August 31, 2023

SUBJECT:

UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2023005 AND 05000278/2023005)

Dear David Rhoades:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-6916 with any questions you have regarding this letter.

Sincerely, Sarah H. Elkhiamy, Acting Chief Projects Branch 4 Division of Operating Reactor Safety

Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56

Enclosure:

Peach Bottom Inspection Plan

cc: Distribution via ListServ Sarah H.

Elkhiamy Digitally signed by Sarah H.

Elkhiamy Date: 2023.08.31 08:40:34-04'00'

ML23242A115

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME N Warnek S Elkhiamy

DATE 8/28/23 8/28/23

Site Inspection Activity Plan Peach Bottom 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count HP Rad Waste (71124.08)

2,3 7/24/2023 7/28/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE - PB

2,3 7/24/2023 7/28/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2,3 8/14/2023 8/18/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing PI&R Biennial Team Inspection - PB

2,3 7/17/2023 7/21/2023 IP 71152B 000747 Problem Identification and Resolution 2,3 7/31/2023 8/4/2023 IP 71152B 000747 Problem Identification and Resolution HP REMP (71124.07)

2,3 9/18/2023 9/22/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program Inservice Inspection - PB

3 10/23/2023 10/27/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

HP Rad Hazards (71124.01) and PIs (71151)

2,3 10/30/2023 11/3/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2,3 10/30/2023 11/3/2023 IP 71151 000746 Performance Indicator Verification Access Control, Equipment, Sec Trng, Sec Plan Review, PI, ISFSI-PB

2,3 12/11/2023 12/15/2023 IP 71130.02 000734 Access Control 2,3 12/11/2023 12/15/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 12/11/2023 12/15/2023 IP 71130.07 000739 Security Training 2,3 12/11/2023 12/15/2023 IP 71130.09 001656 Security Plan Changes 2,3 12/11/2023 12/15/2023 IP 71151 001338 Performance Indicator Verification 2,3 12/11/2023 12/15/2023 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Cyber Security - Peach Bottom

2,3 2/5/2024 2/9/2024 IP 71130.10 000741 Cybersecurity FY24 Peach Bottom Initial License Examination

2,3 3/25/2024 3/29/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 4/22/2024 4/26/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP - 71124.03 Airborne, 71124.04 Dose Assessment

2,3 4/8/2024 4/12/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 4/8/2024 4/12/2024 IP 71124.04 000728 Occupational Dose Assessment EP Exercise Inspection - Peach Bottom

2,3 4/15/2024 4/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Prepared on 8/22/2023 2:23:27 PM 1 of 3 Enclosure

Site Inspection Activity Plan 2,3 4/15/2024 4/19/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2,3 4/15/2024 4/19/2024 IP 71151 001397 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR

2,3 5/13/2024 5/17/2024 IP 71130.02 000734 Access Control 2,3 5/13/2024 5/17/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 5/13/2024 5/17/2024 IP 71130.07 000739 Security Training 2,3 5/13/2024 5/17/2024 IP 71130.09 001656 Security Plan Changes 2,3 5/13/2024 5/17/2024 IP 71151 001338 Performance Indicator Verification Fire Protection - Peach Bottom

2,3 7/15/2024 7/19/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

2,3 7/29/2024 8/2/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

RP - 71124.01 Rad Haz and 71151 PI Verification

2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification Inservice Inspection - Peach Bottom Unit 2

2 10/28/2024 11/1/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Material Control and Accounting - Peach Bottom

2,3 2/3/2025 2/7/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection - Peach Bottom

2,3 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing 2,3 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 2/24/2025 2/28/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification PB Requal Inspection with P/F Results

2,3 3/24/2025 3/28/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2,3 3/24/2025 3/28/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance PI&R Biennial Team Inspection - Peach Bottom

2,3 3/10/2025 3/14/2025 IP 71152B 000747 Problem Identification and Resolution 2,3 3/24/2025 3/28/2025 IP 71152B 000747 Problem Identification and Resolution RP - 71124.06 RETS

2,3 4/7/2025 4/11/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Commercial Grade Dedication - Peach Bottom

2,3 4/14/2025 4/18/2025 IP 71111.21N.03 001808 Commercial Grade Dedication 2,3 4/28/2025 5/2/2025 IP 71111.21N.03 001808 Commercial Grade Dedication Prepared on 8/22/2023 2:23:27 PM 2 of 3

Site Inspection Activity Plan RP - 71124.05 Rad. Instruments

2,3 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 2025 Peach Bottom Initial Operator Licensing Exam

2,3 4/14/2025 4/18/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2,3 5/19/2025 5/23/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Access Control, Protective Strategy, TSR, SPR, PIs - PB

2,3 5/19/2025 5/23/2025 IP 71130.02 000734 Access Control 2,3 5/19/2025 5/23/2025 IP 71130.05 000737 Protective Strategy Evaluation 2,3 5/19/2025 5/23/2025 IP 71130.09 001656 Security Plan Changes 2,3 5/19/2025 5/23/2025 IP 71130.14 000743 Review of Power Reactor Target Sets 2,3 5/19/2025 5/23/2025 IP 71151 001338 Performance Indicator Verification Prepared on 8/22/2023 2:23:27 PM 3 of 3