MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) IR 05000277/20230062024-02-28028 February 2024 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) IR 05000171/20230012024-02-20020 February 2024 Constellation Energy Generation, LLC - Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report No. 05000171/2023001 IR 05000277/20230042024-02-12012 February 2024 Integrated Inspection Report 05000277/2023004 and 05000278/2023004 IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 IR 05000277/20234012023-03-27027 March 2023 Security Baseline Inspection Report 05000277/2023401 and 05000278/2023401 IR 05000277/20230122023-03-10010 March 2023 Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000277/2023012 and 05000278/2023012 IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) IR 05000277/20220042023-02-0202 February 2023 Integrated Inspection Report 05000277/2022004 and 05000278/2022004 IR 05000277/20230112023-01-19019 January 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011 IR 05000171/20220012023-01-0404 January 2023 Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001 IR 05000277/20220902022-11-28028 November 2022 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation, Inspection Report 05000277/2022090 IR 05000277/20220032022-10-27027 October 2022 Integrated Inspection Report 05000277/2022003 and 05000278/2022003 and Preliminary White Finding and Apparent Violation IR 05000277/20224012022-09-27027 September 2022 Material Control and Accounting Program Inspection Report 05000277/2022401 and 05000278/2022401 (Cover Letter Only) IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/19570012022-08-19019 August 2022 631999-Termination License 50-27757-01 for G. Scott Crowther Dba Crowther Associates IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000277/20223012022-07-28028 July 2022 Initial Operator Licensing Examination Report 05000277/2022301 and 05000278/2022301 IR 05000277/20220022022-07-28028 July 2022 Integrated Inspection Report 05000277/2022002 and 05000278/2022002 IR 05000277/20224032022-07-13013 July 2022 Cyber Security Inspection Report 05000277/2022403 and 05000278/2022403 (Cover Letter Only) IR 05000277/20224022022-06-15015 June 2022 Security Baseline Inspection Report 05000277/2022402 and 05000278/2022402 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2022401 (Cover Letter Only) IR 05000277/20225012022-06-0808 June 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2022501 and 05000278/2022501 IR 05000277/20220112022-05-18018 May 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011 ML22117A0362022-04-27027 April 2022 Integrated Inspection Report 05000277/2022001 and 05000278/2022001 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210042022-02-0909 February 2022 Integrated Inspection Report 05000277/2021004 and 05000278/2021004 IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000171/20210012022-01-12012 January 2022 Safstor Inspection Report 05000171/2021001 IR 05000277/20223022022-01-10010 January 2022 Operator Licensing Retake Examination Report 05000277/2022302 and 05000278/2022302 IR 05000277/20210032021-11-0909 November 2021 Integrated Inspection Report 05000277/2021003 and 05000278/2021003 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 07200079/20214012021-10-21021 October 2021 ISFSI Security Inspection Report 07200079/2021401 2024-09-04
[Table view] Category:Letter
MONTHYEARML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-06
[Table view] |
Text
January 12, 2022
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNIT 1 - SAFSTOR INSPECTION REPORT 05000171/2021001
Dear Mr. Hanson:
On December 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, at the Peach Bottom Atomic Power Station Unit 1 (Peach Bottom 1). An on-site inspection was performed December 6-7, 2021. Additional inspection activities (in-office reviews) were conducted remotely as a consequence of the COVID-19 public health emergency (PHE) during this inspection. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of plant walk-downs by the inspectors, interviews with site personnel, and a review of procedures and records.
The results of the inspection were discussed with Mr. Matt Herr, Site Vice President, and other members of your organization on December 16, 2021, via teleconference, at the conclusion of the inspection and are described in the enclosed report. No violations were identified.
In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Orysia Masnyk Bailey at 864-427-1032 if you have any questions regarding this matter.
Sincerely, Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security
Docket No: 05000171 License No: DPR-12
Enclosure: Inspection Report No. 0500171/2021001
w/ Attachment
cc w/encl: Distribution via ListServ Anthony M.
Dimitriadis Digitally signed by Anthony M.
