December 13, 2007 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Rd Warrenville, IL 60555
SUBJECT:
CHANGE TO THE INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
Dear Mr. Pardee:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to the normal, ROP baseline inspection procedures in the security, emergency preparedness, and health physics areas.
Given the recent security officer inattentive events at Peach Bottom, however, the NRC has taken two noteworthy actions to increase security oversight at the station that are in addition to those resources and inspections already scheduled as part of the ROP. First, the Executive Director for Operations approved a memorandum to increase NRC oversight of security activities at Peach Bottom on November 28, 2007 (ML073320344). Second, the NRC issued a Confirmatory Action Letter (ML072920283) on October 19, 2007, to confirm Exelons agreement to take certain actions to ensure continued security plan effectiveness.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
C. Pardee 2
Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects, Region I Docket Nos.
50-277; 50-278 License Nos.: DPR-44, DPR-56 cc w/encl:
C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom Atomic Power Station M. Massaro, Plant Manager, Peach Bottom Atomic Power Station J. Armstrong, Regulatory Assurance Manager - Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President - Nuclear Oversight Director, Licensing and Regulatory Affairs J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)
S. Pattison, Maryland Department of Environment A. Lauland, Maryland Department of Environment T. Snyder, Maryland Department of Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council R. Ayers, Harford County Emergency Management E. Crist, Harford County Emergency Management L. Ploener, Harford County Emergency Management Chief R. K. Brooks, Cecil County Emergency Management Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists
C. Pardee 2
Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos.
50-277; 50-278 License Nos.: DPR-44, DPR-56 Distribution w/encl:
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP G. West, RI OEDO H. Chernoff, NRR P. Bamford, PM, NRR J. Hughey, NRR J. Lubinski, NRR P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP F. Bower, DRP - SRI M. Brown, DRP, RI S. Schmitt, Resident OA Region I Docket Room (with concurrences)
RidsNrrDirslpab@nrc.gov J. Thompson, NRR (JWT1@nrc.gov)
J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA SUNSI Review Complete: PGK (Reviewer====s Initials)
DOCUMENT NAME: T:\\DRP\\BRANCH4\\ROP 8 LETTERS\\PBAPS ROP REALIGNMENT INSPECTION PLAN.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME RFuhrmeister/
PKrohn/
DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY
Peach Bottom Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/13/2007 10:49:43 Report 22 6
7111121
- CDBI Baseline Inspections 03/17/2008 03/21/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/31/2008 04/04/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 04/07/2008 04/11/2008 2, 3 7111121 IP Component Design Bases Inspection 4
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections 06/02/2008 06/05/2008 2, 3 7111111B IP Licensed Operator Requalification Program 4
- EP EXERCISE EVALUATION EP Baseline Inspectio 04/21/2008 04/25/2008 2, 3 7111401 IP Exercise Evaluation EP Baseline Inspectio 04/21/2008 04/25/2008 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/21/2008 04/25/2008 2, 3 71151-EP03 IP Alert & Notification System 1
- MAY 2008 UNIT 2&3 ISFSI LOADING CAMPAIGN Other Routine 05/01/2008 05/31/2008 2, 3 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/12/2008 05/16/2008 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
DECOM
- PEACH BOTTOM UNIT 1-JULY 2008 DECOM Other Routine 06/30/2008 07/04/2008 1
36801 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors Other Routine 06/30/2008 07/04/2008 1
40801 IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors Other Routine 06/30/2008 07/04/2008 1
83750 IP Occupational Radiation Exposure Other Routine 06/30/2008 07/04/2008 1
84750 IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring Other Routine 06/30/2008 07/04/2008 1
86750 IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 1
71122
- RADWASTE Baseline Inspections 07/28/2008 08/01/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/28/2008 08/01/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/28/2008 08/01/2008 2, 3 7112202 IP Radioactive Material Processing and Transportation 4
12/08EXM
- U2&3 INITIAL OPERATOR LICENSING EXAM Not Applicable 11/10/2008 11/14/2008 2
U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM Not Applicable 12/08/2008 12/19/2008 2
U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM 1
71121
- OCC RAD SAFETY Baseline Inspections 08/18/2008 08/22/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/18/2008 08/22/2008 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 08/18/2008 08/22/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
71121
- OCC RAD SAFETY Baseline Inspections 09/22/2008 09/26/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Peach Bottom Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/13/2007 10:49:43 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 09/22/2008 09/26/2008 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 09/22/2008 09/26/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111108G
- U2 INSERVICE INSPECTION Baseline Inspections 09/29/2008 10/03/2008 2
7111108G IP Inservice Inspection Activities - BWR 1
71121
- OCC RAD SAFETY Baseline Inspections 11/10/2008 11/14/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/10/2008 11/14/2008 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 11/10/2008 11/14/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/10/2008 11/14/2008 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 11/10/2008 11/14/2008 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.