Issue date: 12/13/2007
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pardee C
Exelon Generation Co
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML073470575 (5)


Text

December 13, 2007 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Rd Warrenville, IL 60555

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

Dear Mr. Pardee:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to the normal, ROP baseline inspection procedures in the security, emergency preparedness, and health physics areas.

Given the recent security officer inattentive events at Peach Bottom, however, the NRC has taken two noteworthy actions to increase security oversight at the station that are in addition to those resources and inspections already scheduled as part of the ROP. First, the Executive Director for Operations approved a memorandum to increase NRC oversight of security activities at Peach Bottom on November 28, 2007 (ML073320344). Second, the NRC issued a Confirmatory Action Letter (ML072920283) on October 19, 2007, to confirm Exelons agreement to take certain actions to ensure continued security plan effectiveness.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

C. Pardee 2 Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects, Region I Docket Nos. 50-277; 50-278 License Nos.: DPR-44, DPR-56 cc w/encl:

C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation J. Grimes, Site Vice President, Peach Bottom Atomic Power Station M. Massaro, Plant Manager, Peach Bottom Atomic Power Station J. Armstrong, Regulatory Assurance Manager - Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President - Nuclear Oversight Director, Licensing and Regulatory Affairs J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Manager Licensing, PBAPS Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)

S. Pattison, Maryland Department of Environment A. Lauland, Maryland Department of Environment T. Snyder, Maryland Department of Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council R. Ayers, Harford County Emergency Management E. Crist, Harford County Emergency Management L. Ploener, Harford County Emergency Management Chief R. K. Brooks, Cecil County Emergency Management Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Department of Environment, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists

C. Pardee 2 Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277; 50-278 License Nos.: DPR-44, DPR-56 Distribution w/encl:

S. Collins, RA M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS G. West, RI OEDO J. White, DRS H. Chernoff, NRR L. Doerflein, DRS P. Bamford, PM, NRR R. Conte, DRS J. Hughey, NRR L. Scholl, DRS J. Lubinski, NRR P. Frechette, DRS P. Krohn, DRP D. Silk, DRS R. Fuhrmeister, DRP D. Screnci, PAO T. Setzer, DRP N. Sheehan, PAO F. Bower, DRP - SRI R. Barkley, ORA M. Brown, DRP, RI D. Holody, ORA S. Schmitt, Resident OA Region I Docket Room (with concurrences)

RidsNrrDirslpab@nrc.gov J. Thompson, NRR (JWT1@nrc.gov)

SUNSI Review Complete: PGK (Reviewer==s Initials)

DOCUMENT NAME: T:\DRP\BRANCH4\ROP 8 LETTERS\PBAPS ROP REALIGNMENT INSPECTION PLAN.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME RFuhrmeister/ PKrohn/

DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY

Page 1 of 2 Peach Bottom 12/13/2007 10:49:43 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111121 - CDBI 6 2, 3 IP 7111121 Component Design Bases Inspection 03/17/2008 03/21/2008 Baseline Inspections 2, 3 IP 7111121 Component Design Bases Inspection 03/31/2008 04/04/2008 Baseline Inspections 2, 3 IP 7111121 Component Design Bases Inspection 04/07/2008 04/11/2008 Baseline Inspections 7111111B - LSRO REQUAL INSPECTION 4 2, 3 IP 7111111B Licensed Operator Requalification Program 06/02/2008 06/05/2008 Baseline Inspections EP - EP EXERCISE EVALUATION 4 2, 3 IP 7111401 Exercise Evaluation 04/21/2008 04/25/2008 EP Baseline Inspectio 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/21/2008 04/25/2008 EP Baseline Inspectio 2, 3 IP 71151-EP01 Drill/Exercise Performance 04/21/2008 04/25/2008 Baseline Inspections 2, 3 IP 71151-EP02 ERO Drill Participation 04/21/2008 04/25/2008 Baseline Inspections 2, 3 IP 71151-EP03 Alert & Notification System 04/21/2008 04/25/2008 Baseline Inspections ISFSI - MAY 2008 UNIT 2&3 ISFSI LOADING CAMPAIGN 1 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 05/01/2008 05/31/2008 Other Routine 7112201 - PUB RAD SAFETY - RETS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/12/2008 05/16/2008 Baseline Inspections DECOM - PEACH BOTTOM UNIT 1- JULY 2008 DECOM 1 1 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 06/30/2008 07/04/2008 Other Routine 1 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 06/30/2008 07/04/2008 Other Routine 1 IP 83750 Occupational Radiation Exposure 06/30/2008 07/04/2008 Other Routine 1 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 06/30/2008 07/04/2008 Other Routine 1 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials 06/30/2008 07/04/2008 Other Routine 71122 - RADWASTE 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 07/28/2008 08/01/2008 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/28/2008 08/01/2008 Baseline Inspections 2, 3 IP 7112202 Radioactive Material Processing and Transportation 07/28/2008 08/01/2008 Baseline Inspections 12/08EXM - U2&3 INITIAL OPERATOR LICENSING EXAM 4 2 U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM 11/10/2008 11/14/2008 Not Applicable 2 U01692 FY09 - PEACH BOTTOM UNIT 2 & 3 INITIAL OPERATOR EXAM 12/08/2008 12/19/2008 Not Applicable 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 08/18/2008 08/22/2008 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 08/18/2008 08/22/2008 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/18/2008 08/22/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 09/22/2008 09/26/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Peach Bottom 12/13/2007 10:49:43 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 2, 3 IP 7112102 ALARA Planning and Controls 09/22/2008 09/26/2008 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/22/2008 09/26/2008 Baseline Inspections 7111108G - U2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 09/29/2008 10/03/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/10/2008 11/14/2008 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 11/10/2008 11/14/2008 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/10/2008 11/14/2008 Baseline Inspections 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 11/10/2008 11/14/2008 Baseline Inspections 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 11/10/2008 11/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.