Mid-Cycle Performance Review and Inspection Plan 2011 - Peach Bottom Atomic Power Station
ML112411345
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/01/2011
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Nuclear
KROHN PG
References
IR-11-006
Download: ML112411345 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 1, 20II Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, lL 60555

SUBJECT:

MID-CYCLE LETTER FOR PEACH BOTTOM ATOMIC POWER STATION (05000277 1201 1006 and 0500027 81201 1 006)

Dear Mr. Pacilio:

On August 9, 2011, the NRC completed its mid-cycle performance review of the Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from July 1,2010, through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Peach Bottom Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31,2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspection program, we plan to conduct Inspection Procedure (lP) 71003, "Post-Approval Site Inspection For License Renewal." From July 1, 2010, to June 30, 2011, the NRC issued one severity level lV (SLIV) traditional enforcement non-cited violation associated with a former contract employee failing to provide information about a positive fitness-for-duty test (ML102590516 and ML103140643)1. The NRC followed-up on this non-cited violation during the Biennial Problem ldentification and Resolution Team lnspection completed on August 12, 2011. The results of this inspection will be documented in NRC Inspection Report 05000277 &

I Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.

M. Pacilio 28812011010. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

ln the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness lnspection of Severe Accident Management Guidelines (SAMGS)," at your facility. Results of these inspections can be found here:

http://www.nrc.qovliapan/iapan-activities.html. Additionally, on May 11,2011, the agency issued NRC Butletin 2011-01, "Mitigating Strategies," to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://Www.nrc.qovlreading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5120 with any questions you have regarding this letter.

Sincerely, 2

t'^Jx M Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure:

Inspection Plan cc Wencl: Distribution via ListServ

M. Pacilio 288t2011010. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)," at your facility. Results of these inspections can be found here:

http://www.nrc.qov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the agency issued NRC Bulletin2}ll-01, "Mitigating Strategies," to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its' recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5120 with any questions you have regarding this letter.

Sincerely,

/RA/

Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure:

Inspection Plan cc dencl: Distribution via ListServ Distribution: see attached page SUNSI REVTEW COMPLETE: AAR (Reviewer's Initials)

DOCUMENT NAME: SIROP.12 MID.CYCLE REVIEMBRANCH 4\\PB\\PEACH BOTTOM MID'CYCLE ASSESSMENT LETTER.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in box:"C" = Copy w/o attachmenUenclosure, E' = Copy w/ attachment/enclosure,"N"=No copy

)FFICE mmt TYDRP

?I/DRP t/DRP

,IAME iLHansell/AAR for

  • AARosebrooUMR*

rGKrohn/PGK

)ATE tgt15t't1

)8115111

)81 18111

  • See Previous Concurrence OFFICIAL RECORD COPY ML112411345

M. Pacilio Distribution w/encl: (via E-mail)

W, Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAlL Resource)

D. Roberts, DRP (RIDRPMAlL Resource)

J. Clifford, DRP (RIDRPMAIL Resource)

C. Miller, DRS (RlDRSMail Resource)

P. Wilson, DRS (RlDRSMail Resource)

P. Krohn, DRP A. Rosebrook. DRP R. Montgomery, DRP S. lbarrola, DRP S. Hansell, DRP, SRI A. Ziedonis, DRP, Rl S. Schmitt, DRP, OA J. McHale, Rl OEDO DRS Branch Chiefs (6)

N. McNamara, Rl, SLO D. Tifft, RI, SLO D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA RidsNrrPMPeachBottom Resource Rids N rrDorlLpll -2 Resou rce ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource

Page 1 of 3 08117120'l'l 11:49:11 Report 22 Peach Bottom Inspection / Activity Plan 07t0112011 - 1213112012 No. of Staff on Site Unit Number 2,3 2,3 2.3 0110112011 0712512011 08/08/201 1 o8tou2011 08/08/201 1 08t0812011 08/08/201 1 0810812011 08/08/201 1 0810812011 08/08/201 1 0812212011 0812212011 0812212011 0812212011 0812212011 ogt19t2011 o911912011 0911912011 0911912011 0911912011 09t1912011 1111412011 1111412011 11t1412011 1111412011 11t14t2A11 12t3112011 07t2912011 08t1212011 0811212011 o811212011 08/1212011 08t1212011 08t1212011 08t1212011 08t12/2011 08t1212011 08t2612011 08t2612011 0812612011 08t261201'l 0812612011 0912312011 09t23t2011 09t23t2011 0912312011 o9t23t2011 o9t23t2011 11/18t2011 1111812011 11t18t2011 11t18t2011 11118120'11 EP

-EPANNUALREPORT lP 7'l 11406 Drill Evaluation 711528 - Pl&R lP 711528 Problem ldentification and Resolution lP 71152A Problem ldentification and Resolution MC 2561

