UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
March 3, 2010
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Rd
Warrenville, IL 60555
SUBJECT:
ANNUAL ASSESSMENT LETrER - PEACH BOTTOM ATOMIC POWER
STATION (05000277/2010001 and (500027812010001)
Dear Mr. Pardee:
On February 16,2010, the NRC staff completed its performance review of Peach Bottom
Atomic Power Station (PBAPS). Our technical staff reviewed performance indicators (Pis)
for the most recent quarter and inspection results for the period from January 1, 2009 through
December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety
performance during this period and our plans for future inspections at your facility.
The performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked "Official Use Only - Security Information" will include the
security cornerstone review and resultant inspection plan.
Overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and
safety and fully met all cornerstone objectives. Plant performance for the most recent quarter
as well as the first three quarters of the assessment cycle was within the Licensee Response
column of the NRC's Action Matrix, based on all inspection findings being classified as having
. very low safety significance (Green) and all Pis indicating performance at a level requiring no
additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process
(ROP) baseline inspections at your facility. We also plan on conducting infrequently performed
inspection procedures (IPs) which include IP 60855, "Operation of an ISFSI" and IP 92702,
"Follow-up on Corrective Actions for Violations and Deviations."
Regarding IP 92702, the staff issued a Confirmatory Order to Exelon on December 1,2009,
formalizing an agreement reached through the NRC's Alternative Dispute Resolution process
regarding two acts of deliberate misconduct (ML093350150) 1. The first act involved a
maintenance supervisor who provided incomplete and inaccurate information for unescorted
access to the site. The second act involved a licensed reactor operator who deliberately failed
to report an arrest in accordance with the site security program procedures associated with
driving under the influence. In accordance with this Confirmatory Order, the NRC will conduct
the IP 92702 follow-up inspection to review the corrective actions associated with these issues.
1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter
are publicly available using the accession number in ADAMS.
C. Pardee
2
Additionally, on January 6, 2009, the staff issued a severity level III Notice of Violation {NOV},
with a $65,000 civil penalty (ML083530084) related to the inattentive security officer issue
which was discovered in September 2007. As discussed in the 2009 Mid Cycle Performance
Assessment Letter (ML0924402530), the extensive inspections completed adequately
addressed this issue.
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of
any scheduling conflicts and personnel availability issues well in advance of inspector arrival
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised
at the mid-cycle review.
I n accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Rec:ords (PARS) component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic
Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please c(mtact me at (610) 337-5120 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
~~--s
Paul G. Krohn, Chief
Division of Reactor Projects
Projects Branch 4
Docket Nos. 50-277,50-278
cc w/encl: Distribution via ListServe
Peach Bottom Inspection/Activity Plan
C. Pardee
3
Additionally, on January 6, 2009, the staff issued a severity level III Notice of Violation (NOV),
with a $65,000 civil penalty (Ml083530084) related to the inattentive security officer issue
which was discovered in September 2007. As discussed in the 2009 Mid Cycle Performance
Assessment letter (Ml0924402530), the extensive inspections completed adequately
addressed this issue.
The enclosed inspection plan details the inspections, less those related to physical protection,
scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of
any scheduling conflicts and personnel availability issues well in advance of inspector arrival
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised
at the mid~cycle review.
In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rmladams.html{the Public Electronic
Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (610) 337~5120 with any
questions you may have regarding this letter or the inspection plan.
Sincerely.
IRAJ
Paul G. Krohn, Chief
Division of Reactor Projects
Projects Branch 4
Distribution wJencl: (via E-mail)
DRS Branch Chiefs (6)
S. Collins, RA
N. McNamara, SLO
M. Dapas, DRA
D. Tifft, SLO
D. Lew, DRP
S. Barr, RI
J. Clifford, DRP
P. Kaufman, RI
P. Krohn, DRP
D.Silk,RI
A. Rosebrook. DRP
D. Serenei, PAO
E. Torres, DRP
N. Sheehan, PAO
J. Bream, DRP
R Barkley, ORA
A. Ziedonis, DRP, RI
RidsNrrPMPeachBottom Resource
S. Schmitt, DRP, OA
RidsNrrDirslpab@nrc.gov
L. Trocine, RI OEDO
ROPreportsResource@nrc.gov
DRS Directors
SUNSI REVIEW COMPLE"rE: PGK
(Reviewer's Inifials)
DOCUMENT NAME: S:\\ROP-10 EOC REVIEw\\BRANCH 4\\PBAPS ROP-10 EOC\\PEACH BOTTOM
2009 EOC LETTER.DOC
After declaring this document "An Official Agency Record" it !ill! be released to the Public.
