IR 05000277/2024010

From kanterella
Jump to navigation Jump to search
Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010
ML24236A054
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/23/2024
From: Glenn Dentel
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024010
Download: ML24236A054 (1)


Text

August 23, 2024

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - FIRE PROTECTION TEAM INSPECTION REPORT 05000277/2024010 AND 05000278/2024010

Dear David Rhoades:

On August 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 and 3 and discussed the results of this inspection with Martin Bonifanti, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000277 and 05000278

License Numbers: DPR-44 and DPR-56

Report Numbers: 05000277/2024010 and 05000278/2024010

Enterprise Identifier: I-2024-010- 0029

Licensee: Constellation Energy Generation, LLC

Facility: Peach Bottom Atomic Power Station, Units 2 and 3

Location: Delta, PA 17314

Inspection Dates: July 22, 2024 to August 8, 2024

Inspectors: J. Ayala, Senior Health Physicist L. Cline, Senior Reactor Inspector L. Dumont, Senior Reactor Inspector

Approved By: Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Peach Bottom Atomic Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Units 2 and 3 Fire Barrier System
(2) Units 2 and 3 Fire Detection/Alarm System
(3) Units 2 and 3 Reactor Core Isolation Cooling System
(4) Units 2 and 3 Emergency Diesel Generators

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees Fire Protection Program (FPP) contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Fire Brigade Training, Drills, Qualifications, and Equipment
(2) Combustible Material Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) EC 633145 - Combustible Free Zone Evaluation - Select Combustible Free Zones (CFZ) and Transient Combustible Free Zones (TCFZ) Elimination
(2) EC 635066 - Fire Protection Engineering Evaluation for Sprinkler head 50-year testing

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 8, 2024, the inspectors presented the fire protection team inspection results to Martin Bonifanti, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Corrective Action 02575081

Documents 04070074

292629

04406048

04449094

04454049

04455608

04455689

04457158

04459888

04467697

04470781

04472989

04499193

04514922

04530669

04531509

04532084

04709784

04723586

04789477

Corrective Action 04788765

Documents 04787506

Resulting from 04789270

Inspection 04789477

04789500

04789757

04790308

04792090

04795063

04795064

04795065

Inspection Type Designation Description or Title Revision or

Procedure Date

Drawings A-167, Sheet 1 Fire Detection and Suppression - Floor Plan at Elevation Revision 009

116'-0"

A-167, Sheet 2 Fire Detection and Suppression - Floor Plan at Elevation Revision 000

116'-0"

Fire Detection and Suppression - Floor Plan at Elevation Revision 013

135'-0"

Fire Detection and Suppression - Floor Plan at Elevation Revision 009

165'-0"

E-1023 Electrical Layout #2 SU Transformer & Switchgear and #3 Revision 019

SU Switchgear Areas Sheet 1

E-1074 Lighting & Communication Layout, Reactor & Radwaste Revision 029

Building Unit 2 Plan

Engineering EC 633228 PBAPS Alternate Shutdown Radio System Replacement 6/9/2021

Changes

Engineering PEAF-0016 Peach Bottom Atomic Power Station Combustible Free Revision 000

Evaluations Zone Evaluation

PF-0007 Combustible Loading Analysis Revision 005

Miscellaneous EPRI Guideline for Assessing Sprinklers Used in Nuclear Power June 2020

3002016097 Plants

GEH-908P Control and Instrument Switches Revision 000

RT-O-023-760-2 HPCI Valve and Component Test from Alternative Control 5/7/2024

Panel

ST-M-037-315-3 Visual Walk Around Inspection of Fire Barriers Located in 11/2/2017

High Radiations Area

ST-O-052-204-2 E4 Diesel Generator Slow Start and Full Load Test 7/25/2-24

Procedures CC-AA-102 Design Input and Configuration Change Impact Screening Revision 035

CC-AA-209 Fire Protection Program Configuration Change Review Revision 007

CC-AA-211 Fire Protection Program Revision 009

CC-AA-211-1001 Fire Protection Engineering Evaluations (86-10) Revision 002

HU-AA-104-101 Procedure Use and Adherence Revision 007

LS-AA-128 Regulatory Review of Proposed Changes to the Approved Revision 003

Fire Protection Program

MA-AA-716-026 Station Housekeeping and Material Control Program Revision 023

OP-AA-201-001 Fire Marshall Tours Revision 009

Inspection Type Designation Description or Title Revision or

Procedure Date

OP-AA-201-003 Fire Drill Performance Revision 022

OP-AA-201-005 Fire Brigade Qualification Revision 011

OP-AA-201-008 Pre-Fire Plan Manual Revision 006

OP-AA-201-009 Control of Transient Combustible Material Revision

030

OP-AA-201-009 Control of Transient Combustible Material Revision 031

PI-AA-120 Issue Identification and Screening Processs Revision 013

PI-AA-125 Corrective Action Program Procedure Rev 009

Work Orders 4852274

4940309

4940310

4955926

4975018

4989859

5068430

25470

5189603

207438

284002

5396507

7