. SAFSTOR INSPECTION lP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors lP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors lp 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors lp 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors lp 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors lP 83750 Occupational Radiation Exposure lp B47SO Radioactive Waste Treatment, And Effluent And Environmental Monitoring lp 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials HP-71124. HP.ALARA/AIR/DOSE/INSTRUMENTS/ACCESS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation lP 71124.04 Occupational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation HP.71124. ACCESS/ALARA/AIR/DOSE/INSTRUMENTS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Orcupational ALARA Planning and Controls lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation lP 71124.04 Orcupational Dose Assessment lP 71124.05 Radiation Monitoring lnstrumentation 7111108G - U3INSERVICE INSPECTION lP 71 11108G Inservice Inspection Activities - BWR HP-71124.ACCESS/ALARA/DOSE/PI lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.04 Occupational DoseAssessment lP 71 151-OR01 Occupational Exposure Control Effectiveness lP 71151-PR01 RETS/ODCM Radiological Effluent I

1 1

1 1

I 1

z,J z,t 2,3 2,3 2,3 z,J z,J 2,3 2,3 z,J 2,3 2,3 2,3 J

2 fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 0811712011 11;49:11 Report 22 Peach Bottom Inspection / Activity Plan 07t01t2011 - 1213112012 No. of Staff on Site Unit Number 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2.3 z,J 2,3 2,3 z,J 2,3 z,J 2,3 z,J 2,3 2,3 0312612012 0312612012 04t09t2012 04t09t2012 04t09t2012 04t09t2012 0413012012 ost14t2012 06t0412012 06t04t2012 o6to4t2012 06t04t2012 0710912012 07t09t2012 07t09t2012 07t09t2012 07t09t2012 07109t2012 07t30t2012 07t30t2012 0713012012 07t30t2012 07t30t2012 0713012012 07t30t2012 0713012012 09t17t2012 03t3012012 03t3012012 04t1312012 04t1312012 o4t13t2012 04t1312012 0510412012 0511812012 06t0812012 06t0812012 06t08/2012 06t0812012 07t1312012 07t1312012 07t1312012 0711312012 07t1312012 0711312012 0811712012 o8t't712012 0811712012 o8t17t2012 o8t1712012 0811712012 0811712012 08t1712012 09t21120'12 EP EX

. EP EXERCISE EVALUATION lP 7111401 Exercise Evaluation lP 7111404 Emergency Action Level and Emergency Plan Changes HP.71124. ALARA/AIR/DOSE/ACCESS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation lP 71124.04 Occupational Dose Assessment TRI FI

. TRIENNIAL FIRE PROTEGTION INSPECTION lp 2S1S117S Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review lP 7111105T Fire Protection [friennial]

HP-71124. ACCESS/ALARA'DOSE/INSTRUMENTS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALAM Planning and Controls lP 71124.04 Occr:pational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation HP-71124 - ALARA/AIR/DOSE/INSTRUMENTS/ACCESS lp 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants lP 71124.01 Radiotogical Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation lP 71124.04 Occupational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation 2561

- SAFSTOR INSPECTION lp 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors lp 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors lP 4080i Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors lp 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors lp 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors lP 83750 Occupational Radiation Exposure lp 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring lp 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials 71003

. LR COMMITMENTS INSP - OUTAGE lP 71003 Post-Approval Site Inspection for License Renewal 1

1 1

1 1

I 1

1 fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Ogl17l2011 11:49:11 Report 22 Peach Bottom Inspection / Activity Plan 07101t2011 - 12t3112012 No. of Staff on Site Unit Number 2

2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2.3 2,3 2,3 2,3 2,3 2,3 09t17t2012 09t24t2012 09t2412012 09t2412012 09t24t2012 0912412012 1011512012 10t1512012 10t15t2012 10t15t2012 10t15t2012 12t0312012

't2t03t2012 12tO3t2012 12t03t2012

't2t03t2g',t2 12t03t2012 o9t21t2012 0912812012 0912812012 09t2812012 09t28t2012 09t2812012 1011912012 1011912012 10hs12012 1011912012 1011912012 12t07t2012 12t07t2012 12t0712012 12t07t2012 12t0712012 12t07t2012 7111108G. U2INSERVICE INSPECTION lP 71 11108G InseMce lnspection Activities - BWR HP-71124. ALARA/AIR/DOSE/INSTRUMENTS/ACCESS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation lP 71124.04 Occupational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation HP.7 1 124. ALARA/AIR/DOSE/INSTRUMENTS/ACCESS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation lP 71124.04 Occupational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation HP-71124. ALARA/AIR/DOSE/INSTRUMENTS/ACCESS lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71'124.02 Occupational ALARA Planning and Controls lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation lP 71124-04 Occupational Dose Assessment lP 71124.05 Radiation Monitoring Instrumentation lP 71151-PR01 RETS/ODCM Radiolooical Effluent fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.