August 31, 2020

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - UPDATED INSPECTION PLAN (INSPECTION REPORTS 05000277/2020005 AND 05000278/2020005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP),

including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. Consequently, the NRC plans to conduct an inspection per Inspection Procedure 92707, Security Inspection of Facilities Impacted by Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited, at your facility during the period. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE.

The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

NRC Region I plans to conduct an inspection per Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, at your facility during the period.

Additionally, during this period the NRC will schedule an additional inspection per a revised version Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01,) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5337 with any questions you have regarding this letter.

Sincerely, X /RA/

Signed by: Jonathan E. Greives Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56 Enclosure:

Inspection Plan cc: Distribution via ListServ

ML20240A275 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCasey JGreives DATE 08/27/2020 08/31/2020

IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Design Basis Assurance Inspection - Teams - Peach Bottom Units 2 and 3 6 2, 3 07/13/2020 07/19/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2, 3 07/27/2020 08/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

TI-193 Hardened Containment Vent 2 2, 3 08/17/2020 08/21/2020 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions Resp Protection & Dose Assessment (71124.03/71124.04) 1 2, 3 08/24/2020 08/28/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 08/24/2020 08/28/2020 IP 71124.04 000728 Occupational Dose Assessment LIMITED SCOPE TACTICAL RESPONSE DRILLS - PB 6 2, 3 08/31/2020 09/04/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited REMP (71124.07) 1 2, 3 09/21/2020 09/25/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program ISI - UNIT 2 1 2 10/26/2020 10/30/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Rad Hazards (71124.01) & PIs (71151) 1 2, 3 10/26/2020 10/30/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/26/2020 10/30/2020 IP 71151 000746 Performance Indicator Verification ISFSI- Security Inspection-PB 2 2, 3 11/16/2020 11/20/2020 IP 71130.09 001656 Security Plan Changes 2, 3 11/16/2020 11/20/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations EP EXERCISE INSPECTION - PEACH BOTTOM 5 2, 3 12/07/2020 12/11/2020 IP 71114.01 000716 Exercise Evaluation 2, 3 12/07/2020 12/11/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 12/07/2020 12/11/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

8/26/2020 6:45:07 AM

IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count EP Program Inspection - Peach Bottom 1 2, 3 02/08/2021 02/12/2021 IP 71114.02 000717 Alert and Notification System Testing 2, 3 02/08/2021 02/12/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 02/08/2021 02/12/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 02/08/2021 02/12/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 2, 3 02/08/2021 02/12/2021 IP 71151 001397 Performance Indicator Verification PB Requal Inspection with P/F Results 2 2 03/08/2021 03/12/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2 03/08/2021 03/12/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Access Control, Equipment Testing and Maintenance, Training, SPR 3 2, 3 04/05/2021 04/09/2021 IP 71130.02 000734 Access Control 2, 3 04/05/2021 04/09/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 04/05/2021 04/09/2021 IP 71130.07 000739 Security Training 2, 3 04/05/2021 04/09/2021 IP 71130.09 001656 Security Plan Changes 2, 3 04/05/2021 04/09/2021 IP 71151 001338 Performance Indicator Verification RETS (71124.06) 1 2, 3 04/12/2021 04/16/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment FY2021 Peach Bottom Initial Examination 4 2, 3 05/02/2021 05/07/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 05/30/2021 06/11/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

ALARA (71124.02) 1 2, 3 05/17/2021 05/21/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Fire Protection - Peach Bottom 3 2, 3 06/07/2021 06/11/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)

2, 3 06/21/2021 06/25/2021 IP 71111.21N.05 001646 DO NOT USE: Fire Protection Team Inspection (FPTI)

Radwaste (71124.08) 1 2, 3 07/26/2021 07/30/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

8/26/2020 6:45:07 AM

IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count PI&R BIENNIAL - PB 4 2, 3 07/26/2021 07/30/2021 IP 71152B 000747 Problem Identification and Resolution 2, 3 08/09/2021 08/13/2021 IP 71152B 000747 Problem Identification and Resolution HP Instrumentation (71124.05) 1 2, 3 09/13/2021 09/17/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 3 1 3 10/31/2021 11/06/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Rad Hazards (71124.01) and PIs (71151) 1 2, 3 11/01/2021 11/05/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 11/01/2021 11/05/2021 IP 71151 000746 Performance Indicator Verification Design Basis Assurance Inspection - Power Operated Valves - Peach Bottom Units 1 and 2 3 2, 3 03/21/2022 04/08/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Resp Protection & Dose Assessment (71124.03/71124.04) 1 2, 3 04/18/2022 04/22/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 04/18/2022 04/22/2022 IP 71124.04 000728 Occupational Dose Assessment FY22 Peach Bottom Initial License Examination 4 2, 3 04/24/2022 04/29/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 05/15/2022 05/27/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP EXERCISE INSPECTION - PEACH BOTTOM 4 2, 3 04/25/2022 04/29/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 04/25/2022 04/29/2022 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2, 3 04/25/2022 04/29/2022 IP 71151 001397 Performance Indicator Verification Access Control, Protective Strat, TSR, SPR, PI-PB 4 2, 3 05/16/2022 05/20/2022 IP 71130.02 000734 Access Control 2, 3 05/16/2022 05/20/2022 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 05/16/2022 05/20/2022 IP 71130.09 001656 Security Plan Changes 2, 3 05/16/2022 05/20/2022 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 05/16/2022 05/20/2022 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

8/26/2020 6:45:07 AM

IP 22 Inspection Activity Plan Report Peach Bottom 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count 59.59 Inspection - Peach Bottom Units 1 and 2 3 2, 3 06/13/2022 06/17/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.