Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277-10-001 and 05000278-10-001) and Report 22
ML100621009
Person / Time
Site: Peach Bottom  
Issue date: 03/03/2010
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pardee C
Exelon Generation Co, Exelon Nuclear
KROHN P, RI/DRP/PB4/610-337-5120
References
IR-10-001
Download: ML100621009 (6)


See also: IR 05000277/2010001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYLVANIA 19406-1415

March 3, 2010

Mr. Charles G. Pardee

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd

Warrenville, IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETrER - PEACH BOTTOM ATOMIC POWER

STATION (05000277/2010001 and (500027812010001)

Dear Mr. Pardee:

On February 16,2010, the NRC staff completed its performance review of Peach Bottom

Atomic Power Station (PBAPS). Our technical staff reviewed performance indicators (Pis)

for the most recent quarter and inspection results for the period from January 1, 2009 through

December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety

performance during this period and our plans for future inspections at your facility.

The performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked "Official Use Only - Security Information" will include the

security cornerstone review and resultant inspection plan.

Overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and

safety and fully met all cornerstone objectives. Plant performance for the most recent quarter

as well as the first three quarters of the assessment cycle was within the Licensee Response

column of the NRC's Action Matrix, based on all inspection findings being classified as having

. very low safety significance (Green) and all Pis indicating performance at a level requiring no

additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process

(ROP) baseline inspections at your facility. We also plan on conducting infrequently performed

inspection procedures (IPs) which include IP 60855, "Operation of an ISFSI" and IP 92702,

"Follow-up on Corrective Actions for Violations and Deviations."

Regarding IP 92702, the staff issued a Confirmatory Order to Exelon on December 1,2009,

formalizing an agreement reached through the NRC's Alternative Dispute Resolution process

regarding two acts of deliberate misconduct (ML093350150) 1. The first act involved a

maintenance supervisor who provided incomplete and inaccurate information for unescorted

access to the site. The second act involved a licensed reactor operator who deliberately failed

to report an arrest in accordance with the site security program procedures associated with

driving under the influence. In accordance with this Confirmatory Order, the NRC will conduct

the IP 92702 follow-up inspection to review the corrective actions associated with these issues.

1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter

are publicly available using the accession number in ADAMS.

C. Pardee

2

Additionally, on January 6, 2009, the staff issued a severity level III Notice of Violation {NOV},

with a $65,000 civil penalty (ML083530084) related to the inattentive security officer issue

which was discovered in September 2007. As discussed in the 2009 Mid Cycle Performance

Assessment Letter (ML0924402530), the extensive inspections completed adequately

addressed this issue.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid-cycle review.

I n accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Rec:ords (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html{the Public Electronic

Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please c(mtact me at (610) 337-5120 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

~~--s

Paul G. Krohn, Chief

Division of Reactor Projects

Projects Branch 4

Docket Nos. 50-277,50-278

License Nos. NPF-44, NPF-56

cc w/encl: Distribution via ListServe

Peach Bottom Inspection/Activity Plan

C. Pardee

3

Additionally, on January 6, 2009, the staff issued a severity level III Notice of Violation (NOV),

with a $65,000 civil penalty (Ml083530084) related to the inattentive security officer issue

which was discovered in September 2007. As discussed in the 2009 Mid Cycle Performance

Assessment letter (Ml0924402530), the extensive inspections completed adequately

addressed this issue.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid~cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rmladams.html{the Public Electronic

Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (610) 337~5120 with any

questions you may have regarding this letter or the inspection plan.

Sincerely.

IRAJ

Paul G. Krohn, Chief

Division of Reactor Projects

Projects Branch 4

Distribution wJencl: (via E-mail)

DRS Branch Chiefs (6)

S. Collins, RA

N. McNamara, SLO

M. Dapas, DRA

D. Tifft, SLO

D. Lew, DRP

S. Barr, RI

J. Clifford, DRP

P. Kaufman, RI

P. Krohn, DRP

D.Silk,RI

A. Rosebrook. DRP

D. Serenei, PAO

E. Torres, DRP

N. Sheehan, PAO

J. Bream, DRP

R Barkley, ORA

F. Bower, DRP, SRI

John Thompson, NRR

A. Ziedonis, DRP, RI

RidsNrrPMPeachBottom Resource

S. Schmitt, DRP, OA

RidsNrrDirslpab@nrc.gov

L. Trocine, RI OEDO

ROPreportsResource@nrc.gov

DRS Directors

SUNSI REVIEW COMPLE"rE: PGK

(Reviewer's Inifials)

ML100621Q09

DOCUMENT NAME: S:\\ROP-10 EOC REVIEw\\BRANCH 4\\PBAPS ROP-10 EOC\\PEACH BOTTOM

2009 EOC LETTER.DOC

After declaring this document "An Official Agency Record" it !ill! be released to the Public.

