, responsibilities, and qualifications of the station staff are specified in station procedures.
Manager-Generation Enrineering
                                                              '
'The Manager-Generation Engineering reports to the Vice President-Generation and has the responsibility for the detailed development, direction, and overall co-ordination of engineering activities for the Three FEle Island Nuclear Genera *> ng Station Unit 1.
Manager-Generation Enrineering The Manager-Generation Engineering reports to the Vice President-Generation and has the responsibility for the detailed development, direction, and overall co-ordination of engineering activities for the Three FEle Island Nuclear Genera *> ng Station Unit 1. This includes modifications, engineering support, and procurem. 't for the station. The Manager-Generation Engineering is responsible for providing technical support to other Generation Department groups, including Station Super-intendents.
This includes modifications, engineering support, and procurem. 't for the station. The Manager-Generation Engineering is responsible for providing technical support to other Generation Department groups, including Station Super-intendents.
lA-10                         -m          7 1 b b 7 ^2 'a 3
lA-10 7 1 b b 7^2 'a 3-m
 
..II.Quality Assurance Program This program is applied to the safety related items of the Three Mile Island Nuclear Generating Station Unit 1 that prevent or mitigate the consequences of postulated accidents which could cause undue risk to the health and safety of the public.
. .
'A summary of structures and systems covered in whole or in part by this program are identified in Atte:h=ent A.
II. Quality Assurance Program This program is applied to the safety related items of the Three Mile Island Nuclear Generating Station Unit 1 that prevent or mitigate the consequences of postulated accidents which could cause undue risk to the health and safety of the public. 'A summary of structures and systems covered in whole or in part by this program are identified in Atte:h=ent A. The actual boundaries of these systems and structures vill be specified in the Quality Assurance Systems Lists. The Manager-Generation Engineering, with concurrence of the Manager-Operational Quality Assurance, is responsible for development of this list.
The actual boundaries of these systems and structures vill be specified in the Quality Assurance Systems Lists. The Manager-Generation Engineering, with concurrence of the Manager-Operational Quality Assurance, is responsible for development of this list.
The fianager-Operational Quality Assurance has the direct responsibility for ensuring that this Operating Quality Assurance Program is implemented and that it provides for control of all activities affecting quality on nuclear safety related ite=s. He is also responsible for ensuring that the program is modified and updated as standards, regulations, results, and experience dictate. The various groups involved in the Operational Quality Assurance Program, and their respcasibilities, are described in Section I of this Plan.
The fianager-Operational Quality Assurance has the direct responsibility for ensuring that this Operating Quality Assurance Program is implemented and that it provides for control of all activities affecting quality on nuclear safety related ite=s.
He is also responsible for ensuring that the program is modified and updated as standards, regulations, results, and experience dictate. The various groups involved in the Operational Quality Assurance Program, and their respcasibilities, are described in Section I of this Plan.
The Operating Quality Assurance Program is described by written policy, plan, and procedure documents. The basic company policy is established by the President in his Policy Statement. This Operating Quality Assurance Plan is issued by the Vice President-Generation. The procedures, which are the Operating Quality Assurance Program's detailed requirements, are originated and approved as shown in Attachment B to this plan, Quality Assurance Program Procedcre Categories and Approvals.
The Operating Quality Assurance Program is described by written policy, plan, and procedure documents. The basic company policy is established by the President in his Policy Statement. This Operating Quality Assurance Plan is issued by the Vice President-Generation. The procedures, which are the Operating Quality Assurance Program's detailed requirements, are originated and approved as shown in Attachment B to this plan, Quality Assurance Program Procedcre Categories and Approvals.
An outline of the quality assurance procedures to be used to implement the Operating Quality Assurance Program is included in Attachment C to this plan.
An outline of the quality assurance procedures to be used to implement the Operating Quality Assurance Program is included in Attachment C to this plan.
Line 115: Line 149:
Each manager maintains formal training programs and procedures to ensure the proper job relhted training and qualification of his personnel. The Station Superintendent is responsible for the indoctrination and training of plant staff personnel performing activities affecting quality or operations, and for ensuring that, where required by FSAR Section 15.6.1, operators are formally licensed or qualified.
Each manager maintains formal training programs and procedures to ensure the proper job relhted training and qualification of his personnel. The Station Superintendent is responsible for the indoctrination and training of plant staff personnel performing activities affecting quality or operations, and for ensuring that, where required by FSAR Section 15.6.1, operators are formally licensed or qualified.
All contractors who perform engineering, construction, or other technical services on structures, components, or systems are required to meet those portior.s of the AEC Regulation 10CFR50, Appendix 3, which are applicable to their services and the materials and equipment which they supply. The Manager-Generation
All contractors who perform engineering, construction, or other technical services on structures, components, or systems are required to meet those portior.s of the AEC Regulation 10CFR50, Appendix 3, which are applicable to their services and the materials and equipment which they supply. The Manager-Generation
*1A-13'.r'7 ,M su
                                                                        '
..Engineering is responsible for ensuring that these requirements are contained in the specifications and purchase documents as appropriate along with the quality assurance safety class of the component or system involved.
* 1A-13                                     .
r'7 su
                                                                                ,M
 
. .
Engineering is responsible for ensuring that these requirements are contained in the specifications and purchase documents as appropriate along with the quality assurance safety class of the component or system involved.
The Operating Quality As surance Progr1= requirec that the Vice President-Generation performs a management review, at least every two years , of the effectiveness of the Operating Quality Assurance Program. The Vice President-Generation vill utilize a group independent of the Operational Quality Assurance Group to perform these reviews or audits. Additional audits and reviews of selected portions (e.g. , abnor=al occurences, violations of Technical Specifica-tions, tests, experiments, etc. ) of the Operating Quality Assurance Program will be performed by PORC, GCRB, and/or the offsite technical staff in accordance with Section 15.6.1 of the FSAR.
The Operating Quality As surance Progr1= requirec that the Vice President-Generation performs a management review, at least every two years , of the effectiveness of the Operating Quality Assurance Program. The Vice President-Generation vill utilize a group independent of the Operational Quality Assurance Group to perform these reviews or audits. Additional audits and reviews of selected portions (e.g. , abnor=al occurences, violations of Technical Specifica-tions, tests, experiments, etc. ) of the Operating Quality Assurance Program will be performed by PORC, GCRB, and/or the offsite technical staff in accordance with Section 15.6.1 of the FSAR.
Metropolitan Edison Company will comply with American National Standards N18.7-1972 and Nh5.2-1971 and Regulatory Guides 1.33 (Novenber 1972) ,1.8 (March 1971) , and 1.58 ( August 1973), as well as other guides published in the booklet " Guidance on Operational Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants" (October 1973) . It is the policy of Metropolitan Edisen Company to review revisions of the aforementioned documents and included referenced standards for applicability and incorporation into the Quality Assurance Program.
Metropolitan Edison Company will comply with American National Standards N18.7-1972 and Nh5.2-1971 and Regulatory Guides 1.33 (Novenber 1972) ,1.8 (March 1971) ,
b .n'C l ~ u ,/dJJ.lA-lh  
and 1.58 ( August 1973), as well as other guides published in the booklet " Guidance on Operational Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants" (October 1973) . It is the policy of Metropolitan Edisen Company to review revisions of the aforementioned documents and included referenced standards for applicability and incorporation into the Quality Assurance Program.
..III. Desien, Modification, Maintenance, and Repair Control A.Design mad Modification lThe Manager-Generation Engineering is responsible for controlling design work and administering design control activities (including design interfaces) for the modification of nuclear safety related structures, co=ponents, and systems. These activities shall comply with Regulatcry Guide 1.6h (October 1973) and the applicable requirements of ANSI Nh5.2.11 (Draft-May 1973).
n'C l ~b u. ,/ dJJ
, The Manager-Generation Engineering is responsible for the preparation of the Quality Assurance Systems List."he Lhnager-Operational Quality Assurance is responsible for reviewing the Quality Assurance Systems List for concurrence on quality assurance aspects. The Quality Assurance Systems List is a list of those systems which are within the scope of this Quality Assurance Plan.
                                              .
Design control is implemented by means of Generation Engineering Procedures which include: design considerations; design review requirements; internal and external interface control considerations; and design document review, approval, distribution, control, and revision requirements. Design considera-tions include, as appropriate: physics , stress, materials , ther=al hydraulic, radiation and accident analysis; appropriate design bases , codes, standards, and regulations; acceptance and rejection criteria; and quality assurance / quality control. Design verification includes the use of formal design reviews, checks or tests as appropriate to ensure the adequacy of the design with regard to design considerations. Design reviews may be conducted by means of the same, an alternate, or a simplified calculational method or by the performance of a suitable testing program.
lA-lh
A design review vill be performed by an individual or group other than the individual or group who performed the original design, but who may be frc= the same organization.
 
