MONTHYEARML25031A0592025-01-31031 January 2025 Annual Commitment Revision Report for the Period 01/01/24 Through 12/31/24 ML25024A1482025-01-24024 January 2025 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-25-001, Subsequent License Renewal Environmental Review, Response to NRC Requests for Confirmation of Information (Rcis) and Request for Additional Information (RAI)2025-01-21021 January 2025 Subsequent License Renewal Environmental Review, Response to NRC Requests for Confirmation of Information (Rcis) and Request for Additional Information (RAI) ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums ML25013A0642025-01-13013 January 2025 Requalification Program Inspection ML25010A1502025-01-10010 January 2025 Notification of Commercial Grade Dedication Inspection (05000277/2025011 and 05000278/2025011) and Request for Information IR 05000171/20230012025-01-0707 January 2025 Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station Unit 1 - NRC Inspection Report No. 05000171/2023001 ML25006A0942025-01-0606 January 2025 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24324A3312024-12-23023 December 2024 Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018) (Ltr) ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24317A2472024-12-16016 December 2024 Environmental Assessment and Finding of No Significant Impact Related to Exemption from the Requirements of 10 CFR Part 50 (Letter) ML24344A1102024-12-13013 December 2024 Suppl Env Audit Summary Letter ML24347A0122024-12-12012 December 2024 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24331A2792024-11-26026 November 2024 Supplement to Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition - Revise LaSalle, Units 1 and 2 Technical Specificati ML24327A1642024-11-22022 November 2024 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Peach Bottom SLR and Concurrence with Not Likely to Adversely Affect Finding for Northern long-eared and Tricolored Bats ML24327A1652024-11-22022 November 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Peach Bottom SLR ML24319A0752024-11-14014 November 2024 Additional Information Report for the Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Environmental Review ML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations 2025-01-07
[Table view] |
Text
Mark D. Humphrey Senior Manager - Licensing Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 1 - U.S. NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF CONSTELLATION ENERGY GENERATIONS DECOMMISSIONING FUNDING STATUS REPORT (DOCKET NO. 50-171)
Dear Mark Humphrey:
By letter dated March 22, 2024, the U.S. Nuclear Regulatory Commission (NRC) received the decommissioning funding status (DFS) report for the Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom Unit 1) (Agencywide Documents Access and Management System Accession No. ML24082A195), which was submitted by Constellation Energy Generation, LLC (CEG, the licensee).
The NRC has reviewed and analyzed the site-specific decommissioning cost estimates for the facilities, as required by Section 50.82, Termination of license - For power reactor licensees, of Title 10 of the Code of Federal Regulations (10 CFR). The NRC staff also verified the amounts stated within the licensees decommissioning trust funds for Peach Bottom Unit 1 as of December 31, 2023, as well as earnings assumptions. Based on the reported decommissioning trust fund (DTF) balances, the NRC has determined that as of December 31, 2023, the licensee is providing a total amount of radiological decommissioning funding assurance in the amount of
$162,289,000 in 2023 dollars for Peach Bottom Unit 1.
The NRC staff notes that Peach Bottom Unit 1 had a shortfall in decommissioning funding, which was self-identified by the licensee in the March 22, 2024, submittal and confirmed by the NRC staff. In the cash flow analysis used to evaluate the decommissioning of this unit through license termination in 2034, the licensee experiences a shortfall of approximately $7.95 million following radiological decommissioning expenditures of over $249 million.
However, the licensee identified a solution to the Peach Bottom Unit 1 shortfall in the DFS submittal, which states:
Due to recent market performance, Peach Bottom, Unit 1, did not meet the minimum funding assurance criteria under 10 CFR 50.75 and 10 CFR 50.82 as of December 31, 2023, based solely on the trust fund balance. Financial assurance for decommissioning this reactor is provided by the external sinking fund method, coupled with an external trust fund, in accordance with 10 CFR 50.75(e)(1)(ii). The source of revenue for the external sinking fund is a "nonbypassable charge" approved by the August 23, 2024 M. Humphrey Pennsylvania Public Utilities Commission (PaPUC) authorizing PECO Energy Company to continue to collect decommissioning funds for CEG. The amount to be collected will be adjusted, as necessary, in accordance with the applicable tariff in the next submission to the PaPUC of the Nuclear Decommissioning Cost Adjustment (NDCA) to cover any funding shortfall that exists at that time. This cost adjustment is made every five years pursuant to PaPUC Electric Tariff No. 4. The most recent rate adjustment was effective January 1, 2023. CEG's ability to adjust the amount collected for Peach Bottom, Unit 1, is consistent with the guidance in Regulatory Guide 1.159, Assuring Availability of Funds for Decommissioning Nuclear Reactors, Revision 2, Page 13, which provides that, Adjustments to the annual amount of funds being set aside may be made to coincide with rate cases considered by a licensee's public utility commission (PUC).
The NRC staff agrees that the licensees approach is an acceptable means to address the DTF shortfall for Peach Bottom Unit 1. Coupled with its current DTF balance of $162,289,000 (December 31, 2023), reliance on future contributions from the rate setting authority (PaPUC) as stated above to address the DTF shortfall meets the intent of decommissioning funding assurance for utility licensees. Accordingly, no further action is required at this time to address this shortfall.
This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(8)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that the licensee has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82 for Peach Bottom Unit 1 as of December 31, 2023.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC website at https://www.nrc.gov/reading-rm/adams.html.
If you or your staff have any questions regarding the above, please contact me at 301-415-1387 or via email at Tanya.Hood@nrc.gov.
Sincerely, Tanya E. Hood, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-171 License No. DPR-12 cc: Distribution via Listserv Signed by Hood, Tanya on 08/23/24
ML24235A034 OFFICE NMSS/DUWP/PM NMSS/REFS/FAB NMSS/DUWP/BC*
NMSS/DUWP/PM NAME THood SHarwell (Acting)
NWarnek (Acting)
THood DATE 08/21/2024 08/22/2024 08/23/2024 08/23/2024