To receive aCOpy of this document, indicate in tile box: 'C' =Copy wi1hout attachmentfeooiosure "E' ;:: Copy wl1h attachmenfJenclosure ON' ;:: No copy

OFFICE

RIIDRP

I

RIIDRS

I

RIIDRP

I

NAME

~Rosebrookl AAR

JTrappl JT

PKrohnl PGK

DATE

02121110

02/24/10

03/02/10

OFFICIAL RECORD COPY

Page 1 of3

03/0212010

11:13:12

Report 22

Planned Dates

End

EP

12/3112010

IP 7111406

MODS

03(0512.010

IP 7111117T

03/19/2010

IP 7111117T

07/12EXM

06/1812010

U0179S

Peach Bottom

Inspection 1Activity Plan

01/01/2010 - 06/30/2011

- EP ANNUAL REPORT

Title

Drill Evaluation

- PERMANENT PLANT MODIFICATIONS

Evaluations of Changes, Tests. or Experiments and Permanent Pla'nl Modifications

Evaluations of Changes. Tests. or Experiments and Permanent Plant Modifications

  • LSRO OPERATOR LICENSING EXAM

FY*10 PEACH BOTTOM LSRO INITIAL OPERATOR LICENSING EXAM

4

4

3

2,3

2,3

2.3

2

2

2,3

2,3

2,3

2,3

2,3

2.3

2.3

2.3

2,3

2,3

2,3

Start

01/01/2010

03/01/2010

03/15/2010

06/07/2010

0711212010

03/2912010

05/17/2010

06114/2010

06/14/2010

06114/2010

06/14/2010

06/21/2010

06/21/2010

0612112010

06/2112010

06/2112010

08/09/2010

08109/2010

08/09/2010

08/09/2010

08/0912010

08109/2010

08/09/2010

08/09/2010

08109/2010

07/23/2010

U01795

FY*10 PEACH BOTTOM LSRO INITIAL OPERATOR LICENSING EXAM

RADWASTE - RAD WASTE

04102/2010

0512112010

06/18/2010

06/1812010

0611812010

06/18/2010

06/25/2010

Oa125/2010

IP 71124.08

7111107T

IP 7111107T

TI-173

IP 2515/173

RETS

IP 60855*

IP 71124.05

!P 71124.06

EPEX

IP 7111401

IP 7111404

Radioactive SoUd Waste Processing and Radioacllve Material Handling, Storage, and Transportation

- TRIENNIAL HEAT SINK

Heat Sink Performance

- GROUND WATER TI

Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative

" HP*EFFULENTS IISFS[ I INSTRUMENTS

Operation Of An ISFSI

Radiation Monitoring Instrumentation

Radioactive Gaseous and Liquid EffluentTrestment

" EP EXERCISE EVALUATION

Exercise Evaluation

Emergency Action level and Emergency Plan Changes

06{25/2010

IP 71151*EP01

Drill/Exercise Performance

06/25/2010

iP 71151-EP02

ERO Drill Partldpation

06/25/2010

IP 71151-EP03

Alert & Notification System

08/13/201Q

08/13/2010

0811312010

0811312010

08113/2010

08/13/2010

08113/2010

08/13/2010

0811312010

2561

IP 36801

IP 37801

IP 40801

IP 62801

IP 71801

lP 83750

IP 84750

IP 86750

IP 92702

- DECOMMISSIONING PWR RXR INSPECT PROG

Organization. Management, And Cost Controls At Permanently Shuldown Reactors

Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors

Self-Assessment. Auditing. And Corrective Action At Permanently Shutdown Reactors

Maintenance And SUNeUiance At Permanenly Shutdown Reactors

Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors

Occupational Radiation Exposure

Radioactive Waste Treatment, And Effluent And Environmental Monitoring

Solid Radioactive Waste Management And Transportation Of Radioactive Materials

Fol1owup On Corrective Actions For Violations And Deviations

F,hiS report does not include INPO and OUTAGE activities.

