|
---|
Category:Letter
MONTHYEARML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-06
[Table view] |
Text
OFFICIAT USE ONtY SECURITY RETATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION - NRC TEMPORARY INSTRUCTION 22011004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7,' REPORT O5OOO277 I2O1 3404 AND 05000278/2013404
Dear Mr. Pacilio:
On February 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security temporary instruction inspection at your Peach Bottom Atomic Power Station, Units 2 and 3. The inspection covered the implementation of interim milestones associated with your cyber security program, as outlined in your approved cyber security plan (CSP) and described in Temporary Instruction (Tl) 22011004, "lnspection of lmplementation of Interim Cyber Security Milestones 1-7." The enclosed inspection report documents the inspection results, which were discussed on February 15,2013, with Mr. Michael Massaro, Site Vice President, and other members of your staff. On April 1 ,2013, the NRC conducted an exit meeting by telephone with members of your staff to further discuss the inspection results.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license related to the implementation of interim cyber security milestones. The inspection was conducted in accordance with NRC Tl 22011004, "lnspection of lmplementation of Interim Cyber Security Milestones 1-7." The team reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.
tn accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled.
OFFIGIAT USE ONtY SECURITY RETATED INFORMATION
EFFIEIAT USE ONIY SECURFY RETATED INFORMATION accessible from the NRC Web site at http:/lwww.nrc.qov/readino-rmiadams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(dX1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. lf you choose to provide a response and Security-Related lnformation is necessary to provide an acceptable response, please mark your entire response "security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(dX1) and follow the instructions for withholding in 10 CFR 2.390 (bX1). In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-277;50-278 License Nos. DPR-44: DPR-56 Enclosure:
f nspection Report Nos. 05000277 12013404 and 0500027812013404 MAttachment: Supplemental Information cc Mo encl: Distribution via ListServ cc dencl; w/OUO-SRl or SGI:
J. Kovalchick, Manager, Site Security D. Allard, Director, PA DEP T. Levering, MD Emergency Response Director A. Lauland, Director, MD Office of Homeland Security OFFICIAT USE ONIY SEGURITY RETATED INFORMATION
EFFIEIAT USE ONtY SEEURITY RETATEB INFORMATION accessible from the NRC Web site at http://www.nrc.qov/readino-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(dX1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. lf you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(dX1) and follow the instructions for withholding in 10 CFR 2.390 (bX1). In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor SafetY Docket Nos. 50-277; 50-278 License Nos. DPR-44: DPR-56 Enclosure:
lnspection Report Nos. 05000277 12013404 and 0500027812013404 w/Attachment: Supplemental Information cc Mo encl: Distribution via ListServ cc w/encl; dOUO-SRI or SGI:
J. Kovalchick, Manager, Site Security D. Allard, Director, PA DEP T. Levering, MD Emergency Response Director A. Lauland, Director, MD Otfice of Homeland Security Distribution: See Next Page DOCUMENT NAME: G:\DRS\Engineering Branch 3\Cyber Tl lRs\Peach Bottom Cyber Tl 2013404.docx ADAMS ACCESSION NUMBER: ML13140A276 (Cover letter)
ADAMS ACCESSION NUMBER: ML13140A272 (Cover letter Cover Letter X Non-Sensitive X Publicly Available X SUNSI Review E Sensitive E Non-Publicly Available Cover Letter dEnclosure E Non-Sensitive D Publicly Available X SUNSI Review X Sensitive X Non-Publicly Available OFFICE RI/DRS RUDRS RI/DRP NAME Dorr JRogge/ MGray DATE 05/03/1 3 05/1 5/1 3 05/08/1 3 OFFICIAL RECORD OFFIEIAT USE ONIY SEEURITY RETATEB INFORMATION
OFFICIAT USE ONIY SEEURITY RETATED INFORMATION Distribution w/o encl: (via E-mail)
W. Dean, RA (RIORAMAIL Resource)
D. Lew, DRA (RIORAMAIL Resource)
D. Roberts, DRP (RIDRPMAIL Resource)
M. Layton, DRP (RlDRPMail Resource)
C. Miller, DRS (Rl DRSMail Resource)
J. Clifford, DRS (Rl DRSMail Resource)
M. Gray, DRP S. Barber, DRP A. Turilin. DRP S. Hansell, DRP, SRI A. Ziedonis, DRP, Rl S. Schmitt, DRP, AA D. Huyck, Rl, OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl 1 -2 Resource ROPreports Resource Distribution w/encl: w/OUO-SRI or SGI:
R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, Rll M. King, DRS, Rll R. Daley, DRS, Rlll R. Skokowski, DRS, Rlll M. Haire, DRS, RIV G. Miller, DRS, RIV OFFIGIAT USE ENtY SEEURITY RETATEP INFORMATION