September 11, 2023 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Office Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3 - SECURITY BASELINE INSPECTION REPORT 05000277/2023420 AND 05000278/2023420

Dear David P. Rhoades:

On August 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 & 3 and discussed the results of this inspection with Mr. Ryan Stiltner and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Clark, Jefferson on 09/11/23 Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56

Enclosure:

As stated cc w/ encl: Ray Moye Jr., Manager, Site Security Ray.Moye@constellation.com

D. Rhoads 2

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3 -

SECURITY BASELINE INSPECTION REPORT 05000277/2023420 AND 05000278/2023420 DATED: September 11, 2023 DISTRIBUTION:

PUBLIC DSchroeder, RI JWorosilo, RII SOrth, RIII RKellar, RIV DDavis, NSIR DJohnson, NSIR JRey, NSIR EWharton, NSIR FSullivan, NSIR JBerry, NSIR DOCUMENT NAME: Peach Bottom Atomic Power Station, Units 2 & 3 - Security Baseline Inspection Report 05000277-2023420 and 05000278-2023420.pdf Public Designation Category: SUNSI Review Complete ADAMS ACCESSION NO.: ML23251A202 SUNSI X Non-Sensitive X Publicly Available X

Review Sensitive Non-Publicly Available OFFICE NSIR RI NSIR NSIR NAME PNegrete MOrdoyne DBradfield JClark DATE 08/24/23 08/28/23 09/11/23 09/11/23 OFFICIAL RECORD COPY

U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers: 05000277 and 05000278 License Numbers: DPR-44 and DPR-56 Report Numbers: 05000277/2023420 and 05000278/2023420 Enterprise Identifier: I-2023-420-0011 Licensee: Constellation Nuclear Facility: Peach Bottom Atomic Power Station, Units 2 & 3 Location: Delta, PA Inspection Dates: July 24, 2023, to August 18, 2023 Inspectors: D. Bradfield, Team Leader, NSIR T. Eck, Physical Security Inspector, RI P. Negrete, Physical Security Inspector, NSIR M. Ordoyne, Physical Security Inspector, RI Approved By: Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Peach Bottom Atomic Power Station, Units 2 & 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

2

INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS 71130.03 - Contingency Response - Force-On-Force Testing Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126043.

INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On August 24, 2023, the inspectors presented the security baseline inspection results to Mr. Ryan Stiltner and other members of the licensee staff.

3

DOCUMENTS REVIEWED Inspection Type Designation Description or Title Revision or Date Procedure 71130.03 Corrective Action IR 4693251, AR Various Various Documents 04692549, AR Resulting from 04696957, AR Inspection 04697043, AR 04697061, 71130.03 Procedures N/A Peach Bottom Atomic Power Station Protective Strategy Brief 71130.03 Procedures SY-AA-500-126 DUTIES AND RESPONSIBILITIES OF THE Revision 21 NUCLEAR SECURITY ORGANIZATION PURPOSE 71130.03 Procedures SY502 PEACH BOTTOM ATOMIC POWER STATION SECURITY Revision 8 TARGET SET ANALYSIS AND DEVELOPMENT 71130.03 Procedures Peach Bottom Revision 2 Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

71130.03 Procedures SITE PROTECTIVE SY-PB-101-501 Revision 11 STRATEGY 71130.03 Procedures SY-AA-101-109 Response to Contingency Events Revision 16 71130.03 Procedures SY-AA-150-101-F- Use of Force Continuum (Laws Governing Arrest, Search and Revision 0 48 Seizure) 71130.03 Procedures SY-PB-101-500 Peach Bottom Atomic Power Station Security Plan Support Revision 2 Procedure 71130.03 Procedures SY-PB-101-501 Site Protective Strategy Revision 11 4