Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005)
ML22242A023
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/31/2022
From: Jon Greives
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Greives J
References
IR 2022005
Download: ML22242A023 (6)


Text

August 31, 2022

SUBJECT:

UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2022005 AND 05000278/2022005)

Dear David Rhoades:

The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Peach Bottom Atomic Power Station, Units 2 and 3. The U.S. Nuclear Regulatory Commission (NRC)

provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2.

In response to the COVID19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE

Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.

The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.3 For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In addition to baseline inspections, the NRC will conduct Inspection Procedure 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection, for Units 2 and 3 in January and February 2023.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5337 with any questions you have regarding this letter.

Sincerely, Digitally signed by Jonathan E.

Jonathan E. Greives Date: 2022.08.31 08:38:57 Greives -04'00'

Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56 Enclosure:

Peach Bottom Inspection Plan cc w/encl: Distribution via ListServ

This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.

ML22242A023 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME LCasey JGreives DATE 8/29/22 8/29/22

Site Inspection Activity Plan Peach Bottom 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count RETS (71124.06) 1 2,3 7/18/2022 7/22/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Material Control and Accountability - Peach Bottom Units 2 and 3 1 2,3 9/12/2022 9/16/2022 IP 71130.11 000742 Material Control and Accounting (MC&A)

Triennial Heat Sink - Peach Bottom Units 2 and 3 1 2,3 9/19/2022 9/23/2022 IP 71111.07T 000700 Heat Exchanger/Sink Performance Inservice Inspection - Peach Bottom Unit 2 1 2 10/24/2022 10/28/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Rad Hazards (71124.01) and PIs (71151) 1 2,3 10/24/2022 10/28/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 10 CFR 50.69 - Risk Informed SSC Implementation - Peach Bottom 4 2,3 1/23/2023 1/27/2023 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 2,3 2/6/2023 2/10/2023 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection EP PROGRAM INSPECTION - PEACH BOTTOM 1 2,3 2/27/2023 3/3/2023 IP 71114.02 000717 Alert and Notification System Testing 2,3 2/27/2023 3/3/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 2/27/2023 3/3/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 2/27/2023 3/3/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 2/27/2023 3/3/2023 IP 71151 001397 Performance Indicator Verification PB Requal Inspection with P/F Results 2 2,3 3/5/2023 3/10/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2,3 3/5/2023 3/10/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance AA, FFD-PB 2 2,3 3/6/2023 3/10/2023 IP 71130.01 000733 Access Authorization 2,3 3/6/2023 3/10/2023 IP 71130.08 000740 Fitness For Duty Program Comprehensive Engineering Team Inspection - Peach Bottom Unit 2 and 3 7 2,3 4/10/2023 4/28/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

HP Instrumentation (71124.05) 1 2,3 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation FY23 Peach Bottom Initial License Exam 4 Prepared on 8/23/2022 11:04:10 AM 1 of 3 Enclosure

Site Inspection Activity Plan 2,3 4/30/2023 5/5/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 5/28/2023 6/9/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

ISFSI Loading Inspection (60855) - PB 2 2,3 6/26/2023 6/30/2023 IP 60855 001001 Operation Of An ISFSI PI&R Biennial Team Inspection - PB 4 2,3 7/17/2023 7/21/2023 IP 71152B 000747 Problem Identification and Resolution 2,3 7/31/2023 8/4/2023 IP 71152B 000747 Problem Identification and Resolution HP Rad Waste (71124.08) 1 2,3 7/24/2023 7/28/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE - PB 4 2,3 7/24/2023 7/28/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2,3 8/14/2023 8/18/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing HP REMP (71124.07) 1 2,3 9/18/2023 9/22/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program Inservice Inspection - PB 3R24 1 3 10/23/2023 10/27/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

HP Rad Hazards (71124.01) and PIs (71151) 1 2,3 10/30/2023 11/3/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Equipment, Sec Trng, Sec Plan Review, PI, ISFSI-PB 3 2,3 12/11/2023 12/15/2023 IP 71130.02 000734 Access Control 2,3 12/11/2023 12/15/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 12/11/2023 12/15/2023 IP 71130.07 000739 Security Training 2,3 12/11/2023 12/15/2023 IP 71130.09 001656 Security Plan Changes 2,3 12/11/2023 12/15/2023 IP 71151 001338 Performance Indicator Verification 2,3 12/11/2023 12/15/2023 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Cyber Security - Peach Bottom 4 2,3 2/5/2024 2/9/2024 IP 71130.10 000741 Cybersecurity FY24 Peach Bottom Initial License Examination 5 2,3 3/25/2024 3/29/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 4/22/2024 4/26/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP - 71124.03 Airborne, 71124.04 Dose Assessment 1 2,3 4/8/2024 4/12/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 4/8/2024 4/12/2024 IP 71124.04 000728 Occupational Dose Assessment EP Exercise Inspection - Peach Bottom 5 2,3 4/15/2024 4/19/2024 IP 71114.01 000716 Exercise Evaluation Prepared on 8/23/2022 11:04:10 AM 2 of 3

Site Inspection Activity Plan 2,3 4/15/2024 4/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 4/15/2024 4/19/2024 IP 71151 001397 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR 3 2,3 5/13/2024 5/17/2024 IP 71130.02 000734 Access Control 2,3 5/13/2024 5/17/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 5/13/2024 5/17/2024 IP 71130.07 000739 Security Training 2,3 5/13/2024 5/17/2024 IP 71130.09 001656 Security Plan Changes 2,3 5/13/2024 5/17/2024 IP 71151 001338 Performance Indicator Verification Prepared on 8/23/2022 11:04:10 AM 3 of 3