MONTHYEARIR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) ML23019A0752023-01-19019 January 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011 IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210052021-09-0101 September 2021 Updated Inspection Plan for the Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2021005 and 05000278/2021005) IR 05000277/20200062021-03-0303 March 2021 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2020006 and 05000278/2020006) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information IR 05000277/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000277/2020005 and 05000278/2020005) ML20119A8852020-04-28028 April 2020 Stations, Unit 3, Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20190062020-03-0303 March 2020 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006) IR 05000277/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000277/2019005 and 05000278/2019005) ML19119A1202019-04-29029 April 2019 Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20180062019-03-0404 March 2019 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2018006 and 05000278/2018006) ML18330A0532018-11-21021 November 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000277/2019403 and 05000278/2019403 IR 05000277/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000277/2018005 and 05000278/2018005) IR 05000277/20170062018-02-28028 February 2018 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501) ML17340A4112017-12-0505 December 2017 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000277/20170052017-08-28028 August 2017 Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22 IR 05000277/20160062017-03-0101 March 2017 Annual Assessment Letter Units 2 and 3 - Report Nos. 05000277/2016006 and 05000278/2016006 with Report 22 IR 05000277/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) IR 05000277/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2015005 and 05000278/2015005) IR 05000277/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001) IR 05000277/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2014006 and 05000278/2014006 IR 05000277/20130012014-03-0404 March 2014 ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan IR 05000277/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006 IR 05000277/20120012013-03-0404 March 2013 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 (Report 05000277/2012001 and 05000278/2012001) ML12318A0022012-11-0909 November 2012 Notification to Perform an Inspection of Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1 - 7 and Request for Information IR 05000277/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Peach Bottom Atomic Power Station (Report 05000277/2012006 and 05000278/2012006) IR 05000277/20110012012-03-0505 March 2012 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277-11-001 and 05000278-11-001) ML1124113452011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Peach Bottom Atomic Power Station IR 05000277/20100012011-03-0404 March 2011 Annual Assessment Letter for Peach Bottom Atomic Power Station, EOC-11 (05000277/2010001 and 05000278/2010001) ML1024404132010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Peach Bottom Atomic Power Station, Units 2 and 3 ML1006210092010-03-0303 March 2010 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277-10-001 and 05000278-10-001) and Report 22 ML0924402532009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Peach Bottom Atomic Power Station IR 05000277/20090012009-03-0404 March 2009 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277/2009001 and 05000278/2009001) ML0824704542008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Peach Bottom ML0734705752007-12-13013 December 2007 ROP - Peach Bottom - Change to Inspection Plan, 12/13/07 ML0724306242007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 ML0706106152007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Peach Bottom Station (05-277-07-001 and 05-278-07-001) ML0624305232006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station IR 05000277/20060012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 05000277/2006001 and 05000278/2006001) ML0524207012005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station ML0506107082005-03-0202 March 2005 Annual Assessment Letter 2005001-Peach Bottom ML0424404642004-08-30030 August 2004 2004 Peach Bottom Mid-Cycle Performance Review and Inspection Plan ML0406305452004-03-0303 March 2004 2003-04 Annual Assessment Letter - Peach Bottom IR 05000277/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 50-277/03-001, 50-278/03-001) IR 05000277/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 50-277/02-01, 50-278/02-01 2023-08-31
[Table view] Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
August 31, 2020
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - UPDATED INSPECTION PLAN (INSPECTION REPORTS 05000277/2020005 AND 05000278/2020005)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP),
including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. Consequently, the NRC plans to conduct an inspection per Inspection Procedure 92707, Security Inspection of Facilities Impacted by Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited, at your facility during the period. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE.
The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
NRC Region I plans to conduct an inspection per Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, at your facility during the period.
Additionally, during this period the NRC will schedule an additional inspection per a revised version Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01,) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5337 with any questions you have regarding this letter.
