MONTHYEARML25031A0592025-01-31031 January 2025 Annual Commitment Revision Report for the Period 01/01/24 Through 12/31/24 ML25024A1482025-01-24024 January 2025 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-25-001, Subsequent License Renewal Environmental Review, Response to NRC Requests for Confirmation of Information (Rcis) and Request for Additional Information (RAI)2025-01-21021 January 2025 Subsequent License Renewal Environmental Review, Response to NRC Requests for Confirmation of Information (Rcis) and Request for Additional Information (RAI) ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums ML25013A0642025-01-13013 January 2025 Requalification Program Inspection ML25010A1502025-01-10010 January 2025 Notification of Commercial Grade Dedication Inspection (05000277/2025011 and 05000278/2025011) and Request for Information IR 05000171/20230012025-01-0707 January 2025 Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station Unit 1 - NRC Inspection Report No. 05000171/2023001 ML25006A0942025-01-0606 January 2025 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24324A3312024-12-23023 December 2024 Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018) (Ltr) ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24317A2472024-12-16016 December 2024 Environmental Assessment and Finding of No Significant Impact Related to Exemption from the Requirements of 10 CFR Part 50 (Letter) ML24344A1102024-12-13013 December 2024 Suppl Env Audit Summary Letter ML24347A0122024-12-12012 December 2024 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24331A2792024-11-26026 November 2024 Supplement to Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition - Revise LaSalle, Units 1 and 2 Technical Specificati ML24327A1642024-11-22022 November 2024 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Peach Bottom SLR and Concurrence with Not Likely to Adversely Affect Finding for Northern long-eared and Tricolored Bats ML24327A1652024-11-22022 November 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Peach Bottom SLR ML24319A0752024-11-14014 November 2024 Additional Information Report for the Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Environmental Review ML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations 2025-01-07
[Table view] |
Text
Christopher D. Wilson Director, License Renewal Constellation Energy Generation, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
RESPONSE TO REQUEST FOR RE-ENGAGEMENT REGARDING THE SUBSEQUENT LICENSE RENEWAL ENVIRONMENTAL REVIEW FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (DOCKET NUMBERS:
50-0277 AND 50-0278)
Dear Christopher D. Wilson:
The U.S. Nuclear Regulatory Commission (NRC) staff is in receipt of your letter dated June 5, 2024, regarding the subsequent license renewal (SLR) of Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom) (Agencywide Documents Access and Management System (ADAMS) ML24157A069). Constellation Energy Generation, LLC (CEG) requests that the NRC staff provide a plan for completing the environmental review for Peach Bottom and for restoring the end dates for the subsequent renewed licenses. The purpose of this letter is to provide you with information on the NRC staffs plan for completing the required regulatory activities associated with this action.
As noted in your letter, the Commission on May 16, 2024, approved the final rule, SECY 0017 - Final Rule: Renewing Nuclear Power Plant Operating Licenses-Environmental Review, which includes updates to Table B-1, Summary of Findings on NEPA [National Environmental Policy Act] Issues for License Renewal of Nuclear Power Plants, in Appendix B, Environmental Effect of Renewing the Operating License of a Nuclear Power Plant, to Part 51, Subpart A, National Environmental Policy Act-Regulations Implementing Section 102(2) (ML24137A213).
The updates to Table B-1 are supported by the revised NUREG-1437, Revision 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (LR GEIS). The NRC published the final rule, revised LR GEIS, and associated guidance on August 6, 2024; the rule will become effective 30 days following publication in the Federal Register. Compliance by license renewal applicants is not required until 1 year from the date of publication. However, the NRC staff must now consider and analyze the additional environmental issues and any new and significant information associated with subsequent license renewal resulting from issuance of the 2024 LR GEIS and final rule.
In order to complete the environmental review for subsequent license renewal of Peach Bottom, the NRC staff must prepare and issue for public comment a draft supplement to the January 2020 final supplemental environmental impact statement (SEIS) (NUREG-1437, Supplement September 6, 2024
C. Wilson 10, Second Renewal) (ML20023A937) in accordance with 10 CFR 51.92. The NRC staff will also prepare and publish in the Federal Register a notice of intent to prepare the supplement in accordance with 10 CFR 51.26(d). The NRC staff will consider any comments received on the draft supplement, which will be followed by the issuance of a final supplement, which will incorporate any changes made to the draft supplement. Completion of this process would culminate in the issuance of an amended record of decision regarding CEGs application for subsequent renewed licenses for Peach Bottom Units 2 and 3.
Consistent with 10 CFR 51.92, the staffs updated environmental review will focus on new and significant circumstances or information including new and revised environmental issues contained in the final rule and revised LR GEIS. The staff must specifically consider any new and significant information with respect to generic (i.e., Category 1) environmental issues. The staff will also request updated information from CEG to include any new and potentially significant information relevant to the previously submitted environmental report (ML18201A219) and the NRC staffs January 2020 final SEIS. Further, the staff will update interagency consultations, such as consultations regarding Section 7 of the Endangered Species Act.
The NRC staff agrees that an environmental audit would assist the staff in evaluating new and potentially significant information and otherwise facilitate completion of the staffs environmental review for Peach Bottom SLR. As part of the audit process, the staff will be seeking any new and updated information regarding operational aspects of ongoing and continued nuclear plant operations and any refurbishment. This would include, but would not necessarily be limited to, changes to land use, air pollutant emissions and sources including greenhouse gas emissions, surface water and groundwater usage, cooling system operations and configuration, the presence of any Federally protected ecological resources, the presence of historic or cultural resources, plant employment and outage employment, environmental justice, socioeconomic impacts, non-radiological and radiological effluents, occupational and public doses, onsite waste management activities and disposal, environmental monitoring programs, status of compliance (i.e., Federal, State, and local permits and related authorizations), cumulative effects, and reasonably foreseeable future actions that may be undertaken during the subsequent license renewal term. CEG has the option, at any time, to supplement its environmental report with updated information, including any new and significant information of which it is aware (see 10 CFR 51.53(c)(3)(iv)).
C. Wilson The NRC staff is developing a detailed schedule to complete the referenced activities. We anticipate restart of the environmental review in October 2024 to align with ongoing license renewal environmental reviews and related work. The estimated resources to complete the environmental review will depend on the amount of new and significant information, therefore the staff will provide the resource estimates after the audit.
Kevin Folk and Karen Loomis are the assigned environmental project managers for Peach Bottom. Kevin can be reached via email at kevin.folk@nrc.gov or by phone at 301-415-6944 and Karen can be reached via email at karen.loomis@nrc.gov or by phone at 301-415-5142.
The NRC staff will provide status updates concerning its review on the NRC website at https://www.nrc.gov/reactors/operating/licensing/renewal/applications/peach-bottom-subsequent.html.
Sincerely, Michele Sampson, Director Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-0277 and 50-0278 cc: Listserv Signed by Sampson, Michele on 09/06/24