IR 05000277/2022402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000277/2022402 and 05000278/2022402 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2022401 (Cover Letter Only)
ML22166A034
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/15/2022
From: Daniel Schroeder
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Schroeder D
References
IR 2022402
Download: ML22166A034 (3)


Text

June 15, 2022

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000277/2022402 AND 05000278/2022402 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200029/2022401

Dear Mr. Rhoades:

On May 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 and 3, and discussed the results of this inspection with Mr. David Henry, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

Two violations are documented in this report. One finding of very low security significance (Green) and one Severity Level IV violation. These findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest these violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Peach Bottom Atomic Power Station.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: [H.11] - Challenge the Unknown.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Peach Bottom Atomic Power Station.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000277, 05000278, and 07200029 License Nos. DPR-44 and DPR-56

Enclosure:

As stated

cc w/o encl: Distribution via LISTSERV

cc w/encl:

D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection S. Griffith, Manager, Site Security S. Overly, Manager, Site Security Operations

Daniel L.

Schroeder Digitally signed by Daniel L.

Schroeder Date: 2022.06.15 09:15:45-04'00'

ML22166A027 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML22166A034 (Cover letter)

Entire Report:

X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available Cover Letter Only:

X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS RI/DORS RI/DORS RI/DRSS NAME DCaron MOrdoyne KHussar GStock JGreives ADimitriadis DATE 5/31/22 6/1/22 6/1/22 6/2/22 6/1/22 6/9/22 OFFICE RI/DRSS

NAME DSchroeder

DATE 6/13/22