The bhnager-Generation Engineering is responsible for ensuring that desi n 6 con trol procedures, whether the work is done by Metropolitan Edison Company or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. A=ong other things, satisfactory design control requires that an independent design verification is performed.
. .
Proposed plant =odification packages and their implementation are the responsi-bility of the Manager-Generation Engineering and controlled by means of written Generation Engineering procedurec. This coordination includes the necessary interface with the Station Staff in regard to station scheduling, station procedure preparation and approval, Plant Operations Revier Co==ittee and General Office Review Board review and approval, etc.
III. Desien, Modification, Maintenance, and Repair Control A. Design mad Modification l
Proposed station =odifications are reviewed and approved by the Plant Operations Review Co==ittee and the General Office Review Board, prior to their implementation, when required by the Technical Specifications, Section 6.1.
The Manager-Generation Engineering is responsible for controlling design work and administering design control activities (including design interfaces) for the modification of nuclear safety related structures, co=ponents, and systems. These activities shall comply with Regulatcry Guide 1.6h (October 1973) and the applicable requirements of ANSI Nh5.2.11 (Draft-May 1973).                 ,
The Manager-Generation Engineering is responsible for the preparation of the Quality Assurance Systems List.   "he Lhnager-Operational Quality Assurance is responsible for reviewing the Quality Assurance Systems List for concurrence on quality assurance aspects. The Quality Assurance Systems List is a list of those systems which are within the scope of this Quality Assurance Plan.
Design control is implemented by means of Generation Engineering Procedures which include: design considerations; design review requirements; internal and external interface control considerations; and design document review, approval, distribution, control, and revision requirements. Design considera-tions include, as appropriate: physics , stress, materials , ther=al hydraulic, radiation and accident analysis; appropriate design bases , codes, standards, and regulations; acceptance and rejection criteria; and quality assurance / quality control. Design verification includes the use of formal design reviews, checks or tests as appropriate to ensure the adequacy of the design with regard to design considerations. Design reviews may be conducted by means of the same, an alternate, or a simplified calculational method or by the performance of a suitable testing program. A design review vill be performed by an individual or group other than the individual or group who performed the original design, but who may be frc= the same organization.
The bhnager-Generation Engineering is responsible for ensuring that desi6n con trol procedures, whether the work is done by Metropolitan Edison Company or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. A=ong other things, satisfactory design control requires that an independent design verification is performed.
Proposed plant =odification packages and their implementation are the responsi-bility of the Manager-Generation Engineering and controlled by means of written Generation Engineering procedurec. This coordination includes the necessary interface with the Station Staff in regard to station scheduling, station procedure preparation and approval, Plant Operations Revier Co==ittee and General Office Review Board review and approval, etc. Proposed station =odifications are reviewed and approved by the Plant Operations Review Co==ittee and the General Office Review Board, prior to their implementation, when required by the Technical Specifications, Section 6.1.
The Manager-Generation Engineering is responsible for the timely approval and updating of specifications and drawings, as well as changes or deviations thereto, utilized for purchase or installation of materials, parts, or components.
The Manager-Generation Engineering is responsible for the timely approval and updating of specifications and drawings, as well as changes or deviations thereto, utilized for purchase or installation of materials, parts, or components.
Any other design documents, specifications, drawings , installation requirements, and changes thereto, are approved in the same manner.
Any other design documents, specifications, drawings , installation requirements, and changes thereto, are approved in the same manner.               -
-., , b u 7 ,, J d I d.lA-15  
                                                                                  .,
.IV.Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, ec=ponents, and services required to perform design, maintenance, repair, modification, operation, test, refueling, inservice inspection, and quality assurance functions . Such docu=ents may be prepared by Metropolitan Edison Conpany or by a design contractor or agent and include purchase requisitions, purchase orders, service agreements and invoked speci-fications , drawings, etc.
                                                                      ,I b u 7 ,,
In any case, the procure =ent document preparation shall comply with ANSI Nh5 2-1971 and the applicable requirements of ANSI Nh5 2.13 (Draft-May 1973) .
d Jd
                  .
lA-15
 
.
IV. Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, ec=ponents, and services required to perform design, maintenance, repair, modification, operation, test, refueling, inservice inspection, and quality assurance functions . Such docu=ents may be prepared by Metropolitan Edison Conpany or by a design contractor or agent and include purchase requisitions, purchase orders, service agreements and invoked speci-fications , drawings, etc. In any case, the procure =ent document preparation shall comply with ANSI Nh5 2-1971 and the applicable requirements of ANSI Nh5 2.13 (Draft-May 1973) .
Procurement documents prepared by or for the Generation Division shall be prepared, reviewed, approved, revised, and controlled in accordance with the Generation Division procedures " Procurement Document Control." The preparation, review, and approval of engineering procedures is the responsibility of the Manager-Genebation Engineering. It requires that , in the preparation of procurement documents, consideration be given to at least the ite=s listed in Table IV-1.
Procurement documents prepared by or for the Generation Division shall be prepared, reviewed, approved, revised, and controlled in accordance with the Generation Division procedures " Procurement Document Control." The preparation, review, and approval of engineering procedures is the responsibility of the Manager-Genebation Engineering. It requires that , in the preparation of procurement documents, consideration be given to at least the ite=s listed in Table IV-1.
Frocurements of materials, parts, or components are initiated by purchase requisitions prepared by the station staff or by others in the Generation Di vi sion . The Generation Division procurement procedures require that an organization preparing a requisition ensures that all applicable items listed in Table IV-1 are considered and included as appropriate in the requisition, invoked specifications , or drawings.
Frocurements of materials, parts, or components are initiated by purchase requisitions prepared by the station staff or by others in the Generation Di vi sion . The Generation Division procurement procedures require that an organization preparing a requisition ensures that all applicable items listed in Table IV-1 are considered and included as appropriate in the requisition, invoked specifications , or drawings.
For station initiated purchase requisitions, the Station Superintendent is responsible for the determination of the system or co=ponent safety class in accordance with the Quality Assurance Syste=s List. If the classification is unclear, he contacts Generation Engineering for resolution. For items within the scope of this Quality Assurance Plan, purchase rdQuisitions and invoked requirements are to be reviewed for concurrence by the site Quality Control Supervisor.
For station initiated purchase requisitions, the Station Superintendent is responsible for the determination of the system or co=ponent safety class in accordance with the Quality Assurance Syste=s List. If the classification is unclear, he contacts Generation Engineering for resolution. For items within the scope of this Quality Assurance Plan, purchase rdQuisitions and invoked requirements are to be reviewed for concurrence by the site Quality Control Supervisor. Purther, if the requirements invoked by the purchase requisition are not taken from current approved Generation Engineering specifi-cations or drawings, then Generation Engineering approval of the requisition and invoked requirements is required.
Purther, if the requirements invoked by the purchase requisition are not taken from current approved Generation Engineering specifi-cations or drawings, then Generation Engineering approval of the requisition and invoked requirements is required.
For cases where requisitions are not prepared by the station, the requisition and invoked requirements, including specifications prepared by outsa de organizations, must be reviewed for concurrence by the Generation Engineering and Operational Quality Assurance staffs.
For cases where requisitions are not prepared by the station, the requisition and invoked requirements, including specifications prepared by outsa de organizations, must be reviewed for concurrence by the Generation Engineering and Operational Quality Assurance staffs.
After puchase requisitions have received the required approvals and con-currences described above, they are converted to purchase orders and selection of vendors is controlled as described in Criterien VII.
After puchase requisitions have received the required approvals and con-currences described above, they are converted to purchase orders and selection of vendors is controlled as described in Criterien VII. It should be noted that under no circu= stances will purchase requisition require =ents be altered (except for pricing and quantity) during order placement unless review and concurrence is obtained from those who were originally required to review, concur with, and approve the requisition as described above.
It should be noted that under no circu= stances will purchase requisition require =ents be altered (except for pricing and quantity) during order placement unless review and concurrence is obtained from those who were originally required to review, concur with, and approve the requisition as described above.
                                                                          <    n
n.(<lA-16 IsU/dJ!  
                                                                      .(
..VI.Document Control A standard Generation Division procedure for document control includes basic generic controls which are to be incorporated into specific written procedures by each manager and the Station Superintendent for use by himself and his staff.
lA-16                         IsU/     dJ!
 
. .
VI. Document Control A standard Generation Division procedure for document control includes basic generic controls which are to be incorporated into specific written procedures by each manager and the Station Superintendent for use by himself and his staff.
The basic procedure is prepared in accordance with this Operational Quality Assurance Plan and approved by the Vice President-Generatien. Each Manager and the Station Superintendent are responsible for the preparation, approval, and implerentation of his group's procedure in accordance with the requirements of the Generation Division procedure.
The basic procedure is prepared in accordance with this Operational Quality Assurance Plan and approved by the Vice President-Generatien. Each Manager and the Station Superintendent are responsible for the preparation, approval, and implerentation of his group's procedure in accordance with the requirements of the Generation Division procedure.
.The Generation Division document control procedure requires that documents be controlled as appropriate considering the type of document involved and its importance to safety. ' Accordingly, it specifies the types of documents which must be controlled; identifies the difference between controlled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires lists of effective revisions be issued period-ically; requires distribution lists for the documents to be maintained by the distributors; requires that distributors transmit controlled documents using Generation Division for=s internally and approved for=s externally; and requires holders of controlled copies of documents to assume responsibility for the document and revisions as well as to certify that the document and/or revisions are entered and implemented.
                                                                                        .
Types of documents which are controlled to various degrees include Technical Specifications, FSAR, Quality Assurance Plan, procedures (such as, quality assurance, operation, repair, maintenance, health physics, fuel handling, modification, administrative, and environmental procedures), specifications, drawings, inspection and test results, procurement documents, k.ality assurance-u records, and noncenformance and corrective action documentatio The Generation Division document control procedure further requires that each Bhnager and the Station Superintendent provide in their procedures for measures:
The Generation Division document control procedure requires that documents be controlled as appropriate considering the type of document involved and its importance to safety. ' Accordingly, it specifies the types of documents which must be controlled; identifies the difference between controlled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires lists of effective revisions be issued period-ically; requires distribution lists for the documents to be maintained by the distributors; requires that distributors transmit controlled documents using Generation Division for=s internally and approved for=s externally; and requires holders of controlled copies of documents to assume responsibility for the document and revisions as well as to certify that the document and/or revisions are entered and implemented. Types of documents which are controlled to various degrees include Technical Specifications, FSAR, Quality Assurance Plan, procedures (such as, quality assurance, operation, repair, maintenance, health physics, fuel handling, modification, administrative, and environmental procedures), specifications,
                                                                      -u drawings,   inspection records, and          and testand noncenformance  results, procurement corrective          documents, k.ality assurance action documentatio The Generation Division document control procedure further requires that each Bhnager and the Station Superintendent provide in their procedures for measures:
to ensure documents are available when required; to properly review and approve documents such as procedures, instructions, specifications, drawings, etc. ; to provide the same reviews and approvals for changes to documents as were required of the original document (unless the review and approval authority is delegated by Metropolitan Edison Co=pany to another responsible and qualified organization);
to ensure documents are available when required; to properly review and approve documents such as procedures, instructions, specifications, drawings, etc. ; to provide the same reviews and approvals for changes to documents as were required of the original document (unless the review and approval authority is delegated by Metropolitan Edison Co=pany to another responsible and qualified organization);
to require that review and approval organizations have access to pertinent infbr=a-tion and adequate knowledge of the original document intent; to ensure that approved changes be promptly transmitted fbr incorporaticn into documents; and to ensure that obsolete or superseded documents are eliminated from the syste=
to require that review and approval organizations have access to pertinent infbr=a-tion and adequate knowledge of the original document intent; to ensure that approved changes be promptly transmitted fbr incorporaticn into documents; and to ensure that obsolete or superseded documents are eliminated from the syste=
and not used. Attachments B and D of this plan provide lists of procedure and document categories.
and not used. Attachments B and D of this plan provide lists of procedure and document categories. These appendices specify review, concurrence, and approval requirements for the i.:cluded procedures and documents .
These appendices specify review, concurrence, and approval requirements for the i.:cluded procedures and documents .
The Superintendent of the Three hule Island Nuclear Generating Station Unit 1 is responsible for the implementatien of the document control system for all ins tructions , procedures , drawings , and other controlled documents received or prepared at the generating station for use in administering, operating, testing, maintaining, and modifying the nuclear safety-related structures, cocponents, and systems . The Superintendent of the TMI Station Unit 1 vill ensure that no changes are made to site instructions, procedures , and drawings unless such 1A-23 1567 238
The Superintendent of the Three hule Island Nuclear Generating Station Unit 1 is responsible for the implementatien of the document control system for all ins tructions , procedures , drawings , and other controlled documents received or prepared at the generating station for use in administering, operating, testing, maintaining, and modifying the nuclear safety-related structures, cocponents, and systems . The Superintendent of the TMI Station Unit 1 vill ensure that no changes are made to site instructions, procedures , and drawings unless such 1A-23 1567 238  
 
