UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PEACH BOTTOM ATOMIC POWER STATION
Dear Mr. Crane:
On August 15, 2007, the NRC staff completed its performance review of Peach Bottom Atomic Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter of 2007 at Peach Bottom Units 2 and 3 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significant (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an Independent Spent Fuel Storage Installation at Operating Plants inspection during May 2008.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the changes as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56
Enclosure:
Peach Bottom Inspection/ Activity Plan cc w/encl:
Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)
R. McLean, Power Plant and Environmental Review Division (MD)
G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO)
Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel Institute of Nuclear Power Operations (INPO)
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the changes as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/ra/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56
Enclosure:
Peach Bottom Inspection/ Activity Plan Distribution w/encl:
(via E-mail)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown, DRP - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA R. Laufer, RI OEDO R. Guzman, NRR H. Chernoff, NRR J. Hughey, PM, NRR D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov JWT1@nrc.gov Region I Docket Room (with concurrences)
SUNSI Review Complete: PGK (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 4 Mid-cycle letters\\PB 2007 Mid-Cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME TSetzer/TS PKrohn/PGK DATE 08/ 28/07 08/28/07 OFFICIAL RECORD COPY
Peach Bottom Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 17:03:43 Report 22 1
36801
- ORGANIZATION AND MANAGEMENT Other Routine 07/03/2007 07/05/2007 1
36801 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1
40801
- SELF ASSESSMENTS & CAP Other Routine 07/03/2007 07/05/2007 1
40801 IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1
84750
- RADWSTE TRTMT & EFF & ENV Other Routine 07/03/2007 07/05/2007 1
84750 IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1
86750
- RADWSTE MNGT & TRANS RAM Other Routine 07/03/2007 07/05/2007 1
86750 IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 1
83750
- OCCUPATIONAL RADIATION EXPOSURE Other Routine 07/03/2007 09/30/2007 1
83750 IP Occupational Radiation Exposure 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/30/2007 08/03/2007 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2
7111111B
- LSRO REQUAL PROG. OPTEST @PB +PF REVIEW Baseline Inspections 11/01/2007 11/01/2007 2, 3 7111111B IP Licensed Operator Requalification Program 3
01/07EXM
- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007 2
U01631 PEACH BOTTOM LSRO EXAM (FY08)
Not Applicable 01/07/2008 01/08/2008 2
U01631 PEACH BOTTOM LSRO EXAM (FY08) 1 71121
- OCC RAD SAFETY Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111108G
- U3 IN-SERVICE INSPECTION Baseline Inspections 10/01/2007 10/05/2007 3
7111108G IP Inservice Inspection Activities - BWR 1
71121
- OCC RAD SAFETY Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
71121
- OCC RAD SAFETY Baseline Inspections 12/10/2007 12/14/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/10/2007 12/14/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 12/10/2007 12/14/2007 2, 3 71151 IP Performance Indicator Verification 1
DECOM
- PEACH BOTTOM UNIT 1-JULY 2008 DECOM Other Routine 01/01/2008 01/05/2008 1
36801 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors Other Routine 01/01/2008 01/05/2008 1
40801 IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors Other Routine 01/01/2008 01/05/2008 1
83750 IP Occupational Radiation Exposure This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Peach Bottom Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 17:03:43 Report 22 1
DECOM
- PEACH BOTTOM UNIT 1-JULY 2008 DECOM Other Routine 01/01/2008 01/05/2008 1
84750 IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring Other Routine 01/01/2008 01/05/2008 1
86750 IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 1
71121
- OCC RAD SAFETY Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 8
7111121
- CDBI Baseline Inspections 03/10/2008 03/14/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/24/2008 03/28/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/31/2008 04/04/2008 2, 3 7111121 IP Component Design Bases Inspection 4
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections 06/02/2008 06/05/2008 2, 3 7111111B IP Licensed Operator Requalification Program 4
- EP EXERCISE EVALUATION Baseline Inspections 04/21/2008 04/25/2008 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 04/21/2008 04/25/2008 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP03 IP Alert & Notification System 1
- MAY 2008 UNIT 2&3 ISFSI LOADING CAMPAIGN Other Routine 05/01/2008 05/31/2008 2, 3 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/12/2008 05/16/2008 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4
12/08EXM
- U2&3 INITIAL OPERATOR LICENSING EXAM Not Applicable 11/10/2008 11/14/2008 2
U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM Not Applicable 12/08/2008 12/19/2008 2
U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM 1
7111107B
- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 2, 3 7111107B IP Heat Sink Performance 1
7111108G
- U2 INSERVICE INSPECTION Baseline Inspections 09/29/2008 10/03/2008 2
7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.