..--

--.

~~~=~r,::it:,::!:=:~~~~~=-~,__---J

4

Page 2 of3

Peach Bottom

0310212010

11 :13:12

Inspection I Activity Plan

Report 22

01/01/2010 ~ 06/30/2011

Planned Dates

End

Title

.,

HP

  • ALARAIAIRIDOSElINSTRUMENTS

2.3

2.3

2,3

2,3

2

2,3

2,3

2,3

2,3

2,3

2

2

2.3

2,3

2,3

2,3

2.3

2.3

2.3

2,3

2,3

2,3

2,3

2,3

2.3

Start

08/23/2010

08l23{2010

0812312010

08/23/2010

09/20/2010

09/20/2010

09/20/2010

09120/2010

09120/2010

09/2012010

01/0312011

0113112011

10/25/2010

10f25/2010

10/25/2010

10/29/2010

11/29/2010

01/01/2011

03/0712011

01f31f2011

01/31/2011

01/3112011

01/31/2011

01/31/2011

01/3112011

08127/2010

08127/2010

08/27/2010

08/27/2010

09/24/2010

09/2412010

0912412010

09/2412010

09124/2010

09124/2010

01/07/2011

02/1112011

10/2912010

10/29/2010

10/29/2010

IP 71124.02

IP 71124,03

IP 71124.04

IP 71124.05

7111108G

IP 711110aG

OUTAGE

IP 71124.01

IP 71124.02

IP 71124.03

IP 71124.04

IP 71124.05

01131EXM

U01769

U01769

HP

IP 71124.01

IP 71124.02

IP 71151

Occupational ALARA Planning and Controls

In-Plant Airborne Radioactivity Control and MitigatIon

Occupational Dose Assessment

Radiation Monitoring Instrumentation

  • U21NSERVICE INSPECTION

Inservice Inspection Activities* BWR

- ACCESS/ALARAIAIRIDOSE/INST

RadiOlogical Hazard Assessment and Exposure Controls

Occupational ALARA Planning and Controls

In*PlantAirbome Radioactivity Control and Mitigation

Occupational Dose Assessment

Radiation Monitoring Instrumentation

  • OPERATOR LICENSING INITIAL EXAMS

FY11 * PEACH BOTTOM UNITS 2&3 INITIAL OPERATOR LICENSING EXAM

FY11 * PEACH BOTTOM UNITS 2&3 INITIAL OPERATOR LICENSING EXAM

- ACCESS/ALARAIPI

RadiOlogical Hazard Assessment and Exposure Controls

Occupational ALARA Planning and Controls

Performance Indicator Verification

CLOSEOUT* CLOSEOUT - WILLFUL MISCONDUCT CONF ORDER

12/31/2010

IP 92702

Followup On Corrective Actions For Violations And Deviations

TI*177

- MANAGING GAS ACCUMULATION IN ECCS

12/03/2010

12/31/2011

03/11/2011

02/04/2011

02/0412011

02104/2011

02/04/2011

IP 25151177

EP

IP 7111406

711111 B

IP 7111111B

EP PROGR

IP 7111402

IP 7111403

IP 7111404

IP 7111405

Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal 8. Containment Spray System

  • EP ANNUAL REPORT

4

Drill Evaluation

- PB REQUAL INSP WIP/F RESULTS

3

Licensed Operator Requalification Program

- EP PROGRAM INSPECTION

1

Radiological Environmental Monitoring Program

Emergency Response Organization Augmentation Testing

Emergency Action Level ami Emergency Plan Changes

Correction of Emergency Preparedness Weaknesses and Deficiencies

02/04/2011

02104{2011

IP 71151-EP01

IP 71151*EP02

DrilllEX6(cise Performance

ERO Drill Participation

his report does not include INPOand OUTAGE activities.

iThis report shows only on-site and announced inspection procedures,

'-c.w:t£\\IiOiIfII

i 6iIJMilii !;;jl¥'Jf&i!I ti"iS;t6llMUMt4fW'&WWiAJ4S .al1l41%.'e%<i!Hl~>~~~AW.l.DkadiiHi!f1il$GiK!i1

5

3

03102/2010

Page 3 of3

Report 22

2,3

2,3

2,3

2,3

2,3

2,3

2,3

Peach Bottom

11:13:12

Inspection I Activity Plan

01/0112010 * 06/30/2011

Planned Dates

Start

!ifMM,tb!Bf"4'$iU End J 112fGect!!!,n.?ectlvlt~.J IMtt

'<<IW**:#&$

B558&&iiV* &

Title

ri;'§!

EP PROGR - EP PROGRAM INSPECTION

0113112011

02/04/2011

IP 71151*EP03

Alert & Notification System

7111121

-COBI

6

02f14/2011

02/1812011

IP 7111121

Component Design Bases Inspection

02/28/2011

03/04/2011

IP 7111121

Component Design Bases Inspection

03107/2011

03111f2011

IP 711112'1

Component Design Bases Inspection

HP-71124

- HP*/INSTRUMENTSIREMPIISFSI

06/0612011

06110/2011

IP 60855

Operation Of An ISFSI

06/06/2011

06/10/2011

IP 71124.05

Radiation Monitoring Instrumentation

06/0612011

06/10/2011

IP 71124.07

Public Radiation Safety

his report does nolinclude INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.