..IX.Control of Srecial Processes For work performed by vendors or by Matropolitan Edison Company, written procedures are established and qualified, as required, for special processes, such as velding, heat treating, cleaning, and nondestructive examination (NDE) to ensure ecmpliance with applicable codes, standards, design specifications, and vendor's requirements.
. .
'4 hen special processes and qualification require-ments are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requi rements . The performance of special processes as discussed above shall comply with Regulatory Guides 1.37 (March 1973) and 139 (March'1973) and applicable requirements of ANSI Nk5 2.1-1973 and ANSI Nh5.2.3-1973.
IX. Control of Srecial Processes For work performed by vendors or by Matropolitan Edison Company, written procedures are established and qualified, as required, for special processes, such as velding, heat treating, cleaning, and nondestructive examination (NDE) to ensure ecmpliance with applicable codes, standards, design specifications, and vendor's requirements. '4 hen special processes and qualification require-ments are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requi rements . The performance of special processes as discussed above shall comply with Regulatory Guides 1.37 (March 1973) and 139 (March'1973) and applicable requirements of ANSI Nk5 2.1-1973 and ANSI Nh5.2.3-1973.
The Manager-Generation Engineering, the Manager-Generation Maintenance, and the Station Superintendent are responsible for requiring vendors, in procure-sent documents, to control special processes in accordance with the above requirements. The Manager-Operational Quality Assurance is responsible for quality assurance review and concurrence of procurement documents including review of requirements for control of special processes .
The Manager-Generation Engineering, the Manager-Generation Maintenance, and the Station Superintendent are responsible for requiring vendors, in procure-sent documents, to control special processes in accordance with the above requirements. The Manager-Operational Quality Assurance is responsible for quality assurance review and concurrence of procurement documents including review of requirements for control of special processes .
As described above, it is required that special processes be performed in accordance with written procedures.
As described above, it is required that special processes be performed in accordance with written procedures. The folleving reviews and approvals are required fcr special process procedures submitted by vendors in accordance with procurement document requirements and for all Metropolitan Edison Cc=pany special process procedures:
The folleving reviews and approvals are required fcr special process procedures submitted by vendors in accordance with procurement document requirements and for all Metropolitan Edison Cc=pany special process procedures:
: 1. Special prccess procedures other than nondestructive examination procedures are reviewed for concurrence with quality assurance requirements by Operational Quality Assurance and approved by the Manager-Generation Engineering or Manager-Generation . - inten-ance, as appropriate.
1.Special prccess procedures other than nondestructive examination procedures are reviewed for concurrence with quality assurance requirements by Operational Quality Assurance and approved by the Manager-Generation Engineering or Manager-Generation . - inten-ance, as appropriate.
: 2. Nondestructive examination procedures are approved by the Manager-Operational Quality Assurance. However, if required by applicable codes or standards, he also ensures that the procedures are approved by formally qualified examiners prior to granting his approval.
2.Nondestructive examination procedures are approved by the Manager-Operational Quality Assurance. However, if required by applicable codes or standards, he also ensures that the procedures are approved by formally qualified examiners prior to granting his approval.
The Manager-Generation Maintenance and the Station Maintenance Supervisor are responsible for ensuring the personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications , and standards . The Manager-Operational Quality Assurance is responsible for the qualifications of NDE personnel and procedures . The Manager-Generation Maintenance, Station Maintenance Supervisor, and the Manager-Operational Quality Assurance main-tain records for their personnel and their procedures to demonstrate that required qualifications have been obtained and are maintained current.
The Manager-Generation Maintenance and the Station Maintenance Supervisor are responsible for ensuring the personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications , and standards . The Manager-Operational Quality Assurance is responsible for the qualifications of NDE personnel and procedures . The Manager-Generation Maintenance, Station Maintenance Supervisor, and the Manager-Operational Quality Assurance main-tain records for their personnel and their procedures to demonstrate that required qualifications have been obtained and are maintained current.
The site Operational Quality Assurance staff perferms surveillance incpections, and audits of special processes performed by the plan staff or site contractors to ensure conpliance with procedures , lA-30 o 7 r/r 7 2J so/
The site Operational Quality Assurance staff perferms surveillance incpections, and audits of special processes performed by the plan staff or site contractors to ensure conpliance with procedures ,
..XI . Test Control Whenever testing is required to demonstrate that a material, part, component, or system vill perform satisfa"torily in service (whether it be prototype, preoperational, prcof, or oper.tional surveillance testing) a test program is instituted employing written and approved procedures which are in accordance with basic requirements establ.shed in Technical Epecifications, drawings, instructions, procurement documents, requirement documents, specifications, codes , s tandards , regulatory requirements , etc.
lA-30 r  7 so/    o 7 r/
The test program provides a means for identificaticn, control, and documentation of all tests and written procedures required for satisfactory accomplishment of the testing.
2J
As required by the test, written test procedures and checklists include:
 
necessary test equip =ent and calibration requirements; taterial requirements; personnel quali-fication requirements; prerequisite conditions; environ = ental conditions; limiting conditions; detailed performance instructions for the testing method including nonconfor ance control; inspection hold points; acceptance, and rejection criteria; data collection requirements; and documentation approval, retention, and storage requirements.
.   .
The Station Superintendent is responsible for the operation and maintenance test programs, including the surveillance test progra= required by the Tech-nical Specifications, Section h.
XI . Test Control Whenever testing is required to demonstrate that a material, part, component, or system vill perform satisfa"torily in service (whether it be prototype, preoperational, prcof, or oper.tional surveillance testing) a test program is instituted employing written and approved procedures which are in accordance with basic requirements establ.shed in Technical Epecifications, drawings, instructions, procurement documents, requirement documents, specifications, codes , s tandards , regulatory requirements , etc. The test program provides a means for identificaticn, control, and documentation of all tests and written procedures required for satisfactory accomplishment of the testing. As required by the test, written test procedures and checklists include: necessary test equip =ent and calibration requirements; taterial requirements; personnel quali-fication requirements; prerequisite conditions; environ = ental conditions; limiting conditions; detailed performance instructions for the testing method including nonconfor ance control; inspection hold points; acceptance, and rejection criteria; data collection requirements; and documentation approval, retention, and storage requirements.
The test progra=s and procedures are prepared by station staff, reviewed by the Plant Operations Review Co==ittee when required by Technical Specifications, and approved by the Station Superintendent.
The Station Superintendent is responsible for the operation and maintenance test programs, including the surveillance test progra= required by the Tech-nical Specifications, Section h. The test progra=s and procedures are prepared by station staff, reviewed by the Plant Operations Review Co==ittee when required by Technical Specifications, and approved by the Station Superintendent.
The Station Superintendent is responsible fbr the performance of the required tests in a correct and timely manner utili::ing written and approved procedures.
The Station Superintendent is responsible fbr the performance of the required tests in a correct and timely manner utili::ing written and approved procedures.
When site contractors are employed for tests, the Station Superintendent is responsible for provisions that require the site contractor to provide a testing program in accordance with this Quality Assurance Plan. He is further responsible for requiring that test results , for which he is responsible, are documented, reviewed, and approved.
When site contractors are employed for tests, the Station Superintendent is responsible for provisions that require the site contractor to provide a testing program in accordance with this Quality Assurance Plan. He is further responsible for requiring that test results , for which he is responsible, are documented, reviewed, and approved.
The Manager-Generation Engineering is responsible for ensuring that required tests for modifications are specified in procurement documents and/or requirement documents. He is further responsible for assisting the TMI Nuclear Station Unit 1 staff in the preparation of station-related test procedures. The Manager-Generation Engineering is responsible for reviewing, documenting, and approving modification-related test results .
The Manager-Generation Engineering is responsible for ensuring that required tests for modifications are specified in procurement documents and/or requirement documents. He is further responsible for assisting the TMI Nuclear Station Unit 1 staff in the preparation of station-related test procedures. The Manager-Generation Engineering is responsible for reviewing, documenting, and approving modification-related test results .
The shnager-Operational Quality Assurance is responsible for the review and concurrence with test requirements, from a quality assurance standpoint, contained in procurement and other requirement documents . The site Quality Control Supervisor is responsible for quality assurance review and concurrence with station tests procedures. The Quality Control Supervisor prepares quality lassurance checklists for site modification, repair and maintenance-type tests which define the monitoring, inspection, and checks Operational Quality Assur-ance persennel vill perform.
The shnager-Operational Quality Assurance is responsible for the review and concurrence with test requirements, from a quality assurance standpoint, contained in procurement and other requirement documents . The site Quality Control Supervisor is responsible for quality assurance review and concurrence with station tests procedures. The Quality Control Supervisor prepares quality     l assurance checklists for site modification, repair and maintenance-type tests which define the monitoring, inspection, and checks Operational Quality Assur-ance persennel vill perform.
.  
  .
..XIII. Handline, Storace, and Shittine The Station Superintendent is responsible for developing and implement .ng general station procedures for the handling, storage, shipping, preservation, and cleaning of =aterial and equipment delivered to or located at Three Idle Island Nuclear Generating Station Unit 1.
 
