ML23019A075

From kanterella
Jump to navigation Jump to search
Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011
ML23019A075
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/19/2023
From: Mel Gray
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023-011
Download: ML23019A075 (1)


See also: IR 05000277/2023011

Text

January 19, 2023

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

INFORMATION REQUEST FOR QUADRENNIAL BASELINE

COMPREHENSIVE ENGINEERING TEAM INSPECTION; NOTIFICATION TO

PERFORM INSPECTION 05000277/2023011 AND 05000278/2023011

Dear David Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a Comprehensive Engineering Team Inspection (CETI) at your Peach

Bottom Atomic Power Station, Units 2 and 3. Kevin Mangan, a Senior Reactor Inspector from

the NRCs Region I office, will lead the inspection team. The inspection will be conducted in

accordance with Inspection Procedure (IP) 71111.21M, Comprehensive Engineering Team

Inspection (CETI), dated January 1, 2023 (ADAMS Accession No. ML19084A030). This

inspection combines elements of the Design Basis Assurance Inspection (Teams), the Heat

Exchanger/Sink Performance inspection (IP 71111.07T), and the Evaluations of Changes, Tests

and Experiments inspection (IP 71111.17).

The inspection will evaluate the capability of risk-significant/low-margin components to function

as designed to support proper system operation. The inspection will also include a review of

selected modifications, operating experience, and as applicable, operator actions.

During a telephone conversation on January 17, 2023, with Amy Huber, Peach Bottom

Regulatory Compliance, we confirmed arrangements for an information-gathering site visit and

the two-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of February 20, 2023
  • Onsite weeks: Weeks of April 10 and April 24, 2023

D. Rhoades 2

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components, modifications, operator actions, and operating experience items.

Information and documentation needed to support the inspection will also be identified.

David Werkheiser, a Region I Senior Risk Analyst, will support Kevin Mangan during the

information-gathering visit to review probabilistic risk assessment data and identify components

to be examined during the inspection.

Experience with previous baseline design/modification inspections of similar depth and length

has shown this type of inspection is resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into two groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector by February 20, 2023. By

March 1, 2023, the lead inspector will communicate the initial selected set of

components, modifications, 50.59 screenings, and operating experience samples.

  • The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, specific to the selected components

and modifications, should be provided to the lead inspector at the Regional Office no

later than April 2, 2023. During the in-office preparation activities, the team may identify

additional information needed to support the inspection, and those items will be

communicated directly to Amy Huber.

If there are any questions about the inspection or the material requested in the enclosure,

please contact the lead inspector at (610) 337-5234 or via email at kevin.mangan@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

D. Rhoades 3

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Digitally signed by Melvin K.

Melvin K. Gray Gray Date: 2023.01.19 11:17:54

-05'00'

Mel Gray, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278

License Nos. DPR-44 and DPR-56

Enclosure:

Document Request for Comprehensive

Engineering Team Inspection

cc w/encl: Distribution via ListServ

ML23019A075

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DORS RI/DORS RI/DORS

NAME KMangan DWerkheiser MGray

DATE 1/19/23 1/19/23 1/19/23

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

Onsite Inspection Dates: April 10, 2023 through April 14, 2023; and

April 14, 2023 through April 18, 2023

Inspection Procedure: Inspection Procedure 71111.21M, Comprehensive Engineering

Team Inspection (CETI)

Lead Inspector: Kevin Mangan, Senior Reactor Inspector

(610) 337-5234

kevin.mangan@nrc.gov

Inspection Report: 05000277/2023011 and 05000278/2023011

I. Information Requested for Sample Selection Process

The following information is requested by February 20, 2023, to facilitate inspection

preparation. Feel free to contact the lead inspector as soon as possible if you have any

questions regarding this information request. Please provide the information electronically in

pdf files, Word, Excel, or other searchable format. The files should contain descriptive

names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should

contain enough information to be easily understood by someone who has knowledge of light

water reactor technology.

1. The site probabilistic risk analysis (PRA) System Notebook and latest PRA Summary

Document.

2. Risk-ranking of top 250 basic events sorted by Risk Achievement Worth (>/= 1.3).

Include values for Risk Reduction Worth, Birnbaum Importance, and Fussell-Vesely (as

applicable). Please provide in an excel spreadsheet or other sortable format, and

include an understandable definition of the coded basic events.

