{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION    REGION I  2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 3, 2013  
{{#Wiki_filter:UNITED STATES ptember 3, 2013


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear
==SUBJECT:==
 
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
4300 Winfield Rd.
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)
 
Warrenville, IL 60555 SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Peach Bottom Atomic Power Station (Peach Bottom) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Peach Bottom Atomic Power Station (Peach Bottom) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto r Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators  
The NRC determined that overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green).


demonstrated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.
Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Line 37: Line 35:
Routine inspections performed by resident inspectors are not included in the inspection plan.
Routine inspections performed by resident inspectors are not included in the inspection plan.


In addition to baseline inspections, the NRC will perform IP 92702, "Follow-up on Corrective Actions for Violations and Deviations," IP71003, "Post-Approval Site Inspection for License Renewal," IP71004, "Power Uprate," and Temporary Instruction 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and  
In addition to baseline inspections, the NRC will perform IP 92702, Follow-up on Corrective Actions for Violations and Deviations, IP71003, Post-Approval Site Inspection for License Renewal, IP71004, Power Uprate, and Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
 
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).


Tanks." The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (610) 337-5209 with any questions you have regarding this letter.
Please contact me at (610) 337-5209 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects  
/RA/
 
Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56  


Enclosure: Inspection Plan
ML13240A170 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP  RI/DRP  RI/DRP NAME mmt SHansell/MG for SH SBarber/SB MGray/MG DATE 08 /25 /13  08 / 26 /13 09/03 /13


cc w/encl: Distribution via ListServ
Page 1 of 2      Peach Bottom 08/01/2013 15:08:45    Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 71124 - HP        1 2, 3 07/29/2013 08/02/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 07/29/2013 08/02/2013 IP 71124.04 Occupational Dose Assessment 2, 3 07/29/2013 08/02/2013 IP 71124.05 Radiation Monitoring Instrumentation 71124.07 - REMP        1 2, 3 09/02/2013 09/06/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111108G - U3 INSERVICE INSPECTION      1 3 09/16/2013 09/20/2013 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP        1 3 09/16/2013 09/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 09/16/2013 09/20/2013 IP 71124.02 Occupational ALARA Planning and Controls 71124.08 - RADWASTE        1 2, 3 10/21/2013 10/25/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - HP        1 2, 3 01/06/2014 01/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 01/06/2014 01/10/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 01/06/2014 01/10/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 01/06/2014 01/10/2014 IP 71124.04 Occupational Dose Assessment EP - EP ANNUAL REPORT      4 2, 3 01/01/2014 12/31/2014 IP 7111406 Drill Evaluation 71003 - U3 LR COMMITMENTS PHASE 2      2 3 01/21/2014 01/24/2014 IP 71003  Post-Approval Site Inspection for License Renewal TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2      1 2, 3 02/24/2014 02/28/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping CDBI - CDBI        7 2, 3 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/17/2014 03/21/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/31/2014 04/04/2014 IP 7111121 Component Design Bases Inspection EP EXER - EP EXERCISE INSPECTION      1 2, 3 04/07/2014 04/11/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - HP        1 2, 3 05/19/2014 05/23/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/19/2014 05/23/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.


ML13240A170 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt SHansell/MG for SH SBarber/SB MGray/MG DATE 08 /25 /13 08 / 26 /13 09/03 /13
This report shows only on-site and announced inspection procedures.


Page 1 of 2 08/01/2013 15:08:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2013-12/31/201471124-HP 1 2, 3 IP Occupational ALARA Planning and Controls71124.02 07/29/2013 08/02/2013 2, 3 IP Occupational Dose Assessment71124.04 07/29/2013 08/02/2013 2, 3 IP Radiation Monitoring Instrumentation71124.05 07/29/2013 08/02/201371124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 09/02/2013 09/06/20137111108G-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 09/16/2013 09/20/201371124-HP 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/16/2013 09/20/2013 3 IP Occupational ALARA Planning and Controls71124.02 09/16/2013 09/20/201371124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/21/2013 10/25/201371124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 01/06/2014 01/10/2014 2, 3 IP Occupational ALARA Planning and Controls71124.02 01/06/2014 01/10/2014 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 01/06/2014 01/10/2014 2, 3 IP Occupational Dose Assessment71124.04 01/06/2014 01/10/2014 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2014 12/31/2014 71003-U3 LR COMMITMENTS PHASE 2 2 3 IP Post-Approval Site Inspection for License Renewal 71003 01/21/2014 01/24/2014TI-182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/24/2014 02/28/2014 CDBI-CDBI 7 2, 3 IP Component Design Bases Inspection7111121 03/03/2014 03/07/2014 2, 3 IP Component Design Bases Inspection7111121 03/17/2014 03/21/2014 2, 3 IP Component Design Bases Inspection7111121 03/31/2014 04/04/2014EP EXER-EP EXERCISE INSPECTION 1 2, 3 IP Exercise Evaluation - Hostile Action (HA) Event7111407 04/07/201404/11/201471124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/19/2014 05/23/2014 2, 3 IP Occupational ALARA Planning and Controls71124.02 05/19/2014 05/23/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2     Peach Bottom 08/01/2013 15:08:45   Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site 71124 - HP     1 2, 3 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RETS    1 2, 3 09/08/2014 09/12/2014 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 09/08/2014 09/12/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - PB LSRO REQUAL INSP WITH P/F RESULTS  1 2, 3 12/08/2014 12/12/2014 IP 7111111B Licensed Operator Requalification Program 71124 - HP    1 2 10/27/2014 10/31/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10/27/2014 10/31/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - U2 INSERVICE INSPECTION    1 2 10/27/2014 10/31/2014 IP 7111108G Inservice Inspection Activities - BWR 71004 - EC/FAC POWER UPRATE    1 2 11/03/2014 11/07/2014 IP 71004  Power Uprate This report does not include INPO and OUTAGE activities.