Under normal circumstances, the manufacturer's specific written instructions and reco==endations along with purchase specification requirements (where applicable) vill be invoked on cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific
. .
=anufacturer requirements , the Station Superintendent may invoke additional requirements in accordance with the station procedures.
XIII. Handline, Storace, and Shittine The Station Superintendent is responsible for developing and implement .ng general station procedures for the handling, storage, shipping, preservation, and cleaning of =aterial and equipment delivered to or located at Three Idle Island Nuclear Generating Station Unit 1. Under normal circumstances, the manufacturer's specific written instructions and reco==endations along with purchase specification requirements (where applicable) vill be invoked on cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific
    =anufacturer requirements , the Station Superintendent may invoke additional requirements in accordance with the station procedures.
The Manager-Generation Engineering is responsible for specifying in the procure = eat dccu=ents and in =odification require =ent documents that written procedures b< used as appropriate for the handling, shipping, storage, cleaning, a .d preservation of =nterials and equipment procured for =odifications.
The Manager-Generation Engineering is responsible for specifying in the procure = eat dccu=ents and in =odification require =ent documents that written procedures b< used as appropriate for the handling, shipping, storage, cleaning, a .d preservation of =nterials and equipment procured for =odifications.
These procedures vill be prepared by contractors or by the station staff as appropria,e. Procedures not involving the station stores facility will be reviewed and approved by the Manager-Generation Engineering when so specified in the p rocurement or requirements documents. Procedures involving the station stores 'acilities vill be reviewed and approved by the Station Superintendent.
These procedures vill be prepared by contractors or by the station staff as appropria,e. Procedures not involving the station stores facility will be reviewed and approved by the Manager-Generation Engineering when so specified in the p rocurement or requirements documents. Procedures involving the station stores 'acilities vill be reviewed and approved by the Station Superintendent.
They viil also be approved by Manager-Generation Engineering when so specified in the require =ent documents .
They viil also be approved by Manager-Generation Engineering when so specified in the require =ent documents .
In the preparation of documents, including procurement documents, station requirement docunents, contractor procedures, station procedures , etc. , consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of =anu-facturing and installation prior to operational acceptance.
In the preparation of documents, including procurement documents, station requirement docunents, contractor procedures, station procedures , etc. ,
consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of =anu-facturing and installation prior to operational acceptance.
The Manager-Operational Quality Assurance is responsible for review and con-currence of pertinent documents and procedures to assure that proper handling, storing, and shipping require =ents have been specified. He is further responsible for ensuring proper implementation of handling, shipping, and storage requirements required of vendors. The Quality Control Supervisor is responsible for review and surveillance of handling, storage, and shipping of materials and equipment by vendors, the station staff, and contractors. The perfor=ance of activities discussed above shall comply with Regulatory Guide 1.39 (March,1973) and the applicable requirements of ANSI U45 2.2-1972.
The Manager-Operational Quality Assurance is responsible for review and con-currence of pertinent documents and procedures to assure that proper handling, storing, and shipping require =ents have been specified. He is further responsible for ensuring proper implementation of handling, shipping, and storage requirements required of vendors. The Quality Control Supervisor is responsible for review and surveillance of handling, storage, and shipping of materials and equipment by vendors, the station staff, and contractors. The perfor=ance of activities discussed above shall comply with Regulatory Guide 1.39 (March,1973) and the applicable requirements of ANSI U45 2.2-1972.
.'7;v/L9I 1A-37  
      .
..XVII. Quality Assurance Records The Vice President-Generation is responsible for es ta! i_____ .e quality assurance record preparation and maintenance requirements in compliance with the applicable requirements of ANSI Nh5 2 9 (Draft-January 1973) in the Operational Quality Assurance Plan. Each Manager and the Station Superintendent are responsible for preparation, review, approval by himself, and implementation of specific Quality Assurance Record Procedures for their areas of responsibility in accordance with the Operational Quality Assurance Pl an.The records which fall within the quality assurance record requirements include those records required by the Technical Specifications, Section 15.6.5 and ANSI h5.2 9 (Draft-January 1973) (Requirements for Collection, Storage,land Maintenance of Quality Assurance Records for Nuclear Power Plants) .
                                                                              '7
The requirements and responsibilities fbr record transmittal are in accordance with docu=ent control procedures as described in Section VI of this Plan.
                                                                            ;v/     L9I 1A-37
Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and retention period of quality assurance records vill be in accordance with the applicable quality assurance record procedures , codes, standards, procurement documents , and applicable parts of this Quality Assurance Plan.
 
. .
XVII. Quality Assurance Records The Vice President-Generation is responsible for es ta! i_____ .e quality assurance record preparation and maintenance requirements in compliance with the applicable requirements of ANSI Nh5 2 9 (Draft-January 1973) in the Operational Quality Assurance Plan. Each Manager and the Station Superintendent are responsible for preparation, review, approval by himself, and implementation of specific Quality Assurance Record Procedures for their areas of responsibility in accordance with the Operational Quality Assurance Pl an. The records which fall within the quality assurance record requirements include those records required by the Technical Specifications, Section 15.6.5 and ANSI h5.2 9 (Draft-January 1973) (Requirements for Collection, Storage,       l and Maintenance of Quality Assurance Records for Nuclear Power Plants) .
The requirements and responsibilities fbr record transmittal are in accordance with docu=ent control procedures as described in Section VI of this Plan. Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and retention period of quality assurance records vill be in accordance with the applicable quality assurance record procedures , codes, standards, procurement documents ,
and applicable parts of this Quality Assurance Plan.
Record storage facilities are in accordance with the apy licable requirements of ANSI Nh5.2 9 (Draft-January 1973).
Record storage facilities are in accordance with the apy licable requirements of ANSI Nh5.2 9 (Draft-January 1973).
The Station Superintendent is responsible for maintaining plant operating records as required in the Technical Specifications . In addition, he is responsible for maintaining inservice inspection records, special test records, Plant Operations Review Co==ittee Minutes, and General Office Review Board Plnutes.
The Station Superintendent is responsible for maintaining plant operating records as required in the Technical Specifications . In addition, he is responsible for maintaining inservice inspection records, special test records, Plant Operations Review Co==ittee Minutes, and General Office Review Board Plnutes.
Line 186: Line 242:
The Manager-Operational Quality Assurance is responsible for pro' riding procedures which ensure the maintenance of records (other than design records and plant operating records) sufficient to furnish objective evidence of activities affecting quality in compliance of the applicable requirements of ANSI Nh5.2.9 (Draft-January 1973). He is also responsible for ensuring the Operational Quality Assurance Staff reviews, concurs with, and audits all Quality Assurance Records Procedures.
The Manager-Operational Quality Assurance is responsible for pro' riding procedures which ensure the maintenance of records (other than design records and plant operating records) sufficient to furnish objective evidence of activities affecting quality in compliance of the applicable requirements of ANSI Nh5.2.9 (Draft-January 1973). He is also responsible for ensuring the Operational Quality Assurance Staff reviews, concurs with, and audits all Quality Assurance Records Procedures.
Due to the difference in the above requirements and previous record require-ments, the possibility exists that it vill be impossible to produce all records, in accordance with this plan, for events that occurred prior to the implementation of this plan. For this reason, it is planned to maintain the existing records and employ the guidelines of the Operating Quality Assurance Plan in the future.
Due to the difference in the above requirements and previous record require-ments, the possibility exists that it vill be impossible to produce all records, in accordance with this plan, for events that occurred prior to the implementation of this plan. For this reason, it is planned to maintain the existing records and employ the guidelines of the Operating Quality Assurance Plan in the future.
1F 7 9t 7 Isu/G9L 1A hL  
1F     7 9t 7 Isu/     G9L 1A hL
.. .Audit reports are transmitted via the Manager-Operational Quality Assurance to the responsible managers or outside organizations. It is the responsibility of the cognizant manager or the person in the outside organization specifically ldesignated as responsible, to review the audit report and to ensure that corree-tive action is accomplished in a timely manner. The audit team leader is responsible fbr timely followup action (including reaudits) as required to ensure corrective action has been taken.
 
