{{#Wiki_filter:AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.COMPLETED IIY'T~Chilson t9aSl=MONTH AUGUST i 1980 DAY AVERAGE DAlLY POWER LEVEL (M We.Net}I 643 639 DAY AVERAGE DAlLY POWER LEVEL (MWe.&#xc3;et)653 17 18 647 10 12 I3 IS 16 INSTRUCTlONS 637 64 503 664 658 655 658 656 656 656 649 656 20 21 22 24 25 16 17 28 o9 30 31 NOTE: 653 647 652 657 652 642 643,.644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the aveta8e daily unit power Ie>eI in MWe.Net for each day in the rep<>rtin8 tn>>nth.C>>n>pute to the nearest whole megawat t.(ol77)
{{#Wiki_filter:AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
OPERATING DATA REPORT DOCKET NO.DA~~S~e.980 COMPLETED BY 2L3~31Q.son TEI.EPHONE
COMPLETED IIY
+~~2-3824 OPERATING STATUS Turke Point Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design EIcctrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWc): Notes-Unit No.3 operated at approximately 100X R.P., except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7}Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MVe has been rerated to the most restricted seasonal conditions (summer)experienced.
                                                                                                      '
Maximum Dependable Capacity (Net MWe)has been rerated accordingly.
T~   Chilson t9aSl=
9.Power Level To Which Restricted.
MONTH         AUGUST i 1980 DAY       AVERAGE DAlLYPOWER LEVEL                              DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net}                                                     (MWe.&#xc3;et )
If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Nct)D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 979.7 744.0 4&09.4 737.9 10 410 368 1 613 090 3 275 415 3 104 278 503 570 478 174 82.1 99.2 82.1 99.2 82.1 9.5 6.1.3 0.8 (Type.Date.and Duration of Each):-Oct.5-Nov.1 19&0.52 249.2 213.4 50 499.6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2'5.1 2.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup 26.Units ln Test Status (Prior to Commercial Operation>:
I 643                                    17                      653 639                                    18 647 637                                   20                      653 64                                   21                      647 22 503                                                           652 664                                   24 658                                   25                      657 10                        655                                   16                      652 658                                   17 12                        656                                   28                      642 I3                        656                                   o9                      643,.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (i>(77)
656                                 30                      644 IS                        649                                   31                      648 656 16 NOTE:       Average        daily        power level greater than 646   MWe     due     to cooler condenser         cooling INSTRUCTlONS water.
UNIT SHUTDOWNS AND POIVER REDUIONS DOCKET NO.80 N<<.I)at>>El CL t-Q c 5L'~C~C/l Liccnscc Event Report~ce 0<<Vl rn Cr s~C~Q Cr Cause&Corrective Action lo Prevent Rccurrcncc 16 80-08-06 6.1 B N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)I I': F<<reed S: Sch>>du!cd Reason: A.Equipment Failure (Explain)B.Maintenance or Test-C-Refueling D.R>>gulatory Restriction L'.Operator Training&Liccnsc Examination F-Administrative G-Operational Error (Explain)II Other (Explain)3 Method: I.Manual 2.Manual Scram.3-Automatic Scrant.4.Other (Explain)4 Exhibit G-Instructions for Preparation ol Data Entry Shccts for Licensee Event Report (LER)Fil>>(NUREC.OI6()Exhibit I-Same Sour>>>>
On this format. list the aveta8e daily unit power Ie> eI in MWe.Net for each day in the rep<>rtin8 tn>>nth. C>>n>pute to the nearest whole megawat t.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50 251 COMPI.ETED IIY V-T~ChilSOn MONTH AUGUST 1980 DAY AVERAGE DAlLY POWER LEVEL (h)We.Net)
(ol77)
I 633 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)639 17 634 10 13 15 16 635 630 633 640 644 645 644 640 641 640 19 20 21 22 25 26 28'79 30 31 635 634 635 636 638 640 642 634 630 6 2 636 INSTRUC11ONS Qn this format.list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth.Crnnpute to the nearest whole rnegawat t.(ril77)
 
OPERATING DATA REPORT DOCKET NO..'iQ=~DATE~~980 COMPLETED BY 2LX.~~son TELEPHONE~F52-3824 OPERATING STATUS 646 I UdtN.Turke Point Unit No.4 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net M We): e 7.Maximum Dependable Capacity (Net MWe): Notes-Unit No.4 operated at approximately 100K R.P.S.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Gross MRe)has been rerated to the most restricted seasonal conditions summer ex erieaced.Maximum De endable Ca acit Net MMe has been rerated accordingly.