Page 2 of 2 08/01/2013 15:08:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2013-12/31/201471124-HP 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 05/19/2014 05/23/201471124-RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 09/08/2014 09/12/2014 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/08/2014 09/12/20147111111B-PB LSRO REQUAL INSP WITH P/F RESULTS 1 2, 3 IP Licensed Operator Requalification Program7111111B 12/08/2014 12/12/201471124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/27/2014 10/31/2014 2 IP Occupational ALARA Planning and Controls71124.02 10/27/2014 10/31/20147111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 10/27/2014 10/31/2014 71004-EC/FAC POWER UPRATE 1 2 IP Power Uprate 7100411/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 14:11, 4 November 2019

ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006
ML13240A170
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/03/2013
From: Mel Gray
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
gray, mel
References
IR-13-006
Download: ML13240A170 (5)


Text

UNITED STATES ptember 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2013006 AND 05000278/2013006)

Dear Mr. Pacilio:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Peach Bottom Atomic Power Station (Peach Bottom) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform IP 92702, Follow-up on Corrective Actions for Violations and Deviations, IP71003, Post-Approval Site Inspection for License Renewal, IP71004, Power Uprate, and Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5209 with any questions you have regarding this letter.

Sincerely,

/RA/

Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-277, 50-278 License Nos.: DPR-44, DPR-56 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13240A170 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt SHansell/MG for SH SBarber/SB MGray/MG DATE 08 /25 /13 08 / 26 /13 09/03 /13

Page 1 of 2 Peach Bottom 08/01/2013 15:08:45 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 2, 3 07/29/2013 08/02/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 07/29/2013 08/02/2013 IP 71124.04 Occupational Dose Assessment 2, 3 07/29/2013 08/02/2013 IP 71124.05 Radiation Monitoring Instrumentation 71124.07 - REMP 1 2, 3 09/02/2013 09/06/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111108G - U3 INSERVICE INSPECTION 1 3 09/16/2013 09/20/2013 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP 1 3 09/16/2013 09/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 09/16/2013 09/20/2013 IP 71124.02 Occupational ALARA Planning and Controls 71124.08 - RADWASTE 1 2, 3 10/21/2013 10/25/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - HP 1 2, 3 01/06/2014 01/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 01/06/2014 01/10/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 01/06/2014 01/10/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 01/06/2014 01/10/2014 IP 71124.04 Occupational Dose Assessment EP - EP ANNUAL REPORT 4 2, 3 01/01/2014 12/31/2014 IP 7111406 Drill Evaluation 71003 - U3 LR COMMITMENTS PHASE 2 2 3 01/21/2014 01/24/2014 IP 71003 Post-Approval Site Inspection for License Renewal TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 02/24/2014 02/28/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping CDBI - CDBI 7 2, 3 03/03/2014 03/07/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/17/2014 03/21/2014 IP 7111121 Component Design Bases Inspection 2, 3 03/31/2014 04/04/2014 IP 7111121 Component Design Bases Inspection EP EXER - EP EXERCISE INSPECTION 1 2, 3 04/07/2014 04/11/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - HP 1 2, 3 05/19/2014 05/23/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/19/2014 05/23/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Peach Bottom 08/01/2013 15:08:45 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 2, 3 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RETS 1 2, 3 09/08/2014 09/12/2014 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 09/08/2014 09/12/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - PB LSRO REQUAL INSP WITH P/F RESULTS 1 2, 3 12/08/2014 12/12/2014 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2 10/27/2014 10/31/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10/27/2014 10/31/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - U2 INSERVICE INSPECTION 1 2 10/27/2014 10/31/2014 IP 7111108G Inservice Inspection Activities - BWR 71004 - EC/FAC POWER UPRATE 1 2 11/03/2014 11/07/2014 IP 71004 Power Uprate This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.