Audit findings are documented in the audit report and all corrective action, follovup action, and reaudits are documented with reference to the original audit report.
. . .
Audit reports are transmitted via the Manager-Operational Quality Assurance to the responsible managers or outside organizations. It is the responsibility of the cognizant manager or the person in the outside organization specifically   l designated as responsible, to review the audit report and to ensure that corree-tive action is accomplished in a timely manner. The audit team leader is responsible fbr timely followup action (including reaudits) as required to ensure corrective action has been taken. Audit findings are documented in the audit report and all corrective action, follovup action, and reaudits are documented with reference to the original audit report.
Regular audit teat me=bers (usually part of the Operational Quality Assurance staff) are tra4 .ed in accordance with the quality assurance training progra=.
Regular audit teat me=bers (usually part of the Operational Quality Assurance staff) are tra4 .ed in accordance with the quality assurance training progra=.
Members of audit tea =s, who are not regular auditors, vill be indoctrinated or trained sufficiently to perform the specific audits for which they are as signed.
Members of audit tea =s, who are not regular auditors, vill be indoctrinated or trained sufficiently to perform the specific audits for which they are as signed.
Line 194: Line 251:
In addition to the above-described audit program, the General Office Review Board conducts special reviews, audits, and investigations as requested by the Company President or as deemed necessary to confirm the adequate function-ing of the plant and corporate staff. These audits may be assigned to other qualified persons having no direct line of responsibility for day-to-day operations of the plant, including Metropolitan Edison Conpany Operational Quality Assurance personnel. To prevent unnecessary duplication, so=e General Office Review Board audits may also serve to satisfy audits scheduled by the Manager-Operational Quality Assurance. The results of General Office Review Board audits are reported to the Metropolitan Edison Co=pany President, 'Vice President-Generation, Manager-Operational Quality Assurance, Manager-Generating Stations, Station Superintendent, and others, as appropriate.
In addition to the above-described audit program, the General Office Review Board conducts special reviews, audits, and investigations as requested by the Company President or as deemed necessary to confirm the adequate function-ing of the plant and corporate staff. These audits may be assigned to other qualified persons having no direct line of responsibility for day-to-day operations of the plant, including Metropolitan Edison Conpany Operational Quality Assurance personnel. To prevent unnecessary duplication, so=e General Office Review Board audits may also serve to satisfy audits scheduled by the Manager-Operational Quality Assurance. The results of General Office Review Board audits are reported to the Metropolitan Edison Co=pany President, 'Vice President-Generation, Manager-Operational Quality Assurance, Manager-Generating Stations, Station Superintendent, and others, as appropriate.
The following list of audits is representative of the areas to be audited by the Operational Quality Assurance Organization to assure compliance with the Operational Quality Assurance Pmgra=:
The following list of audits is representative of the areas to be audited by the Operational Quality Assurance Organization to assure compliance with the Operational Quality Assurance Pmgra=:
I.Generation Division Staff A.Generation Engineering Staff 1.Design Control (including fuel) 2.Procurement Control 3.Training h.Document Control S.Nonconfor=ance/ Corrective Actien control 6.Modification Control 7-n}o,/69J b 1A-h6  
I. Generation Division Staff A. Generation Engineering Staff
...B.Generation ?&intenance Staff 1.Document Control
: 1. Design Control (including fuel)
, 2.Training 3.Procurement Control h.Ihintenance Control (includes Maintenance, ?bdification, and Repair) 5 Nonconformance/ Corrective Action Control 6.Special Process Control (Welding, Heat Treating, etc.)
: 2. Procurement Control
C.Generation Operaticns Staff 1.Document Control 2.Training 3.Procurement Control h.Nonconformance/ Corrective Action Control D.Operational Quality Assurance Staff 1.Audit Control 2.Document Control 3 Traini ng h.Nonconformance/ Corrective
: 3. Training
.>ct< on Control 5 Vendor Surveillance and In ,. . xion II.Plant A.TMI Nuclear Station Unit 1 Staff 1.Procedure / Technical Specification Co=pliance with respect to:
: h. Document Control S. Nonconfor=ance/ Corrective Actien control
a.Administrative Functions b.Fuel Handling c.Operations d.Maintenance, Repair, Ibdification
: 6. Modification Control
, e.Design f.Health Physics / Chemistry g.Environmental Ibnitorirg h.Inservice Inspection i.Surveillance Testing 2.Document Control 3.Nonconformance/ Corrective Action h.Training 5 Procurement Control 6.Material Handling, Storing, Issuing, Cleaning, Preserving, Shipping Centrol 7.Calibration 8.Emergency Plan r7*'1 jV/'I 1A-h7  
                                                                              -
. . . .h.The Vice President-Generation of Metropolitan Edison Company receives a monthly report of the project QA organization activities.
n 7
5 The Vice President-Generation receives a copy of a semi-annual report on the activities of the GPUSC QA Department.
                                                                          } b o,/ 69J 1A-h6
6.The Vice President-Generation participates in a management review of the effectiveness of the GPUSC QA programs at least once each calendar year.7 The Vice President-Generaticn has line responsibility for the TNI station staff which officially accepts equipment and systems after successful startup and test. The official acceptance involves a review of all documentation related to the equipment or system which is being accepted to verify that the equipment or system is ready for operation and the documentation is complete.
 
Subsequent to commercial operation of TIE Unit No .1, the Vice President-Generation may utilize the services of GPUSC to support design, =odification, maintenance, repair, procurement , special processes , inspections , and tests . In such instances, the GPUSC personnel vill either be integrated into the Metropolitan Edison Company Organization and they will function in the same manner as employees of Metropolitan Edison Company, or Metropolitan Edison Company will establish and implement organizational, administrative, and reporting arrange =ents equivalent to those described previously for the pre-ec=mercial phase of the project.
. ..
If the latter arrangement is utilized, the Vice President-Generation vill review and approve the Project Organization and Resrcasibilitiee Document and the Project QA Plan. He vill alsc ensure that appropriate audits are conducted of the GPUSC QA program.
B. Generation ?&intenance Staff
: 1. Document Control                                       ,
: 2. Training
: 3. Procurement Control
: h. Ihintenance Control (includes Maintenance, ?bdification, and Repair) 5   Nonconformance/ Corrective Action Control
: 6. Special Process Control (Welding, Heat Treating, etc.)
C. Generation Operaticns Staff
: 1. Document Control
: 2. Training
: 3. Procurement Control
: h. Nonconformance/ Corrective Action Control D. Operational Quality Assurance Staff
: 1. Audit Control
: 2. Document Control 3   Traini ng
: h. Nonconformance/ Corrective .>ct< on Control 5   Vendor Surveillance and In ,. . xion II. Plant A. TMI Nuclear Station Unit 1 Staff
: 1. Procedure / Technical Specification Co=pliance with respect to:
: a. Administrative Functions
: b. Fuel Handling
: c. Operations                             ,
: d. Maintenance, Repair, Ibdification
: e. Design
: f. Health Physics / Chemistry
: g. Environmental Ibnitorirg
: h. Inservice Inspection
: i. Surveillance Testing
: 2. Document Control
: 3. Nonconformance/ Corrective Action
: h. Training 5   Procurement Control
: 6. Material Handling, Storing, Issuing, Cleaning, Preserving, Shipping Centrol
: 7. Calibration
: 8. Emergency Plan r7     *'1 jV/     'I 1A-h7
 
. . . .
: h. The Vice President-Generation of Metropolitan Edison Company receives a monthly report of the project QA organization activities.
5   The Vice President-Generation receives a copy of a semi-annual report on the activities of the GPUSC QA Department.
: 6. The Vice President-Generation participates in a management review of the effectiveness of the GPUSC QA programs at least once each calendar year.
7   The Vice President-Generaticn has line responsibility for the TNI station staff which officially accepts equipment and systems after successful startup and test. The official acceptance involves a review of all documentation related to the equipment or system which is being accepted to verify that the equipment or system is ready for operation and the documentation is complete.
Subsequent to commercial operation of TIE Unit No .1, the Vice President-Generation may utilize the services of GPUSC to support design, =odification, maintenance, repair, procurement , special processes , inspections , and tests . In such instances, the GPUSC personnel vill either be integrated into the Metropolitan Edison Company Organization and they will function in the same manner as employees of Metropolitan Edison Company, or Metropolitan Edison Company will establish and implement organizational, administrative, and reporting arrange =ents equivalent to those described previously for the pre-ec=mercial phase of the project. If the latter arrangement is utilized, the Vice President-Generation vill review and approve the Project Organization and Resrcasibilitiee Document and the Project QA Plan. He vill alsc ensure that appropriate audits are conducted of the GPUSC QA program.
Consistent with Section 13 of the Final Safety Analysis Report for TFE Unit No.1, maintenance and system modifications, identified during the conduct of initial testing as being necessary, may be accomplished in accordance with the provision of the GPUSC Start-up and Test Quality Assurance Plan.
Consistent with Section 13 of the Final Safety Analysis Report for TFE Unit No.1, maintenance and system modifications, identified during the conduct of initial testing as being necessary, may be accomplished in accordance with the provision of the GPUSC Start-up and Test Quality Assurance Plan.
n ee i c- ,/243 b 1A-50}}
n ee i b c- ,/ 243 1A-50}}

Revision as of 14:03, 19 October 2019

Forwards Info Re Operational QA Plan to Be Submitted as Amend to Fsar,In Response to NRC 740312 Request
ML19210B210
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/25/1974
From: Arnold R
METROPOLITAN EDISON CO.
To: Giambusso A
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7911040140
Download: ML19210B210 (16)


Text

I . ,

AEC D1 .I3CTION FOR PART 50 DOCKET MA. I_A_L, 2569

-

(TEMPORARY FORM) CONTROL NO:

DTD y

[D)[ F {y f gg

'

FILE:

ROM: DATE OF DOC DATE REC'D LTR MEMO RPT OT!ER E.ictropolitan Edison Company Reading, Penn. 19603 Mr. R.C. Arnold 3-25-74 3-27-74 X TO: ORIG CC OTHER SENT AEC PDR XXX SENT LOCAL PDR XXX A. Giambusso 1 signed CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

XXX 21 50-289 DESCRIPTION: ENCLOSURES:

Ltr trans the following... Information concerning Operational Quality Assurance Plan, App. lA, which will be submitted as an amendment to the FSAR.

ACKNOWLE ED (21 cys enc 1 rec'd)

PLANT NAME: Three Mile Island #1 rp FOR ACTION /INFORMATION 3-27-74 JB BUTLER (L) /SCIMENCER(L) ZIDIANN(L) REGAN(E)

W/ Copie8 W/YCopies W/ Copies W/ Copies CLARK (L) STOLZ(L) DICKER (E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALLO(L) KNIGHION(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L) SCHDIEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies m INTEP27AL DISTRIEUTION REG FITU J TECli REVIEW DE; TON A/T I::D

  1. AEC PDR HENDRIE GRIMES LIC ASST BRAIIL'll

/ OGC, R00'i P-506A SCHROEDER GAMMILL DIGGS (L) SALTZMAN vMUNTZING/ STAFF MACCARY KASTNER B. HURT GEARIN (L)

CASE KNIGHT BALLARD

/GOULBOURNE (L) PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L) MCDONALD

/ BOYD SHA0 MAIGRET (L) DUBE w/ Input

/M00RE (L)(L'R) STELLO ENVIRO

/ REED (E)

DEYOUNG(L)(EUR) HOUSTON v MULLER I F0 SERVICE (L)

SKOVHOLT (L) NOVAK DICKER SHEPPARD (L)

C. MILES P. COLLINS ROSS KNIGHTON SLATER (E) 3* EIEC DENISE IPPOLITO YOUNGBLOOD SMITH (L) V 0' Leary

/ REG OPR / TEDESCO /REGAN TEETS (L) / Thornburg FILE & REGION (3) LONG / PROJECT LDR WADE (E) /Klecker MORRIS LAINAS St. Marv (2) WILLIAMS (E) / Kari STEELE BENAROYA HARLESS '-

WILSON (L) /Paton

/ VOLIFER [2 ) , ,

, EXTERNAL DISTRIEUTICM irn7 7 ' fl fd

'l - LOCAL PDR Harrisburg. Pa. I'V' '"V ff

,- DTIC(ALE?2:ATHY) (1)(2)(10)-NATIO"AL LAD'S 1-PDR-SAN /LA/NY 1 - NSIC(2UCRANA!i) /1-ASLBP(E/U Bidr,,Rm 529) 1-GERALD LELLCUC S ASLB(YORE l-U. PEN.iINGTO:;, Em E-201 GT BR00KiiAVEN NAT. LAB l-CONSULTANT' S 1-AGMED(Ruth Guast:1

/16 - CYS ACRS M3%KLI Sent to Goulbourne Ni3CIARK/ BLUNE/AGBABIAN RM- B-12 7, GT.