OPERATING DATA REPORT DOCKET NO.
9.Power Level To Which Restricted.
DA~     ~S~   e.         980 COMPLETED BY       2L3~31Q.son TEI.EPHONE     +~~2-3824 OPERATING STATUS Turke   Point Unit No.         3         Notes  Unit No. 3          operated
If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE TMa Month Yr..to.Date Cumulative 744.0 4 532nl-0--166.6 4 627.3 31.2 90 848 116 1 633 024 28 900 833 70.8 70.9 69.0 64.1 3.0"I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12.3 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Generated (MWH)9 629 136 la.Grass Eleerrirnl Energy Generereg (grlyHl~4282 2 997 355 n e-slssss-19.Unit Service Factor 75.9 20.Unit Availability Factor 100.0 76.1 21.Unit Capacity Factor (Using MDC Net)98.6 75.1~~.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each): maintenance and ins ections>>Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 2&.Units ln Test Status l Prior to Commercial Operation):
: 1. Unit Name:
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION Ig>/77)
at approximately          100X    R.P.,
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980 t TELEPH0>K+30%t S52-~l)alc C t$~z 0 rl Vl r3 Q gr, I CO c o Z gee~CA Liccoscc Event Report>2<0 V'a IA cn'Cr C ILI Q 0 Cause h Corrective Action to Prcvcnt Recurrcocc N 0 N I F: Forced S: Scl>edulcd
: 2. Reporting Period:                                                                                  of
('J/77)Reason: A.Equipment Failure (Explain)II hlaintenance or Test C.Refueling.
: 3. Licensed Thermal Power (MWt):
D.Regulatory Restriction L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)II Other (Explain)3 hlethod: I.Manual 2.Manual Scram.3.Autotoatic Scraol.4ther (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Evcot Report (LER)File (NUREG.016I)Exhibit I-Salllc Sollrcc AVERAGE DAILY UNIT POWER LEVEL COMPLETED IIY V.T.Chilson DAY AVERAGE DAILY POWER LEVEL (MWe.Net)7 794 796 777 77 792 791 790 791 10 798 797 718 126 DAY 17 18 19 20 95 26 37<<2$>9 30 AVERAGE DAILY POWER LEVEL (MWe.Net)673 787 786 725'83 782 757 759 781 779 780 15 16 INSTRUCTIONS 255 394 31 NOTE: 749 Average daily power level greater than 777 MNe due to cooler condenser cooling water.On this format.list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth.C>>rnpute to thc nearest whole megawatt.(o(77)
except      for  outage        Aug.
OPERATING STATUS OPERATING DATA REPORT DOCKET NO.'HL3Zi DATE R@~~980-COMPLETED BY T.Chilson TELEPHONE 552-3824 St.Lucie Unit No.1 2560 850 802 I.Unit Name 2.Reporting Period: 3., Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe}: S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross M We): 7.Maximum Dependable Capacity (Net MWe): Notes-Unit operated at approximately 100X R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Ca pacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
760                  6-7,    1980
If Any (Net MWe): IO.Reasons For Restrictions, lf Any: This Month 744.0 Yr..to-Date 5 855.0 I I.Hours In Reporting Period l3.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours I 7.Gross Electrical Energy Generated (MWH)IS.Net Electrical Energy Generated (MWH)l9.Unit Service Factor 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate Z4.Shutdowns Scheduled Over Next 6 Months{Ty 4 2-0-3 889.7 72.0-0-701.4 7.3 7.3 3 101 490 551 240 519 201 2 915 036 66.4 94.3 8.8 64.1 62.1 87.0-0-pe, Date.and Duration of Each): Cumulative 32 399.0.2 129.5 24 719.7 39.3 1 395 990 18 242 932 76.3 76.4 72.5 70.2'.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: '6.Units In Test Status I Prior to Commercial Operation):
: 4. Nameplate Rating (Gross MWe):
N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COhtMERCIAL OPERATION Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.iW!l-No.l Vo.Date CS A I I Vl rj Q A c~P Q~co g Liccn sec Event Report>C+Q cn Cr c EI C lh Cl E t" O Cr Cause Ec Corrective Actiun lo Prcvcnt Recurrcncc 80-08-14 S 10.7 N/A TRANSP Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14 B N/A TRANSP Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3 N/A TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: I'orccd S: Scheduled Reason: A.Equipment Failure (Explain)B.hIaintenance oi Test-C.Refueling D-Regulatory Restriction L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive G-Operational Error (Fxplain)II.Other (Explain)3 hiethod: I-Manual 2 hlanual Scratn.3-Autotnalic Scram.4-Other (Explain)Exhibit G-Instructions I'or Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG.OI6 I)5 Exhibit I~Satne Source Page 2 of 2 80 UNIT SIIUTDOWNS AND POWER REDUCTIONS