Sincerely, X /RA/
Signed by: Jonathan E. Greives Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56 Enclosure:
Inspection Plan cc: Distribution via ListServ
ML20240A275 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCasey JGreives DATE 08/27/2020 08/31/2020
IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Design Basis Assurance Inspection - Teams - Peach Bottom Units 2 and 3 6 2, 3 07/13/2020 07/19/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
2, 3 07/27/2020 08/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
TI-193 Hardened Containment Vent 2 2, 3 08/17/2020 08/21/2020 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions Resp Protection & Dose Assessment (71124.03/71124.04) 1 2, 3 08/24/2020 08/28/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 08/24/2020 08/28/2020 IP 71124.04 000728 Occupational Dose Assessment LIMITED SCOPE TACTICAL RESPONSE DRILLS - PB 6 2, 3 08/31/2020 09/04/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited REMP (71124.07) 1 2, 3 09/21/2020 09/25/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program ISI - UNIT 2 1 2 10/26/2020 10/30/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Rad Hazards (71124.01) & PIs (71151) 1 2, 3 10/26/2020 10/30/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/26/2020 10/30/2020 IP 71151 000746 Performance Indicator Verification ISFSI- Security Inspection-PB 2 2, 3 11/16/2020 11/20/2020 IP 71130.09 001656 Security Plan Changes 2, 3 11/16/2020 11/20/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations EP EXERCISE INSPECTION - PEACH BOTTOM 5 2, 3 12/07/2020 12/11/2020 IP 71114.01 000716 Exercise Evaluation 2, 3 12/07/2020 12/11/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 12/07/2020 12/11/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.
8/26/2020 6:45:07 AM
IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count EP Program Inspection - Peach Bottom 1 2, 3 02/08/2021 02/12/2021 IP 71114.02 000717 Alert and Notification System Testing 2, 3 02/08/2021 02/12/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 02/08/2021 02/12/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 02/08/2021 02/12/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 2, 3 02/08/2021 02/12/2021 IP 71151 001397 Performance Indicator Verification PB Requal Inspection with P/F Results 2 2 03/08/2021 03/12/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2 03/08/2021 03/12/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Access Control, Equipment Testing and Maintenance, Training, SPR 3 2, 3 04/05/2021 04/09/2021 IP 71130.02 000734 Access Control 2, 3 04/05/2021 04/09/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 04/05/2021 04/09/2021 IP 71130.07 000739 Security Training 2, 3 04/05/2021 04/09/2021 IP 71130.09 001656 Security Plan Changes 2, 3 04/05/2021 04/09/2021 IP 71151 001338 Performance Indicator Verification RETS (71124.06) 1 2, 3 04/12/2021 04/16/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment FY2021 Peach Bottom Initial Examination 4 2, 3 05/02/2021 05/07/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2, 3 05/30/2021 06/11/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
ALARA (71124.02) 1 2, 3 05/17/2021 05/21/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Fire Protection - Peach Bottom 3 2, 3 06/07/2021 06/11/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)
2, 3 06/21/2021 06/25/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)
Radwaste (71124.08) 1 2, 3 07/26/2021 07/30/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
8/26/2020 6:45:07 AM
IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count PI&R BIENNIAL - PB 4 2, 3 07/26/2021 07/30/2021 IP 71152B 000747 Problem Identification and Resolution 2, 3 08/09/2021 08/13/2021 IP 71152B 000747 Problem Identification and Resolution HP Instrumentation (71124.05) 1 2, 3 09/13/2021 09/17/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 3 1 3 10/31/2021 11/06/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Rad Hazards (71124.01) and PIs (71151) 1 2, 3 11/01/2021 11/05/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 11/01/2021 11/05/2021 IP 71151 000746 Performance Indicator Verification Design Basis Assurance Inspection - Power Operated Valves - Peach Bottom Units 1 and 2 3 2, 3 03/21/2022 04/08/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Resp Protection & Dose Assessment (71124.03/71124.04) 1 2, 3 04/18/2022 04/22/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 04/18/2022 04/22/2022 IP 71124.04 000728 Occupational Dose Assessment FY22 Peach Bottom Initial License Examination 4 2, 3 04/24/2022 04/29/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2, 3 05/15/2022 05/27/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
EP EXERCISE INSPECTION - PEACH BOTTOM 4 2, 3 04/25/2022 04/29/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 04/25/2022 04/29/2022 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2, 3 04/25/2022 04/29/2022 IP 71151 001397 Performance Indicator Verification Access Control, Protective Strat, TSR, SPR, PI-PB 4 2, 3 05/16/2022 05/20/2022 IP 71130.02 000734 Access Control 2, 3 05/16/2022 05/20/2022 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 05/16/2022 05/20/2022 IP 71130.09 001656 Security Plan Changes 2, 3 05/16/2022 05/20/2022 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 05/16/2022 05/20/2022 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
8/26/2020 6:45:07 AM
IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count 59.59 Inspection - Peach Bottom Units 1 and 2 3 2, 3 06/13/2022 06/17/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.