Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:License-Operator
MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22206A2692022-05-11011 May 2022 Final Operating Test ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) 2024-04-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22206A2692022-05-11011 May 2022 Final Operating Test ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations 2024-04-11
[Table view] |
Text
October 7, 2024
David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS
Dear David Rhoades:
In a telephone conversation on September 5, 2024, between C. Lally, Chief Examiner, and D. Adams, Facility Exam Author and other members of your staff, arrangements were made for the administration of licensing examinations at Peach Bottom Atomic Power Station, Units 2 and 3, during the week of May 19, 2025. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of April 21, 2025.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG -1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
The NRC staff has provided the written examination outline. The written examinations, operating tests, and supporting reference materials identified in NUREG -1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 5, 2025.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or s afeguards information in your response be contained in a separate enclosure and appropriately marked. D elays in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests," your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
D. Rhoades 2
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact C. Lally, Chief Examiner, to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement Licensee, or as directed by C. Lally when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by email to Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn:
Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC, 20503; e mail: oira_ submission@omb.eop.gov.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible on the NRCs web site at http://www.nrc.gov/reading-rm/adams.html.
D. Rhoades 3
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one-month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. D. Adams has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact C. Lally at (610) 337-5124 or me at (610) 337-5306.
Sincerely,
Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety
Docket Nos. 50-277 and 50-278 License Nos.DPR-44 and DPR-56
cc: Distribution via ListServ
D. Rhoades 4
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DATED OCTOBER 7, 2024
DISTRIBUTION:
CLally, DORS JKepley, DORS DJackson, DORS LPinkham, DORS SElkhiamy, DORS JSchussler, DORS SFlanagan, DORS BFord, DORS SRutenkroger, DORS, SRI CDukehart, DORS, RI SSchmitt, DORS, AA RRuiz, RI OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1 Resource
DOCUMENT NAME: G:\\DRS\\Operations Branch\\ Lally\\Exam FY25-Peach Bottom 19 May 2025\\Admin\\ PB FY25 Exam-CorpNotifyLtr.docx ADAMS Accession No. ML24277A269 (Package) ADAMS Accession No: ML24281A101 (Letter)
SUNSI Review N-Sensitive bliy Available
Sensitive N-Publiclyvlae
OFFICE RI/DO RS/OB :CE RI/DO RS/OB :BC N CLally/L DEJan/ J TE 10/ 10/
OFFIAL RERD CO PY