3-27-74 1-GURALD ULRIKSON.. I' L Q.. MULLER..F-309 G'

. -

h c.i!dtery Fi v.

--

  • fg c2 gu mre 7:n ma rss METROPOLITAN EDISON COMPANY

'C'~ ' WcE 30X N2 AEADING. PENNSYLV ANI A 196C': TELEPHONE 215 - 9 3-2601 March 25, 197h

,;, -~ .,

/ '. *

, ,, \

Mr. A. Giambusso ,.

bi!i[ki[it, r.,

t

,

Deputy Director for Reactor Projects H /,l4;' 0,4 /d//

Office of Regulation ' i-

-

' . * .)

'~"

U. S. Atomic Energy Commission [, ,'

Washington, DC 205h5 T(/ ,,

..., u.,

s'/ D.,r i q9 h '

-[s

Dear Mr. Giambusso:

.

Subject:

':'hree Mile Island Nuclear Station Unit 1 c-> Docket :Io. 50-289 Attached are one original and 20 copies of information which vill be included as an amendment to the Three Mile Island Unit 1 FSAR to modify the Operational Quality Assurance Plan, Appendix 1A. This information is submitted to resolve objections in the previous filing noted in Mr. Schwencer's letter of March 12, 197h. The amendment has been prepared, is being printed, and will be submitted shortly.

Sincere,17,

,

, h \ l 'I ,

  • '

_ , ; . -- -*qi,, .

~ . . ._ . I ~

(Y',fsf

'

N R. C. AR'~0LD

, sM> . : .

v-\ Vice President El v4,s D ~  ;[i RCA:RSB:1v H

  • t Attachments

'

E.' i- -

,

ec: J. P. O'Reilly e.s

%,,

-

, _ , ,

, .-f

>

W. A. Verrochi ' #

<.&

'

/

- -, n'1 e c r, o GVvU

. ,

.

Manaaer-Onerational Quality Assurance .

The Manager-Operational Quality Assurance, who reports to the Vice President-Generation, has the responsibility for ensuring the detailed develop =ent, direction, and overall coordination of operational quality assurance activities for Three Mile Island Nuclear Generating Station Unit 1 which covers all activities affecting quality, including operations , inservice inspection, =aintenance, refueling, codifications, engineering support, and procure =ent for the Three Mile Island Nuclear Generating Station Unit 1. The Manager-Operational Quality Assurance has the authority and organizational freedc= to identif'y quality problems and provide s olutions .

In the detailed imple=entation of this progra=, the Manager-Operational Quality Assurance vill coordinate with the GPU Service Corporation Manager of Quality Assurance. This coordination is to ensure that all GPU co=panies e= ploy the se=e basic appr,;;- A to operational quality assurance programs and procedures in the interest of standardization and =ulti-plant use where feasible.

Specific responsibilities of the Manager-Operational Quality Assurance include the following ite=s:

1. Development and i=plementation of the Operating Quality Assurance Progra= and changes thereto.
2. Maintenance of Operaticnal Quality Assurance organization in accor-dance with the Operational Quality Assurance Progra=.

3 Develop =ent and implementation of a quality assurance training progra= for quality assurance personnel. He also ensures that quality assurance indoctrination is provided to appropriate per-sonnel outside of the quality assurance organization.

h. Supervision and direction of generation depart =ent staff quality assurance engineers and the site quality assurance organization under the site Quality Control Supervisor.

5 Approval or concurrence with Metropolitan Edison Co=pany and vendor quality assurance and quality control documents (such as NDE and special process procedures) in accordance with this Quality Assurance Plan. ,

6. Concurrence, fro = a quality assurance standpoint, with design and engineering docu=ents such as specifications, drawings, and instal-lation require =ents used for equip =ent or site work.

7 Concurrence with the Quality Assurance Syste=s List.

8. Review and approval of audit and surveillance schedules, supervision l of the planning for audits and surveillance, review of results of audits and surveillance, and ensuring of follow-up correction of nenConfor=ances.

r ^7 7

1A-6 ,b0[

l dJL

. ,

Station Sucerintendent The Station Superintendent is directly responsible for the safe operation of Three LEle Island Nuclear Generating Station Unit 1. His specific responsi-bilities include the following:

1. Operating the Three Mile Island Nuclear Generating Station Unit 1 in compliance with the requirements of the operating license including Technical Specifications and this Operating Quality Assurance Plan.
2. Initiating corrective action (including shutdown of the unit as required by the Technical Specifications) when operations are not being conducted in accordance with the requirements contained in ite: "1" above.
3. Ensuring that conditions adverse to quality, when identified, are corrected for all activities involving operations, maintenance, repair, refueling , testing, and site engineering.
h. Approving and implementing station administration, operation, testing, repair, maintenance, refueling, health physics , environ = ental, and emergency procedures as required by the Technical Specifications, Section 15.6.1 and 15.6.2.

5 Ensuring that =cdifications to structures, components, and syste=s are properly coordinated and that necessary safety precautions; e.g. , tag outs, draining of systems , designation of exclusion areas, l etc. , are perfor=ed in accordance with written procedures.

6. Ensuring that plant purchase requisitions are prepared using approved specifications which have received required quality assurance and engineering reviews.

7 Ensuring that station staff training and qualifications are main-t ained.

8. Ensuring inservice inspections a 3 performed as required.

The Station Superintendent is assisted in carrying out the above responsibilities by the Station Engineer, the Maintenance Supervisor, and the Operations Supervisor, and their staffs. The organization, responsibilities, and qualifications of the station staff are specified in station procedures.

'

Manager-Generation Enrineering The Manager-Generation Engineering reports to the Vice President-Generation and has the responsibility for the detailed development, direction, and overall co-ordination of engineering activities for the Three FEle Island Nuclear Genera *> ng Station Unit 1. This includes modifications, engineering support, and procurem. 't for the station. The Manager-Generation Engineering is responsible for providing technical support to other Generation Department groups, including Station Super-intendents.

lA-10 -m 7 1 b b 7 ^2 'a 3

. .

II. Quality Assurance Program This program is applied to the safety related items of the Three Mile Island Nuclear Generating Station Unit 1 that prevent or mitigate the consequences of postulated accidents which could cause undue risk to the health and safety of the public. 'A summary of structures and systems covered in whole or in part by this program are identified in Atte:h=ent A. The actual boundaries of these systems and structures vill be specified in the Quality Assurance Systems Lists. The Manager-Generation Engineering, with concurrence of the Manager-Operational Quality Assurance, is responsible for development of this list.

The fianager-Operational Quality Assurance has the direct responsibility for ensuring that this Operating Quality Assurance Program is implemented and that it provides for control of all activities affecting quality on nuclear safety related ite=s. He is also responsible for ensuring that the program is modified and updated as standards, regulations, results, and experience dictate. The various groups involved in the Operational Quality Assurance Program, and their respcasibilities, are described in Section I of this Plan.

The Operating Quality Assurance Program is described by written policy, plan, and procedure documents. The basic company policy is established by the President in his Policy Statement. This Operating Quality Assurance Plan is issued by the Vice President-Generation. The procedures, which are the Operating Quality Assurance Program's detailed requirements, are originated and approved as shown in Attachment B to this plan, Quality Assurance Program Procedcre Categories and Approvals.

An outline of the quality assurance procedures to be used to implement the Operating Quality Assurance Program is included in Attachment C to this plan.

The Manager-0perational Quality Assurance is responsible for maintainirg a comprehensive training program for both the original and refresher training of personnel in the Operating Quality Assurance Staff. He also ensures that quality assurance indoctrination is given to Generation Department personnel who are not in the Operating Quality Assurance Staff but whose job responsibility will affect quality. The training program shall comply with Regulatory Guide 1.6 (March 1971) and Regulatory Guide 1,58 ( August 1973) including appliccble require-ments of ANSI Nh5 2.6-1973 and shall censist of lectures, formal schools, job experience, and individual study, as appropriate.

Each manager maintains formal training programs and procedures to ensure the proper job relhted training and qualification of his personnel. The Station Superintendent is responsible for the indoctrination and training of plant staff personnel performing activities affecting quality or operations, and for ensuring that, where required by FSAR Section 15.6.1, operators are formally licensed or qualified.

All contractors who perform engineering, construction, or other technical services on structures, components, or systems are required to meet those portior.s of the AEC Regulation 10CFR50, Appendix 3, which are applicable to their services and the materials and equipment which they supply. The Manager-Generation

'

r'7 su

,M

. .

Engineering is responsible for ensuring that these requirements are contained in the specifications and purchase documents as appropriate along with the quality assurance safety class of the component or system involved.

The Operating Quality As surance Progr1= requirec that the Vice President-Generation performs a management review, at least every two years , of the effectiveness of the Operating Quality Assurance Program. The Vice President-Generation vill utilize a group independent of the Operational Quality Assurance Group to perform these reviews or audits. Additional audits and reviews of selected portions (e.g. , abnor=al occurences, violations of Technical Specifica-tions, tests, experiments, etc. ) of the Operating Quality Assurance Program will be performed by PORC, GCRB, and/or the offsite technical staff in accordance with Section 15.6.1 of the FSAR.

Metropolitan Edison Company will comply with American National Standards N18.7-1972 and Nh5.2-1971 and Regulatory Guides 1.33 (Novenber 1972) ,1.8 (March 1971) ,

and 1.58 ( August 1973), as well as other guides published in the booklet " Guidance on Operational Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants" (October 1973) . It is the policy of Metropolitan Edisen Company to review revisions of the aforementioned documents and included referenced standards for applicability and incorporation into the Quality Assurance Program.

n'C l ~b u. ,/ dJJ

.

lA-lh

. .

