IR 05000277/2023006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006)
ML24057A059
Person / Time
Site:  Constellation icon.png
Issue date: 02/28/2024
From: Blake Welling
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023006
Download: ML24057A059 (1)


Text

February 28, 2024

David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORTS 05000277/2023 006 AND 05000278/2023 006)

Dear David Rhoades:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Peach Bottom, Units 2 and 3, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e.,

Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Note that Peach Bottom, Unit 2 started the assessment period in Column 2 and returned to the Licensee Response Column on June 8, 2023 following a supplemental inspection documented in NRC Inspection Report 05000277/2023 040 (ADAMS Accession No. ML23198A050).

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room).

Please contact Jonathan Greives at (610) 337- 5337 with any questions you have regarding this letter.

Sincerely, Blake D. Welling,Director Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278 License Nos. DPR- 44 and DPR-56

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORTS 05000277/2023006 AND 05000278/2023006) DATED FEBRUARY 28, 20 24

DISTRIBUTION:

JGreives, DORS SHaney, DORS ANugent, DORS SRutenkroger, DORS, SRI SSchmitt, DORS, AA FGaskins, RI OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1 Resource RLorson, RA DCollins, DRA BWelling, DORS RMckinley DORS PKrohn, DRSS JZimmerman, DRSS DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDro lrab Resource ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 4/Peach Bottom/Peach Bottom ROP-24 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER: ML24057A059 x SUNSI Review x Non-Sensitive x Publvlle Sensitive n -Publiclyvlable

OFFICE / / /

ME SH JGrv BWli TE 4 22/2024 26/2024

OFFIAL RERD COPY

Site Inspection Activity Plan Peach Bottom

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Cyber Security - Peach Bottom 4

2,3 2/5/2024 2/9/2024 IP 71130.10 000741 Cybersecurity

FY24 Peach Bottom Initial License Examination 5

2,3 3/24/2024 3/29/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 4/22/2024 4/26/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP - 71124.03 Airborne, 71124.04 Dose Assessment 1

2,3 4/8/2024 4/12/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2,3 4/8/2024 4/12/2024 IP 71124.04 000728 Occupational Dose Assessment

EP Exercise Inspection - Peach Bottom 5

2,3 4/15/2024 4/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2,3 4/15/2024 4/19/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event

2,3 4/15/2024 4/19/2024 IP 71151 001397 Performance Indicator Verification

Fire Protection - Peach Bottom 3

2,3 7/22/2024 7/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

2,3 8/5/2024 8/9/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Access Control, Equipment Testing and Maintenance, Training, SPR 3

2,3 9/23/2024 9/27/2024 IP 71130.02 000734 Access Control

2,3 9/23/2024 9/27/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

2,3 9/23/2024 9/27/2024 IP 71130.07 000739 Security Training

2,3 9/23/2024 9/27/2024 IP 71130.09 001656 Security Plan Changes

2,3 9/23/2024 9/27/2024 IP 71151 001338 Performance Indicator Verification

RP - 71124.01 Rad Haz and 71151 PI Verification 1

2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification

Inservice Inspection - Peach Bottom Unit 2 1

2 10/28/2024 11/1/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Material Control and Accounting - Peach Bottom 1

2,3 2/3/2025 2/7/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection - Peach Bottom 2

2,3 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing

2,3 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2,3 2/24/2025 2/28/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2,3 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

Prepared on 1/24/2024 7:05:24 AM 1 of 2 Site Inspection Activity Plan

2,3 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification

PB Requal Inspection with P/F Results 1

2,3 3/24/2025 3/28/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2,3 3/24/2025 3/28/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

RP - 71124.06 RETS 1

2,3 4/7/2025 4/11/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

Commercial Grade Dedication - Peach Bottom 3

2,3 4/14/2025 4/18/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

2,3 4/28/2025 5/2/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

RP - 71124.05 Rad. Instruments 1

2,3 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

2025 Peach Bottom Initial Operator Licensing Exam 4

2,3 4/14/2025 4/18/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 5/19/2025 5/23/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Access Control, Protective Strategy, TSR, SPR, PIs - PB 4

2,3 5/19/2025 5/23/2025 IP 71130.02 000734 Access Control

2,3 5/19/2025 5/23/2025 IP 71130.05 000737 Protective Strategy Evaluation

2,3 5/19/2025 5/23/2025 IP 71130.09 001656 Security Plan Changes

2,3 5/19/2025 5/23/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

2,3 5/19/2025 5/23/2025 IP 71151 001338 Performance Indicator Verification

PI&R Biennial Team Inspection - Peach Bottom 4

2,3 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution

2,3 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution

RP -71124.08 Rad Waste and Part 37 1

2,3 9/15/2025 9/19/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Inservice Inspection - Peach Bottom Unit 3 1

3 10/27/2025 10/31/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP - 71124.01 Rad. Hazards 1

3 10/27/2025 10/31/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Prepared on 1/24/2024 7:05:24 AM 2 of 2