UNITED STATES NUCLEAR REGULATORY COM M ISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 2, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348

SUBJECT:

ANNUAL ASSESSMENT LETTER - PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2007001 AND 05000278/2007001)

Dear Mr. Crane:

On February 12, 2007, the NRC staff completed its performance review of Peach Bottom Atomic Power Station (Peach Bottom). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct an inspection of your activities related to an Independent Spent Fuel Storage Installation.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

C. Crane 2 Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56

Enclosure:

Peach Bottom Inspection / Activity Plan cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Vice President, Licensing and Regulatory Affairs Senior Vice President, Mid-Atlantic Senior Vice President - Operations Support Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Manager Licensing, PBAPS Director, Training Correspondence Control Desk Director, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)

G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)

Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)

J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams E. Epstein, TMI Alert R. Fletcher, Department of Environment, Radiological Health Program

Page 1 of 2 Peach Bottom 03/02/2007 08:37:44 Inspection / Activity Plan Report 22 01/01/2007 - 06/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2/5EXAM - OPERATOR LICENSING INITIAL EXAMS 3 2 U01612 PEACH BOTTOM, UNIT 2&3 INITIAL EXAM (2/07) 01/08/2007 01/12/2007 Not Applicable 2 U01612 PEACH BOTTOM, UNIT 2&3 INITIAL EXAM (2/07) 02/05/2007 02/16/2007 Not Applicable 7111111B - L.O.(PWR.) REQUAL. PROG. + P/F REVIEW 4 2, 3 IP 7111111B Licensed Operator Requalification Program 02/19/2007 02/23/2007 Baseline Inspections 2, 3 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections 71122 - PUBLIC RAD PROT - RETS 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/12/2007 02/16/2007 Baseline Inspections 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/12/2007 02/16/2007 Baseline Inspections 2, 3 IP 7112202 Radioactive Material Processing and Transportation 02/12/2007 02/16/2007 Baseline Inspections 7111117 - MODS AND 50.59 4 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/05/2007 03/09/2007 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 03/05/2007 03/09/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/09/2007 04/13/2007 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 04/09/2007 04/13/2007 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/09/2007 04/13/2007 Baseline Inspections 71152B - PI&R 4 2, 3 IP 71152B Identification and Resolution of Problems 04/23/2007 04/27/2007 Baseline Inspections 2, 3 IP 71152B Identification and Resolution of Problems 05/14/2007 05/18/2007 Baseline Inspections 60855.1 - OPERATION OF AN ISFSI 3 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 04/23/2007 05/25/2007 Other Routine 71114 - EP PRGM INSP 1 2, 3 IP 7111402 Alert and Notification System Testing 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 71151-EP01 Drill/Exercise Performance 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 71151-EP02 ERO Drill Participation 06/18/2007 06/22/2007 Baseline Inspections 2, 3 IP 71151-EP03 Alert & Notification System 06/18/2007 06/22/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 06/18/2007 06/22/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/30/2007 08/03/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Peach Bottom 03/02/2007 08:37:44 Inspection / Activity Plan Report 22 01/01/2007 - 06/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 12/10EXM - INITIAL LSRO OPERATOR EXAM 2 2 U01631 PEACH BOTTOM LSRO EXAM (FY08) 11/19/2007 11/23/2007 Not Applicable 2 U01631 PEACH BOTTOM LSRO EXAM (FY08) 12/10/2007 12/14/2007 Not Applicable 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/10/2007 09/14/2007 Baseline Inspections 7111108G - U3 IN-SERVICE INSPECTION 1 3 IP 7111108G Inservice Inspection Activities - BWR 10/01/2007 10/05/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/08/2007 10/12/2007 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 10/08/2007 10/12/2007 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/08/2007 10/12/2007 Baseline Inspections 7111111B - LSRO REQUAL PROG. OPTEST @PB +PF REVIEW 2 2, 3 IP 7111111B Licensed Operator Requalification Program 11/01/2007 11/01/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 12/10/2007 12/14/2007 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 12/10/2007 12/14/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 12/10/2007 12/14/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 02/25/2008 02/29/2008 Baseline Inspections 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/25/2008 02/29/2008 Baseline Inspections 7111121 - CDBI 8 2, 3 IP 7111121 Component Design Bases Inspection 03/10/2008 03/14/2008 Baseline Inspections 2, 3 IP 7111121 Component Design Bases Inspection 03/24/2008 03/28/2008 Baseline Inspections 2, 3 IP 7111121 Component Design Bases Inspection 03/31/2008 04/04/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/12/2008 05/16/2008 Baseline Inspections 7111111B - LSRO REQUAL INSPECTION 2 2, 3 IP 7111111B Licensed Operator Requalification Program 06/02/2008 06/05/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

C. Crane 3 Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel K. Gray, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56

Enclosure:

Peach Bottom Inspection / Activity Plan cc w/encl: Environmental Protection Chief Operating Officer, Exelon Generation Company, LLC R. McLean, Power Plant and Environmental Review Division Site Vice President, Peach Bottom Atomic Power Station (MD)

Plant Manager, Peach Bottom Atomic Power Station G. Aburn, Maryland Department of Environment Regulatory Assurance Manager - Peach Bottom T. Snyder, Director, Air and Radiation Management Associate General Counsel, Exelon Generation Company Administration, Manager, Financial Control & Co-Owner Affairs Maryland Department of the Environment (SLO, MD)

Vice President, Licensing and Regulatory Affairs Public Service Commission of Maryland, Engineering Senior Vice President, Mid-Atlantic Division Senior Vice President - Operations Support Board of Supervisors, Peach Bottom Township Senior Vice President, Nuclear Services B. Ruth, Council Administrator of Harford County Council Director, Licensing and Regulatory Affairs Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance J. Bradley Fewell, Assistant General Counsel, Exelon TMI - Alert (TMIA)

Nuclear J. Johnsrud, National Energy Committee, Sierra Club Manager Licensing, PBAPS Mr. & Mrs. Kip Adams Director, Training E. Epstein, TMI Alert Correspondence Control Desk R. Fletcher, Department of Environment, Radiological Director, Bureau of Radiation Protection, Department of Health Program Distribution w/encl:

S. Collins, RA M. Dapas, DRA M. Gray, DRP C. Khan, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Lubinski, NRR M. Kowal, NRR R. Ennis, NRR H. Chernoff, NRR Region I Docket Room RidsNrrDirsIpab@nrc.gov Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: S:\ROP-7 EOC Review\2006 ROP-7 Annual Assessment Letters\PDF Merged files\2006 EOC Peach Bottom Assessment Letter.wpd SUNSI Review Complete: MKG (Reviewer's Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME RFuhrmeister MGray DATE 02/28 /07 03/01/07 OFFICIAL RECORD COPY