UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 2, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348
SUBJECT:
ANNUAL ASSESSMENT LETTER - PEACH BOTTOM ATOMIC POWER STATION (REPORT 05000277/2007001 AND 05000278/2007001)
Dear Mr. Crane:
On February 12, 2007, the NRC staff completed its performance review of Peach Bottom Atomic Power Station (Peach Bottom). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Overall, Peach Bottom Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct an inspection of your activities related to an Independent Spent Fuel Storage Installation.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
2 C. Crane Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mel Gray, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56
Enclosure:
Peach Bottom Inspection / Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Vice President, Licensing and Regulatory Affairs Senior Vice President, Mid-Atlantic Senior Vice President - Operations Support Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Manager Licensing, PBAPS Director, Training Correspondence Control Desk Director, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)
G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)
Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams E. Epstein, TMI Alert R. Fletcher, Department of Environment, Radiological Health Program
Peach Bottom Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2007 08:37:44 Report 22 3
2/5EXAM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 01/08/2007 01/12/2007 2
U01612 PEACH BOTTOM, UNIT 2&3 INITIAL EXAM (2/07)
Not Applicable 02/05/2007 02/16/2007 2
U01612 PEACH BOTTOM, UNIT 2&3 INITIAL EXAM (2/07) 4 7111111B
- L.O.(PWR.) REQUAL. PROG. + P/F REVIEW Baseline Inspections 02/19/2007 02/23/2007 2, 3 7111111B IP Licensed Operator Requalification Program Baseline Inspections 02/26/2007 03/02/2007 2, 3 7111111B IP Licensed Operator Requalification Program 1
71122
- PUBLIC RAD PROT - RETS Baseline Inspections 02/12/2007 02/16/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/12/2007 02/16/2007 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 02/12/2007 02/16/2007 2, 3 7112202 IP Radioactive Material Processing and Transportation 4
7111117
- MODS AND 50.59 Baseline Inspections 03/05/2007 03/09/2007 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 03/05/2007 03/09/2007 2, 3 7111117B IP Permanent Plant Modifications 1
71121
- OCC RAD SAFETY Baseline Inspections 04/09/2007 04/13/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/09/2007 04/13/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 04/09/2007 04/13/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4
- PI&R Baseline Inspections 04/23/2007 04/27/2007 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 05/14/2007 05/18/2007 2, 3 71152B IP Identification and Resolution of Problems 3
60855.1
- OPERATION OF AN ISFSI Other Routine 04/23/2007 05/25/2007 2, 3 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
71114
- EP PRGM INSP Baseline Inspections 06/18/2007 06/22/2007 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 06/18/2007 06/22/2007 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/18/2007 06/22/2007 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/18/2007 06/22/2007 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/18/2007 06/22/2007 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/18/2007 06/22/2007 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/18/2007 06/22/2007 2, 3 71151-EP03 IP Alert & Notification System 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/18/2007 06/22/2007 2, 3 7112202 IP Radioactive Material Processing and Transportation 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/30/2007 08/03/2007 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Peach Bottom Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2007 08:37:44 Report 22 2
12/10EXM
- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007 2
U01631 PEACH BOTTOM LSRO EXAM (FY08)
Not Applicable 12/10/2007 12/14/2007 2
U01631 PEACH BOTTOM LSRO EXAM (FY08) 1 71121
- OCC RAD SAFETY Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 09/10/2007 09/14/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111108G
- U3 IN-SERVICE INSPECTION Baseline Inspections 10/01/2007 10/05/2007 3
7111108G IP Inservice Inspection Activities - BWR 1
71121
- OCC RAD SAFETY Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 10/08/2007 10/12/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 2
7111111B
- LSRO REQUAL PROG. OPTEST @PB +PF REVIEW Baseline Inspections 11/01/2007 11/01/2007 2, 3 7111111B IP Licensed Operator Requalification Program 1
71121
- OCC RAD SAFETY Baseline Inspections 12/10/2007 12/14/2007 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/10/2007 12/14/2007 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 12/10/2007 12/14/2007 2, 3 71151 IP Performance Indicator Verification 1
71121
- OCC RAD SAFETY Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 02/25/2008 02/29/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 8
7111121
- CDBI Baseline Inspections 03/10/2008 03/14/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/24/2008 03/28/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 03/31/2008 04/04/2008 2, 3 7111121 IP Component Design Bases Inspection 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/12/2008 05/16/2008 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 2
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections 06/02/2008 06/05/2008 2, 3 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
3 C. Crane Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mel K. Gray, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. NPF-44, NPF-56
Enclosure:
Peach Bottom Inspection / Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Vice President, Licensing and Regulatory Affairs Senior Vice President, Mid-Atlantic Senior Vice President - Operations Support Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Manager Licensing, PBAPS Director, Training Correspondence Control Desk Director, Bureau of Radiation Protection, Department of Environmental Protection R. McLean, Power Plant and Environmental Review Division (MD)
G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)
Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams E. Epstein, TMI Alert R. Fletcher, Department of Environment, Radiological Health Program Distribution w/encl:
S. Collins, RA M. Dapas, DRA M. Gray, DRP C. Khan, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Lubinski, NRR M. Kowal, NRR R. Ennis, NRR H. Chernoff, NRR Region I Docket Room RidsNrrDirsIpab@nrc.gov Institute of Nuclear Power Operations (INPO)
DOCUMENT NAME: S:\\ROP-7 EOC Review\\2006 ROP-7 Annual Assessment Letters\\PDF Merged files\\2006 EOC Peach Bottom Assessment Letter.wpd SUNSI Review Complete: MKG (Reviewer's Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N
RI/DRP NAME RFuhrmeister MGray DATE 02/28 /07 03/01/07 OFFICIAL RECORD COPY