3. Risk-ranking of top 100 components from site specific PRA sorted by Large Early

Release Frequency. Provide any basic event mapping used to develop the ranking of

components.

4. List of the top 200 cut-sets from your PRA. Provide the descriptions of the basic events

in the list of cut-sets.

5. List of the top 200 cut-sets for each initiator modeled in the PRA that contributes more

than 5 percent to the baseline plant core damage frequency.

6. If you have an External Events or Fire PRA Model, provide the information requested in

Items 1 and 2 for external events and fire. Provide narrative description of each coded

event, including fire and flood zone description.

7. List of time-critical and/or risk-significant operator actions.

8. List of emergency and abnormal operating procedures.

Enclosure

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

9. If available, any pre-existing evaluation or list of components and associated

calculations with low design margins (e.g., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal).

10. If applicable, copy of any self-assessments and/or Quality Assurance assessments of

low-margin structures, systems, and components (SSC), completed in the last 3 years.

11. List of available design margins in both the open and closed direction for valves in the

motor-operated valve and air-operated valve programs. Identify the safety-related

direction and the basis for how the margin was determined.

12. The age and capacity of the safety-related DC batteries.

13. The In-Service Testing Program (IST) Basis document identifying the in-scope valves

and pumps, and the associated IST Program requirements for each component (e.g.,

IST valve table identifying category, active/passive function).

14. SSCs in the Maintenance Rule (a)(1) category in the last 3 years.

15. List of Root Cause Evaluations associated with SSCs failures or design issues

initiated/completed in the last 4 years.

16. List of operability evaluations in the last 4 years.

17. List of current operator work arounds/burdens.

18. List of permanent plant modifications to SSCs that are field work complete in the last 3

years. For the purpose of this inspection, permanent plant modifications include

permanent: plant changes, design changes, set point changes, equivalency

evaluations, suitability analyses, and commercial grade dedications. The list should

contain the number of each document, title (sufficient to understand the purpose of the

modification), revision/date, and the affected system.

19. List of calculation changes that have been issued for use in the last 3 years.

20. Programmatic procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, and post-modification testing.

21. List of corrective action documents (open and closed) in the last 3 years that address

permanent plant modifications issues, concerns, or processes.

22. Any internal/external self-assessments and associated corrective action documents

generated in preparation for this inspection.

23. Corrective Action Program documents (e.g., condition reports) associated with

inspection findings from the previous NRC Inspection Procedure 71111.21 (or 71111.21

Attachment M inspection).

2

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

24. One line safety-related electrical drawings (AC and DC), and Piping and

Instrumentation Drawings of emergency core cooling systems, ultimate heat sink, and

auxiliary feedwater system.

25. List of 50.59 Evaluations and Screenings performed since February 2022.

II. Information Requested to Be Available by April 2, 2023

This information should be separated for each selected component and modification,

especially if provided electronically (e.g., a folder for each component and modification

named after the component or modification that includes the information requested below).

Items 1 through 11 are associated with the selected components and Items 12 and 13 are

for the selected modifications.

1. List of corrective action documents associated with each selected component for the

last 4 years.

2. Maintenance history (e.g., corrective, preventive, and elective) associated with each

selected component for the last 6 years. Identify frequency of preventive maintenance

activities.

3. Aging Management Program documents applicable to each selected component.

4. List of calculations associated with each selected component, excluding data files. Pipe

stress calculations are excluded from this request.

5. System Health Report (last completed) and Design Basis Document associated with

each selected component.

6. Access to or copy of vendor manual(s) for each selected component.

7. List of open temporary modifications associated with each selected component, if

applicable.

8. Trend data/graphs on the selected components performance for the last 3 years (e.g.,

pump performance including IST, other vibration monitoring, oil sample results).

9. List of normal operating and alarm response procedures associated with each selected

component.

10. Last completed tests and surveillances for each selected component performed during

the last 3 years. For those tests and surveillances performed at a periodicity of greater

than three years, provide the latest test performed.

11. Schedule of surveillance testing of selected components that occur during the onsite

inspection weeks.

3

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

12. For each selected modification, copies of associated documents such as modification

package, engineering changes, 50.59 screening or evaluation, relevant calculations,

post-modification test packages, associated corrective action documents, design

drawings, and new/revised preventive maintenance requirements.

13. A copy of the evaluation or screening document for each of the selected 50.59

evaluation/screens. A copy of the modification package if the evaluation/screen pertains

to a modification.

4