III. Desien, Modification, Maintenance, and Repair Control A. Design mad Modification l

The Manager-Generation Engineering is responsible for controlling design work and administering design control activities (including design interfaces) for the modification of nuclear safety related structures, co=ponents, and systems. These activities shall comply with Regulatcry Guide 1.6h (October 1973) and the applicable requirements of ANSI Nh5.2.11 (Draft-May 1973). ,

The Manager-Generation Engineering is responsible for the preparation of the Quality Assurance Systems List. "he Lhnager-Operational Quality Assurance is responsible for reviewing the Quality Assurance Systems List for concurrence on quality assurance aspects. The Quality Assurance Systems List is a list of those systems which are within the scope of this Quality Assurance Plan.

Design control is implemented by means of Generation Engineering Procedures which include: design considerations; design review requirements; internal and external interface control considerations; and design document review, approval, distribution, control, and revision requirements. Design considera-tions include, as appropriate: physics , stress, materials , ther=al hydraulic, radiation and accident analysis; appropriate design bases , codes, standards, and regulations; acceptance and rejection criteria; and quality assurance / quality control. Design verification includes the use of formal design reviews, checks or tests as appropriate to ensure the adequacy of the design with regard to design considerations. Design reviews may be conducted by means of the same, an alternate, or a simplified calculational method or by the performance of a suitable testing program. A design review vill be performed by an individual or group other than the individual or group who performed the original design, but who may be frc= the same organization.

The bhnager-Generation Engineering is responsible for ensuring that desi6n con trol procedures, whether the work is done by Metropolitan Edison Company or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. A=ong other things, satisfactory design control requires that an independent design verification is performed.

Proposed plant =odification packages and their implementation are the responsi-bility of the Manager-Generation Engineering and controlled by means of written Generation Engineering procedurec. This coordination includes the necessary interface with the Station Staff in regard to station scheduling, station procedure preparation and approval, Plant Operations Revier Co==ittee and General Office Review Board review and approval, etc. Proposed station =odifications are reviewed and approved by the Plant Operations Review Co==ittee and the General Office Review Board, prior to their implementation, when required by the Technical Specifications, Section 6.1.

The Manager-Generation Engineering is responsible for the timely approval and updating of specifications and drawings, as well as changes or deviations thereto, utilized for purchase or installation of materials, parts, or components.

Any other design documents, specifications, drawings , installation requirements, and changes thereto, are approved in the same manner. -

.,

,I b u 7 ,,

d Jd

.

lA-15

.

IV. Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, ec=ponents, and services required to perform design, maintenance, repair, modification, operation, test, refueling, inservice inspection, and quality assurance functions . Such docu=ents may be prepared by Metropolitan Edison Conpany or by a design contractor or agent and include purchase requisitions, purchase orders, service agreements and invoked speci-fications , drawings, etc. In any case, the procure =ent document preparation shall comply with ANSI Nh5 2-1971 and the applicable requirements of ANSI Nh5 2.13 (Draft-May 1973) .

Procurement documents prepared by or for the Generation Division shall be prepared, reviewed, approved, revised, and controlled in accordance with the Generation Division procedures " Procurement Document Control." The preparation, review, and approval of engineering procedures is the responsibility of the Manager-Genebation Engineering. It requires that , in the preparation of procurement documents, consideration be given to at least the ite=s listed in Table IV-1.

Frocurements of materials, parts, or components are initiated by purchase requisitions prepared by the station staff or by others in the Generation Di vi sion . The Generation Division procurement procedures require that an organization preparing a requisition ensures that all applicable items listed in Table IV-1 are considered and included as appropriate in the requisition, invoked specifications , or drawings.

For station initiated purchase requisitions, the Station Superintendent is responsible for the determination of the system or co=ponent safety class in accordance with the Quality Assurance Syste=s List. If the classification is unclear, he contacts Generation Engineering for resolution. For items within the scope of this Quality Assurance Plan, purchase rdQuisitions and invoked requirements are to be reviewed for concurrence by the site Quality Control Supervisor. Purther, if the requirements invoked by the purchase requisition are not taken from current approved Generation Engineering specifi-cations or drawings, then Generation Engineering approval of the requisition and invoked requirements is required.

For cases where requisitions are not prepared by the station, the requisition and invoked requirements, including specifications prepared by outsa de organizations, must be reviewed for concurrence by the Generation Engineering and Operational Quality Assurance staffs.

After puchase requisitions have received the required approvals and con-currences described above, they are converted to purchase orders and selection of vendors is controlled as described in Criterien VII. It should be noted that under no circu= stances will purchase requisition require =ents be altered (except for pricing and quantity) during order placement unless review and concurrence is obtained from those who were originally required to review, concur with, and approve the requisition as described above.

< n

.(

lA-16 IsU/ dJ!

. .

VI. Document Control A standard Generation Division procedure for document control includes basic generic controls which are to be incorporated into specific written procedures by each manager and the Station Superintendent for use by himself and his staff.

The basic procedure is prepared in accordance with this Operational Quality Assurance Plan and approved by the Vice President-Generatien. Each Manager and the Station Superintendent are responsible for the preparation, approval, and implerentation of his group's procedure in accordance with the requirements of the Generation Division procedure.

.

The Generation Division document control procedure requires that documents be controlled as appropriate considering the type of document involved and its importance to safety. ' Accordingly, it specifies the types of documents which must be controlled; identifies the difference between controlled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires lists of effective revisions be issued period-ically; requires distribution lists for the documents to be maintained by the distributors; requires that distributors transmit controlled documents using Generation Division for=s internally and approved for=s externally; and requires holders of controlled copies of documents to assume responsibility for the document and revisions as well as to certify that the document and/or revisions are entered and implemented. Types of documents which are controlled to various degrees include Technical Specifications, FSAR, Quality Assurance Plan, procedures (such as, quality assurance, operation, repair, maintenance, health physics, fuel handling, modification, administrative, and environmental procedures), specifications,

-u drawings, inspection records, and and testand noncenformance results, procurement corrective documents, k.ality assurance action documentatio The Generation Division document control procedure further requires that each Bhnager and the Station Superintendent provide in their procedures for measures:

to ensure documents are available when required; to properly review and approve documents such as procedures, instructions, specifications, drawings, etc. ; to provide the same reviews and approvals for changes to documents as were required of the original document (unless the review and approval authority is delegated by Metropolitan Edison Co=pany to another responsible and qualified organization);

to require that review and approval organizations have access to pertinent infbr=a-tion and adequate knowledge of the original document intent; to ensure that approved changes be promptly transmitted fbr incorporaticn into documents; and to ensure that obsolete or superseded documents are eliminated from the syste=

and not used. Attachments B and D of this plan provide lists of procedure and document categories. These appendices specify review, concurrence, and approval requirements for the i.:cluded procedures and documents .

The Superintendent of the Three hule Island Nuclear Generating Station Unit 1 is responsible for the implementatien of the document control system for all ins tructions , procedures , drawings , and other controlled documents received or prepared at the generating station for use in administering, operating, testing, maintaining, and modifying the nuclear safety-related structures, cocponents, and systems . The Superintendent of the TMI Station Unit 1 vill ensure that no changes are made to site instructions, procedures , and drawings unless such 1A-23 1567 238

. .

IX. Control of Srecial Processes For work performed by vendors or by Matropolitan Edison Company, written procedures are established and qualified, as required, for special processes, such as velding, heat treating, cleaning, and nondestructive examination (NDE) to ensure ecmpliance with applicable codes, standards, design specifications, and vendor's requirements. '4 hen special processes and qualification require-ments are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requi rements . The performance of special processes as discussed above shall comply with Regulatory Guides 1.37 (March 1973) and 139 (March'1973) and applicable requirements of ANSI Nk5 2.1-1973 and ANSI Nh5.2.3-1973.

The Manager-Generation Engineering, the Manager-Generation Maintenance, and the Station Superintendent are responsible for requiring vendors, in procure-sent documents, to control special processes in accordance with the above requirements. The Manager-Operational Quality Assurance is responsible for quality assurance review and concurrence of procurement documents including review of requirements for control of special processes .

As described above, it is required that special processes be performed in accordance with written procedures. The folleving reviews and approvals are required fcr special process procedures submitted by vendors in accordance with procurement document requirements and for all Metropolitan Edison Cc=pany special process procedures:

1. Special prccess procedures other than nondestructive examination procedures are reviewed for concurrence with quality assurance requirements by Operational Quality Assurance and approved by the Manager-Generation Engineering or Manager-Generation . - inten-ance, as appropriate.
2. Nondestructive examination procedures are approved by the Manager-Operational Quality Assurance. However, if required by applicable codes or standards, he also ensures that the procedures are approved by formally qualified examiners prior to granting his approval.

The Manager-Generation Maintenance and the Station Maintenance Supervisor are responsible for ensuring the personnel performing special processes under their cognizance are qualified and are using qualified procedures in accordance with applicable codes, specifications , and standards . The Manager-Operational Quality Assurance is responsible for the qualifications of NDE personnel and procedures . The Manager-Generation Maintenance, Station Maintenance Supervisor, and the Manager-Operational Quality Assurance main-tain records for their personnel and their procedures to demonstrate that required qualifications have been obtained and are maintained current.

The site Operational Quality Assurance staff perferms surveillance incpections, and audits of special processes performed by the plan staff or site contractors to ensure conpliance with procedures ,

lA-30 r 7 so/ o 7 r/

2J

. .

XI . Test Control Whenever testing is required to demonstrate that a material, part, component, or system vill perform satisfa"torily in service (whether it be prototype, preoperational, prcof, or oper.tional surveillance testing) a test program is instituted employing written and approved procedures which are in accordance with basic requirements establ.shed in Technical Epecifications, drawings, instructions, procurement documents, requirement documents, specifications, codes , s tandards , regulatory requirements , etc. The test program provides a means for identificaticn, control, and documentation of all tests and written procedures required for satisfactory accomplishment of the testing. As required by the test, written test procedures and checklists include: necessary test equip =ent and calibration requirements; taterial requirements; personnel quali-fication requirements; prerequisite conditions; environ = ental conditions; limiting conditions; detailed performance instructions for the testing method including nonconfor ance control; inspection hold points; acceptance, and rejection criteria; data collection requirements; and documentation approval, retention, and storage requirements.

The Station Superintendent is responsible for the operation and maintenance test programs, including the surveillance test progra= required by the Tech-nical Specifications, Section h. The test progra=s and procedures are prepared by station staff, reviewed by the Plant Operations Review Co==ittee when required by Technical Specifications, and approved by the Station Superintendent.