To receive aCOpy of this document, indicate in tile box: 'C' =Copy wi1hout attachmentfeooiosure "E' ;:: Copy wl1h attachmenfJenclosure ON' ;:: No copy
OFFICE
RIIDRP
I
RIIDRS
I
RIIDRP
I
NAME
~Rosebrookl AAR
JTrappl JT
PKrohnl PGK
DATE
02121110
02/24/10
03/02/10
OFFICIAL RECORD COPY
Page 1 of3
03/0212010
11:13:12
Report 22
Planned Dates
End
12/3112010
MODS
03(0512.010
IP 7111117T
03/19/2010
IP 7111117T
07/12EXM
06/1812010
U0179S
Peach Bottom
Inspection 1Activity Plan
01/01/2010 - 06/30/2011
- EP ANNUAL REPORT
Title
Drill Evaluation
- PERMANENT PLANT MODIFICATIONS
Evaluations of Changes, Tests. or Experiments and Permanent Pla'nl Modifications
Evaluations of Changes. Tests. or Experiments and Permanent Plant Modifications
- LSRO OPERATOR LICENSING EXAM
FY*10 PEACH BOTTOM LSRO INITIAL OPERATOR LICENSING EXAM
4
4
- 3
2,3
2,3
2.3
2
2
2,3
2,3
2,3
2,3
2,3
2.3
2.3
2.3
2,3
2,3
2,3
Start
01/01/2010
03/01/2010
03/15/2010
06/07/2010
0711212010
03/2912010
05/17/2010
06114/2010
06/14/2010
06114/2010
06/14/2010
06/21/2010
06/21/2010
0612112010
06/2112010
06/2112010
08/09/2010
08109/2010
08/09/2010
08/09/2010
08/0912010
08109/2010
08/09/2010
08/09/2010
08109/2010
07/23/2010
U01795
FY*10 PEACH BOTTOM LSRO INITIAL OPERATOR LICENSING EXAM
RADWASTE - RAD WASTE
04102/2010
0512112010
06/18/2010
06/1812010
0611812010
06/18/2010
06/25/2010
Oa125/2010
7111107T
IP 7111107T
TI-173
IP 60855*
!P 71124.06
EPEX
Radioactive SoUd Waste Processing and Radioacllve Material Handling, Storage, and Transportation
- TRIENNIAL HEAT SINK
Heat Sink Performance
- GROUND WATER TI
Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative
" HP*EFFULENTS IISFS[ I INSTRUMENTS
Operation Of An ISFSI
Radiation Monitoring Instrumentation
Radioactive Gaseous and Liquid EffluentTrestment
" EP EXERCISE EVALUATION
Exercise Evaluation
Emergency Action level and Emergency Plan Changes
06{25/2010
IP 71151*EP01
Drill/Exercise Performance
06/25/2010
iP 71151-EP02
ERO Drill Partldpation
06/25/2010
IP 71151-EP03
Alert & Notification System
08/13/201Q
08/13/2010
0811312010
0811312010
08113/2010
08/13/2010
08113/2010
08/13/2010
0811312010
2561
lP 83750
- DECOMMISSIONING PWR RXR INSPECT PROG
Organization. Management, And Cost Controls At Permanently Shuldown Reactors
Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors
Self-Assessment. Auditing. And Corrective Action At Permanently Shutdown Reactors
Maintenance And SUNeUiance At Permanenly Shutdown Reactors
Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors
Occupational Radiation Exposure
Radioactive Waste Treatment, And Effluent And Environmental Monitoring
Solid Radioactive Waste Management And Transportation Of Radioactive Materials
Fol1owup On Corrective Actions For Violations And Deviations
F,hiS report does not include INPO and OUTAGE activities.
..--
--.
