|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
Christopher D. Wilson Director, License Renewal Constellation Energy Generation, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
RESPONSE TO REQUEST FOR RE-ENGAGEMENT REGARDING THE SUBSEQUENT LICENSE RENEWAL ENVIRONMENTAL REVIEW FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (DOCKET NUMBERS:
50-0277 AND 50-0278)
Dear Christopher D. Wilson:
The U.S. Nuclear Regulatory Commission (NRC) staff is in receipt of your letter dated June 5, 2024, regarding the subsequent license renewal (SLR) of Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom) (Agencywide Documents Access and Management System (ADAMS) ML24157A069). Constellation Energy Generation, LLC (CEG) requests that the NRC staff provide a plan for completing the environmental review for Peach Bottom and for restoring the end dates for the subsequent renewed licenses. The purpose of this letter is to provide you with information on the NRC staffs plan for completing the required regulatory activities associated with this action.
As noted in your letter, the Commission on May 16, 2024, approved the final rule, SECY 0017 - Final Rule: Renewing Nuclear Power Plant Operating Licenses-Environmental Review, which includes updates to Table B-1, Summary of Findings on NEPA [National Environmental Policy Act] Issues for License Renewal of Nuclear Power Plants, in Appendix B, Environmental Effect of Renewing the Operating License of a Nuclear Power Plant, to Part 51, Subpart A, National Environmental Policy Act-Regulations Implementing Section 102(2) ( ML24137A213).
The updates to Table B-1 are supported by the revised NUREG-1437, Revision 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (LR GEIS). The NRC published the final rule, revised LR GEIS, and associated guidance on August 6, 2024; the rule will become effective 30 days following publication in the Federal Register. Compliance by license renewal applicants is not required until 1 year from the date of publication. However, the NRC staff must now consider and analyze the additional environmental issues and any new and significant information associated with subsequent license renewal resulting from issuance of the 2024 LR GEIS and final rule.
In order to complete the environmental review for subsequent license renewal of Peach Bottom, the NRC staff must prepare and issue for public comment a draft supplement to the January 2020 final supplemental environmental impact statement (SEIS) (NUREG-1437, Supplement September 6, 2024 C. Wilson
10, Second Renewal) (ML20023A937) in accordance with 10 CFR 51.92. The NRC staff will also prepare and publish in the Federal Register a notice of intent to prepare the supplement in accordance with 10 CFR 51.26(d). The NRC staff will consider any comments received on the draft supplement, which will be followed by the issuance of a final supplement, which will incorporate any changes made to the draft supplement. Completion of this process would culminate in the issuance of an amended record of decision regarding CEGs application for subsequent renewed licenses for Peach Bottom Units 2 and 3.
Consistent with 10 CFR 51.92, the staffs updated environmental review will focus on new and significant circumstances or information including new and revised environmental issues contained in the final rule and revised LR GEIS. The staff must specifically consider any new and significant information with respect to generic (i.e., Category 1) environmental issues. The staff will also request updated information from CEG to include any new and potentially significant information relevant to the previously submitted environmental report (ML18201A219) and the NRC staffs January 2020 final SEIS. Further, the staff will update interagency consultations, such as consultations regarding Section 7 of the Endangered Species Act.
The NRC staff agrees that an environmental audit would assist the staff in evaluating new and potentially significant information and otherwise facilitate completion of the staffs environmental review for Peach Bottom SLR. As part of the audit process, the staff will be seeking any new and updated information regarding operational aspects of ongoing and continued nuclear plant operations and any refurbishment. This would include, but would not necessarily be limited to, changes to land use, air pollutant emissions and sources including greenhouse gas emissions, surface water and groundwater usage, cooling system operations and configuration, the presence of any Federally protected ecological resources, the presence of historic or cultural resources, plant employment and outage employment, environmental justice, socioeconomic impacts, non-radiological and radiological effluents, occupational and public doses, onsite waste management activities and disposal, environmental monitoring programs, status of compliance (i.e., Federal, State, and local permits and related authorizations), cumulative effects, and reasonably foreseeable future actions that may be undertaken during the subsequent license renewal term. CEG has the option, at any time, to supplement its environmental report with updated information, including any new and significant information of which it is aware (see 10 CFR 51.53(c)(3)(iv)).
The NRC staff is developing a detailed schedule to complete the referenced activities. We anticipate restart of the environmental review in October 2024 to align with ongoing license renewal environmental reviews and related work. The estimated resources to complete the environmental review will depend on the amount of new and significant information, therefore the staff will provide the resource estimates after the audit.
Kevin Folk and Karen Loomis are the assigned environmental project managers for Peach Bottom. Kevin can be reached via email at kevin.folk@nrc.gov or by phone at 301-415-6944 and Karen can be reached via email at karen.loomis@nrc.gov or by phone at 301-415-5142.
The NRC staff will provide status updates concerning its review on the NRC website at https://www.nrc.gov/reactors/operating/licensing/renewal/applications/peach-bottom-subsequent.html.
Sincerely, Michele Sampson, Director Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-0277 and 50-0278 cc: Listserv Signed by Sampson, Michele on 09/06/24
ML24221A250 (Letter) *via email OFFICE PM:REFS/EPMB1 LA:REFS OGC BC:REFS/EPMB1 NRR DIR/NRR/DNRL NAME KFolk AWalker-Smith *STurkin SKoenick LGibson MSampson DATE 08/08/2024 9/5/2024 09/05/2024 9/6/20249/620249/6/2024