The Station Superintendent is responsible fbr the performance of the required tests in a correct and timely manner utili::ing written and approved procedures.

When site contractors are employed for tests, the Station Superintendent is responsible for provisions that require the site contractor to provide a testing program in accordance with this Quality Assurance Plan. He is further responsible for requiring that test results , for which he is responsible, are documented, reviewed, and approved.

The Manager-Generation Engineering is responsible for ensuring that required tests for modifications are specified in procurement documents and/or requirement documents. He is further responsible for assisting the TMI Nuclear Station Unit 1 staff in the preparation of station-related test procedures. The Manager-Generation Engineering is responsible for reviewing, documenting, and approving modification-related test results .

The shnager-Operational Quality Assurance is responsible for the review and concurrence with test requirements, from a quality assurance standpoint, contained in procurement and other requirement documents . The site Quality Control Supervisor is responsible for quality assurance review and concurrence with station tests procedures. The Quality Control Supervisor prepares quality l assurance checklists for site modification, repair and maintenance-type tests which define the monitoring, inspection, and checks Operational Quality Assur-ance persennel vill perform.

.

. .

XIII. Handline, Storace, and Shittine The Station Superintendent is responsible for developing and implement .ng general station procedures for the handling, storage, shipping, preservation, and cleaning of =aterial and equipment delivered to or located at Three Idle Island Nuclear Generating Station Unit 1. Under normal circumstances, the manufacturer's specific written instructions and reco==endations along with purchase specification requirements (where applicable) vill be invoked on cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific

=anufacturer requirements , the Station Superintendent may invoke additional requirements in accordance with the station procedures.

The Manager-Generation Engineering is responsible for specifying in the procure = eat dccu=ents and in =odification require =ent documents that written procedures b< used as appropriate for the handling, shipping, storage, cleaning, a .d preservation of =nterials and equipment procured for =odifications.

These procedures vill be prepared by contractors or by the station staff as appropria,e. Procedures not involving the station stores facility will be reviewed and approved by the Manager-Generation Engineering when so specified in the p rocurement or requirements documents. Procedures involving the station stores 'acilities vill be reviewed and approved by the Station Superintendent.

They viil also be approved by Manager-Generation Engineering when so specified in the require =ent documents .

In the preparation of documents, including procurement documents, station requirement docunents, contractor procedures, station procedures , etc. ,

consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of =anu-facturing and installation prior to operational acceptance.

The Manager-Operational Quality Assurance is responsible for review and con-currence of pertinent documents and procedures to assure that proper handling, storing, and shipping require =ents have been specified. He is further responsible for ensuring proper implementation of handling, shipping, and storage requirements required of vendors. The Quality Control Supervisor is responsible for review and surveillance of handling, storage, and shipping of materials and equipment by vendors, the station staff, and contractors. The perfor=ance of activities discussed above shall comply with Regulatory Guide 1.39 (March,1973) and the applicable requirements of ANSI U45 2.2-1972.

.

'7

v/ L9I 1A-37

. .

XVII. Quality Assurance Records The Vice President-Generation is responsible for es ta! i_____ .e quality assurance record preparation and maintenance requirements in compliance with the applicable requirements of ANSI Nh5 2 9 (Draft-January 1973) in the Operational Quality Assurance Plan. Each Manager and the Station Superintendent are responsible for preparation, review, approval by himself, and implementation of specific Quality Assurance Record Procedures for their areas of responsibility in accordance with the Operational Quality Assurance Pl an. The records which fall within the quality assurance record requirements include those records required by the Technical Specifications, Section 15.6.5 and ANSI h5.2 9 (Draft-January 1973) (Requirements for Collection, Storage, l and Maintenance of Quality Assurance Records for Nuclear Power Plants) .

The requirements and responsibilities fbr record transmittal are in accordance with docu=ent control procedures as described in Section VI of this Plan. Requirements and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and retention period of quality assurance records vill be in accordance with the applicable quality assurance record procedures , codes, standards, procurement documents ,

and applicable parts of this Quality Assurance Plan.

Record storage facilities are in accordance with the apy licable requirements of ANSI Nh5.2 9 (Draft-January 1973).

The Station Superintendent is responsible for maintaining plant operating records as required in the Technical Specifications . In addition, he is responsible for maintaining inservice inspection records, special test records, Plant Operations Review Co==ittee Minutes, and General Office Review Board Plnutes.

The Manager-Generation Engineering is responsible for providing and imple-menting procedures for the preparation and maintenance of design records such as specifications , design reports, as-built drawings , etc.

The Manager-Operational Quality Assurance is responsible for pro' riding procedures which ensure the maintenance of records (other than design records and plant operating records) sufficient to furnish objective evidence of activities affecting quality in compliance of the applicable requirements of ANSI Nh5.2.9 (Draft-January 1973). He is also responsible for ensuring the Operational Quality Assurance Staff reviews, concurs with, and audits all Quality Assurance Records Procedures.

Due to the difference in the above requirements and previous record require-ments, the possibility exists that it vill be impossible to produce all records, in accordance with this plan, for events that occurred prior to the implementation of this plan. For this reason, it is planned to maintain the existing records and employ the guidelines of the Operating Quality Assurance Plan in the future.

1F 7 9t 7 Isu/ G9L 1A hL

. . .

Audit reports are transmitted via the Manager-Operational Quality Assurance to the responsible managers or outside organizations. It is the responsibility of the cognizant manager or the person in the outside organization specifically l designated as responsible, to review the audit report and to ensure that corree-tive action is accomplished in a timely manner. The audit team leader is responsible fbr timely followup action (including reaudits) as required to ensure corrective action has been taken. Audit findings are documented in the audit report and all corrective action, follovup action, and reaudits are documented with reference to the original audit report.

Regular audit teat me=bers (usually part of the Operational Quality Assurance staff) are tra4 .ed in accordance with the quality assurance training progra=.

Members of audit tea =s, who are not regular auditors, vill be indoctrinated or trained sufficiently to perform the specific audits for which they are as signed.

At least once every two years, the Vice President-Generation perfor=s an independent review of the Operational Quality Assurance Progra=, procedures, and activities. The purpose of this review is to evaluate the effectiveness of the progra= and to ensure proper co=pliance with Metropolitan Edison policy and the 10CFR50 Appendix B criteria.

In addition to the above-described audit program, the General Office Review Board conducts special reviews, audits, and investigations as requested by the Company President or as deemed necessary to confirm the adequate function-ing of the plant and corporate staff. These audits may be assigned to other qualified persons having no direct line of responsibility for day-to-day operations of the plant, including Metropolitan Edison Conpany Operational Quality Assurance personnel. To prevent unnecessary duplication, so=e General Office Review Board audits may also serve to satisfy audits scheduled by the Manager-Operational Quality Assurance. The results of General Office Review Board audits are reported to the Metropolitan Edison Co=pany President, 'Vice President-Generation, Manager-Operational Quality Assurance, Manager-Generating Stations, Station Superintendent, and others, as appropriate.

The following list of audits is representative of the areas to be audited by the Operational Quality Assurance Organization to assure compliance with the Operational Quality Assurance Pmgra=:

I. Generation Division Staff A. Generation Engineering Staff

1. Design Control (including fuel)
2. Procurement Control
3. Training
h. Document Control S. Nonconfor=ance/ Corrective Actien control
6. Modification Control

-

n 7

} b o,/ 69J 1A-h6

. ..

B. Generation ?&intenance Staff

1. Document Control ,
2. Training
3. Procurement Control
h. Ihintenance Control (includes Maintenance, ?bdification, and Repair) 5 Nonconformance/ Corrective Action Control
6. Special Process Control (Welding, Heat Treating, etc.)

C. Generation Operaticns Staff

1. Document Control
2. Training
3. Procurement Control
h. Nonconformance/ Corrective Action Control D. Operational Quality Assurance Staff
1. Audit Control
2. Document Control 3 Traini ng
h. Nonconformance/ Corrective .>ct< on Control 5 Vendor Surveillance and In ,. . xion II. Plant A. TMI Nuclear Station Unit 1 Staff
1. Procedure / Technical Specification Co=pliance with respect to:
a. Administrative Functions
b. Fuel Handling
c. Operations ,
d. Maintenance, Repair, Ibdification
e. Design
f. Health Physics / Chemistry
g. Environmental Ibnitorirg
h. Inservice Inspection
i. Surveillance Testing
2. Document Control
3. Nonconformance/ Corrective Action
h. Training 5 Procurement Control
6. Material Handling, Storing, Issuing, Cleaning, Preserving, Shipping Centrol
7. Calibration
8. Emergency Plan r7 *'1 jV/ 'I 1A-h7

. . . .

h. The Vice President-Generation of Metropolitan Edison Company receives a monthly report of the project QA organization activities.

5 The Vice President-Generation receives a copy of a semi-annual report on the activities of the GPUSC QA Department.

6. The Vice President-Generation participates in a management review of the effectiveness of the GPUSC QA programs at least once each calendar year.

7 The Vice President-Generaticn has line responsibility for the TNI station staff which officially accepts equipment and systems after successful startup and test. The official acceptance involves a review of all documentation related to the equipment or system which is being accepted to verify that the equipment or system is ready for operation and the documentation is complete.

Subsequent to commercial operation of TIE Unit No .1, the Vice President-Generation may utilize the services of GPUSC to support design, =odification, maintenance, repair, procurement , special processes , inspections , and tests . In such instances, the GPUSC personnel vill either be integrated into the Metropolitan Edison Company Organization and they will function in the same manner as employees of Metropolitan Edison Company, or Metropolitan Edison Company will establish and implement organizational, administrative, and reporting arrange =ents equivalent to those described previously for the pre-ec=mercial phase of the project. If the latter arrangement is utilized, the Vice President-Generation vill review and approve the Project Organization and Resrcasibilitiee Document and the Project QA Plan. He vill alsc ensure that appropriate audits are conducted of the GPUSC QA program.

Consistent with Section 13 of the Final Safety Analysis Report for TFE Unit No.1, maintenance and system modifications, identified during the conduct of initial testing as being necessary, may be accomplished in accordance with the provision of the GPUSC Start-up and Test Quality Assurance Plan.

n ee i b c- ,/ 243 1A-50