ML24121A183

From kanterella
Jump to navigation Jump to search
Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project
ML24121A183
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/2024
From: David Helker
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24121A182 List:
References
Download: ML24121A183 (1)


Text

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 contains Proprietary Information; upon separation this document is decontrolled.

200ExelonWay KennettSquare,PA19348 www.ConstellationEnergy.com PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 contains Proprietary Information; upon separation this document is decontrolled.

April 30, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project Constellation Energy Generation, LLC (CEG) has scheduled a pre-submittal meeting with the U.S.

Nuclear Regulatory Commission (NRC) on May 14, 2024, to discuss a proposed licensing initiative for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, for supporting the Emergency Core Cooling System (ECCS) Compensated Level Replacement Project. This pre-submittal meeting will include both open and closed sessions. The open portion of the meeting will allow for public participation; however, during the closed portion of the meeting proprietary information will be presented and access will be limited. In support of this meeting, CEG is submitting both proprietary and non-proprietary versions of the pre-submittal meeting presentation material.

Accordingly, Attachment 1 (Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material) contains information proprietary to Curtiss-Wright Corporation (Curtiss-Wright) and Curtiss-Wright requests that this document be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). An affidavit supporting this request is contained in. Attachment 3 contains a non-proprietary version of the pre-submittal meeting presentation material in which Curtiss-Wright proprietary information has been redacted.

Information that has been redacted is reflected by use of double brackets ((( ))).

Should you have any questions concerning this submittal, please contact Richard Gropp at 1-267-533-5642 or e-mail at Richard.Gropp@constellation.com.

Respectfully, David P. Helker Sr. Manager, Licensing Constellation Energy Generation, LLC

U.S. Nuclear Regulatory Commission Pre-Submittal Meeting Presentation Material Docket Nos. 50-277 and 50-278 April 30, 2024 Page 2 Attachments:

1. Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Proprietary Information)
2. Vendor (Curtiss-Wright) Affidavit
3. Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) cc:

w/ Attachments 2 and 3 only Regional Administrator - NRC Region I NRC Senior Resident Inspector - PBAPS NRC Project Manager, NRR - PBAPS Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources Division Chief of Nuclear Safety, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources S. Seaman, State of Maryland