~~~=~r,::it:,::!:=:~~~~~=-~,__---J
4
Page 2 of3
Peach Bottom
0310212010
11 :13:12
Inspection I Activity Plan
Report 22
01/01/2010 ~ 06/30/2011
Planned Dates
End
Title
.,
- ALARAIAIRIDOSElINSTRUMENTS
2.3
2.3
2,3
2,3
2
2,3
2,3
2,3
2,3
2,3
2
2
2.3
2,3
2,3
2,3
2.3
2.3
2.3
2,3
2,3
2,3
2,3
2,3
2.3
Start
08/23/2010
08l23{2010
0812312010
08/23/2010
09/20/2010
09/20/2010
09/20/2010
09120/2010
09120/2010
09/2012010
01/0312011
0113112011
10/25/2010
10f25/2010
10/25/2010
10/29/2010
11/29/2010
01/01/2011
03/0712011
01f31f2011
01/31/2011
01/3112011
01/31/2011
01/31/2011
01/3112011
08127/2010
08127/2010
08/27/2010
08/27/2010
09/24/2010
09/2412010
0912412010
09/2412010
09124/2010
09124/2010
01/07/2011
02/1112011
10/2912010
10/29/2010
10/29/2010
IP 71124,03
7111108G
IP 711110aG
OUTAGE
01131EXM
U01769
U01769
Occupational ALARA Planning and Controls
In-Plant Airborne Radioactivity Control and MitigatIon
Occupational Dose Assessment
Radiation Monitoring Instrumentation
- U21NSERVICE INSPECTION
Inservice Inspection Activities* BWR
- ACCESS/ALARAIAIRIDOSE/INST
RadiOlogical Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
In*PlantAirbome Radioactivity Control and Mitigation
Occupational Dose Assessment
Radiation Monitoring Instrumentation
- OPERATOR LICENSING INITIAL EXAMS
FY11 * PEACH BOTTOM UNITS 2&3 INITIAL OPERATOR LICENSING EXAM
FY11 * PEACH BOTTOM UNITS 2&3 INITIAL OPERATOR LICENSING EXAM
- ACCESS/ALARAIPI
RadiOlogical Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
Performance Indicator Verification
CLOSEOUT* CLOSEOUT - WILLFUL MISCONDUCT CONF ORDER
12/31/2010
Followup On Corrective Actions For Violations And Deviations
TI*177
- MANAGING GAS ACCUMULATION IN ECCS
12/03/2010
12/31/2011
03/11/2011
02/04/2011
02/0412011
02104/2011
02/04/2011
711111 B
IP 7111111B
EP PROGR
Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal 8. Containment Spray System
- EP ANNUAL REPORT
4
Drill Evaluation
- PB REQUAL INSP WIP/F RESULTS
3
Licensed Operator Requalification Program
- EP PROGRAM INSPECTION
1
Radiological Environmental Monitoring Program
Emergency Response Organization Augmentation Testing
Emergency Action Level ami Emergency Plan Changes
Correction of Emergency Preparedness Weaknesses and Deficiencies
02/04/2011
02104{2011
IP 71151-EP01
IP 71151*EP02
DrilllEX6(cise Performance
ERO Drill Participation
his report does not include INPOand OUTAGE activities.
iThis report shows only on-site and announced inspection procedures,
'-c.w:t£\\IiOiIfII
i 6iIJMilii !;;jl¥'Jf&i!I ti"iS;t6llMUMt4fW'&WWiAJ4S .al1l41%.'e%<i!Hl~>~~~AW.l.DkadiiHi!f1il$GiK!i1
5
3
03102/2010
Page 3 of3
Report 22
2,3
2,3
2,3
2,3
2,3
2,3
2,3
Peach Bottom
11:13:12
Inspection I Activity Plan
01/0112010 * 06/30/2011
Planned Dates
Start
!ifMM,tb!Bf"4'$iU End J 112fGect!!!,n.?ectlvlt~.J IMtt
'<<IW**:#&$
B558&&iiV* &
Title
ri;'§!
EP PROGR - EP PROGRAM INSPECTION
0113112011
02/04/2011
IP 71151*EP03
Alert & Notification System
7111121
-COBI
6
02f14/2011
02/1812011
Component Design Bases Inspection
02/28/2011
03/04/2011
Component Design Bases Inspection
03107/2011
03111f2011
Component Design Bases Inspection
HP-71124
- HP*/INSTRUMENTSIREMPIISFSI
06/0612011
06110/2011
Operation Of An ISFSI
06/06/2011
06/10/2011
Radiation Monitoring Instrumentation
06/0612011
06/10/2011
his report does nolinclude INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.