Dimitriadis Date: 2022.01.12 14:25:11 -05'00'
EXECUTIVE SUMMARY
Exelon Generation Company LLC
Peach Bottom Atomic Power Station, Unit 1 NRC Inspection Report No. 05000171/2021001
An announced routine SAFSTOR inspection was completed on December 7, 2021 at the permanently shut down Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom 1). The inspectors reviewed activities related to the safe storage of radioactive material, including site operations, engineering, maintenance, plant support activities, management oversight, and corrective action program (CAP) implementation. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. At the time of the inspection, no decommissioning activities were being conducted at Peach Bottom 1. The U.S. Nuclear Regulatory Commissions (NRCs) program for overseeing the safe storage of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program.
Based on the results of this inspection, no violations were identified.
REPORT DETAILS
1.0 Background
Peach Bottom Unit 1 was a high temperature gas-cooled demonstration power reactor that operated from February 1966 until October 31, 1974. It was permanently shut down and has been in safe storage (SAFSTOR) since that time. Exelon plans to dismantle Unit 1 in parallel with the decommissioning of the operational Units 2 and 3 after they have been permanently shut down. All fuel from Unit 1 has been removed from the reactor and shipped to an offsite facility. The spent fuel pool has been drained, decontaminated, and radioactive liquids have been removed. Intrusion water that occasionally collects in the reactor containment sump is periodically pumped out of the sump and transferred to the common radwaste building used for Peach Bottom Units 2 and 3 for processing.
The NRC's program for overseeing the safe storage and decommissioning of a shut-down nuclear power reactor is described in IMC 2561.
2.0 SAFSTOR Performance and Status Review
a. Inspection Scope
(Inspection Procedures 37801, 40801, 60801, 64704, 71801, 83750, 84750, 86750)
A routine announced safety inspection was conducted from December 6-7, 2021. The inspection consisted of plant walkdowns, interviews with Exelon personnel, and a review of procedures and records. The inspectors reviewed the SAFSTOR program as outlined in the Updated Final Safety Analysis Report (UFSAR), technical specifications (TS), and procedure DC-PB-800, Unit 1 Process Control Program, to assess the adequacy of management oversight for the Unit 1 facility. Specifically, the inspectors reviewed the decommissioning management and staff organization and Exelons implementation of Unit 1 programs for the SAFSTOR phase of decommissioning. The inspectors also conducted plant walk-downs to assess the material condition of the Unit 1 buildings.
The inspectors reviewed the results of the Exelon Unit 1 Exclusion Area Inspection semi-annual surveillance tests to ensure exclusion area barriers, radiological conditions, water intrusion, and effluent release limits are as specified in the TS. Additionally, as part of this review, the inspectors reviewed the program for structural monitoring inspections at Unit 1.
The inspectors reviewed activities, components, and documentation associated with the following SAFSTOR programs: decommissioning organization, staffing, and cost controls; safety reviews and modifications; fire protection, maintenance and surveillance, and license compliance.
The inspectors evaluated whether the following programs that remain associated with programs for Units 2 and 3 are being adequately applied and administered for Unit 1:
occupational radiation exposure, radioactive effluent technical specifications (RETS), the site radiological environmental monitoring program (REMP), and the processing and transportation of radioactive waste.
The inspectors reviewed Exelon fleet audit reports, corrective action program (CAP)documents, and the onsite and offsite safety review committee activities associated with Unit 1 to determine if issues were being appropriately identified, assessed, and reviewed and that corrective actions had been appropriately implemented.
The inspectors also reviewed radiological survey reports and condition reports.
b. Observations and Findings
The inspectors confirmed that the SAFSTOR program was being effectively implemented. The inspectors verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the technical specification requirements and established procedures. The inspectors also confirmed that no dismantlement or decommissioning activities were performed since the previous inspection.
The inspectors reviewed information relevant to the status of the decommissioning trust fund and its expenditures, as provided by Exelon during the inspection period, with no concerns identified.
During the previous NRC inspection in 2020, the NRC identified a non-cited violation of Section 2.3 of Amendment 10, Appendix A, Technical Specifications, which requires that a semi-annual inspection, including a radiological survey, of the accessible portions of the exclusion area and inspection of the accessible areas below ground level in the containment vessel. Specifically, from July 1978 until October 2020, these inspections did not include areas of containment that could be accessed by unlocking barrier B-14 on the Refueling Floor to access the intermediate and ground-level floors.
The licensee addressed this violation by revising ST-H-099-960-2, Unit 1 Exclusion Area Inspection on March 25, 2021 (Rev. 27) to allow access to the areas in question by granting entry to the southwest stairway leading from the refueling floor to the lower levels. This was done by providing the key to unlock barrier B-14. This required a revision to the Unit 1 UFSAR which clarified some ambiguity between periodic and special inspections of containment.
The boundary of the controlled area and the barriers in place to limit access to the controlled area had not been altered. Areas of containment which are sealed due to radiological concerns or other safety hazards will remain inaccessible.
The inspectors entered the Unit 1 containment with members of the Peach Bottom staff for a plant walkdown. The entrances to containment were barricaded (as required by TS) with a locked fence and posted as a radiologically controlled area (RCA). All entrants were briefed on radiological conditions, signed-onto a radiological work permit, and escorted by a radiological protection technician.
The annual radiological effluent and the annual REMP reports demonstrated that all calculated doses were below regulatory dose criteria of 10 CFR 50, Appendix I, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion As Low as is Reasonably Achievable for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents. The inspectors discussed shipping requirements and processes with site staff to gain an understanding of the sites experience and expertise on shipping radwaste.
Findings or issues identified in audits, plant equipment operator rounds, and staff observations were entered into the CAP. Site staff effectively addressed the issues identified, implemented corrective actions, and tracked them to closure. Condition reports and corrective actions appeared to be prioritized and evaluated commensurate with their safety significance.
c. Conclusions
Based on the results of this inspection, no violations were identified.
3.0
Exit Meeting Summary
On December 16, 2021, the inspectors presented the inspection results to Mr. Matt Herr, Site Vice President, and other members of Exelons organization via teleconference. No proprietary information was retained by the inspectors or documented in this report.
KEY POINTS OF CONTACT
Licensee
M. Herr, Site Vice President S. ODwyer, Manager of Regulatory Assurance D. Turek, Director of Organizational Performanc e and Regulatory Assurance T. Angelbert, Senior Engineer R. Disabatino, Operations Director B. Dizebba, Manager of Radiation Protection Programs A. Frain, Senior Manager Maintenance Execution D. Williams, Unit 1 Project Manager
ITEMS OPEN, CLOSED, AND DISCUSSED
The inspectors reviewed the corrective measures implemented for the non-cited violation (NCV)associated with TS Section 2.3 identified during the previous NRC inspection.
LIST OF
DOCUMENTS REVIEWED
Annual Radiological Environmental Operating Report 76, January 1, 2020 through December
31, 2020, Peach Bottom Atomic Power Station Units 2 and 3
Annual Radiological Groundwater Protection Program Report (ARGPPR)
January 1 through December 31, 2020, Peach Bottom Atomic Power Station Units 2 and 3
Annual Radioactive Effluent Release Report 63, January 1, 2020 through December 31, 2020,
Peach Bottom Atomic Power Station Units 2 and 3 containing Appendix A Radiological Dose
Calculations Manual Specifications (ODCMS) and Bases, Rev. 16
Incident Reports 04448852, 04448849, 04425572, 04418564, 04408190, 04367008, 04367005,
and 04367002
LS-AA-104-1001, Rev. 4, UFSAR Change 2021-002
Entry Into Unit 1 During SAFSTOR Decommissioning Status, DC-PB-800-1000, Revision 2
Quality Assurance Topical Report (QATR), NO-AA-10, Revision 97
Radiation Work Permit PB-C-21-00121, Revision 0
Radiological surveys, Unit 1, dated May 7, 2021
Report on Status of Decommissioning Funding for Shutdown Reactors, RS-20-030,
February 24, 2021
Spreadsheet, Peach Bottom Expenses for 2020
Technical Specifications for Peach Bottom Atomic Power Station Unit No. 1, Appendix A to
License No. DPR-12, Amendment 11
LIST OF ACRONYMS USED
CAP
Corrective Action Program
Exelon
Exelon Generation Company, LLC
IMC
Inspection Manual Chapter
IP
Inspection Procedure
NCV
Non-Cited Violation
NRC
Nuclear Regulatory Commission
PBAPS
Peach Bottom Atomic Power Station
RCA
Radiologically Controlled Area
REMP
Radiological Environmental Monitoring Program
RETS
Radiological Environmental Technical Specifications