: 5. Design EIcctrical Rating (Net MWe):              693
.RL=335-UNIT NAME COMPLETED BY TELEPIIONE 305 552-382 No.l Nii.Date El 0-W~t C~-L a Q AK O~r>~A J I 0~C/l Liccoscc Event Rcport-" C<II'J cn G~J 2 Q Q Cause k Corrective Action lo Prevent Recurrcncc 14 80-08-17 24.6 B N/A EG TRANSP Unit was removed from service to install new bushing and return main power transformer No.1B to service.(Non-nuclear system)I': Forced S: Scheduled ('>/77)Rcasolt: A Equipment Failure (Explain)8 Maintenance or Test~C.Refueling D Regulatory Restriction E Operator Training 8c Liccnsc Examination F.Administrative
: 6. Maximum Dependable Capacity (Gross MWe):                  680
., G Operational Error (Fxplain)II.Other (Explaitt) hlethod: I-hianual 2 hlanual Scram.3-Automatic Scram.4 Other (Explain)Exhibit G-Instructions for Preparation oi'Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-OI6I)Exhibit I-Sante SourlY.
: 7. Maximum Dependable Capacity (Net MWc):
P.O.3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September 6, 1980 Office of Management Information and Program Controls U.S.Regulatory Commission washington, D.C.20555 Gentlemen:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7} Since Last Report, Give Reasons:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.chmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire e P'SER"ING P=QP'  
Maximum De endable Ca             acit     Gross MVe has been rerated to the most restricted                             seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net                                 MWe)     has been rerated accordingly.
.
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month           Yr.-to-Date           Cumulative
: 11. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                   744.0              4  979.7            52 249.2
: 13. Reactor Reserve Shutdown Hours                                                                       213.4
: 14. Hours Generator On. Line                               737. 9            4 &09.4                50  499.6
: 15. Unit Reserve Shutdown Hours                                                                           121.8
: 16. Gross Thermal Energy Generated (MWH)               1 613 090            10 410 368            101 879 002
: 17. Gross Electrical Energy Generated (MWH)               503 570            3 275 415              32 356 415
: 18. Net Electrical Energy Generated (MWH)                 478 174            3 104 278              30 626 372
: 19. Unit Service Factor                                     99.2                  82.1                    74.4
: 20. Unit Availability Factor                                 99.2                  82.1                    74.6
: 21. Unit Capacity Factor (Using MDC Net)                       9.5                  82.1                    70. 2
: 22. Unit Capacity Factor (Using DER Nct)                                             6.                   '5.1 D. Unit Forced Outage Rate                                     0.8                    1.3                    2.5
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration    of Each):
                                                                -  Oct. 5 - Nov. 1         19&0.
: 25. If Shut Down At End Of Report Period, Estimated Date     of Startup
: 26. Units ln Test Status (Prior to Commercial Operation>:                        Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (i>(77)
 
UNIT SHUTDOWNS AND POIVER REDUIONS                      DOCKET NO.
80 El Liccnscc    0ce<<
s~                    Cause  & Corrective Q
N<<.         I)at>>    CL t-                      c  5L'~
Event      Vl C  ~
Action lo C    Report ~  rn Cr      Q                    Prevent Rccurrcncc
                                                ~ C/l                              Cr 16        80-08-06          6.1        B                    N/A      CB    MOTOR X    Unit  No. 3 was removed from service due  to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System)
I                                                                      3                                4 I': F<<reed          Reason:                                            Method:                            Exhibit G - Instructions S: Sch>>du!cd        A.Equipment Failure (Explain)                     I.Manual                          for Preparation ol Data B.Maintenance or Test-                            2.Manual Scram.                    Entry Shccts for Licensee C-Refueling                                        3-Automatic Scrant.               Event Report (LER) Fil>> (NUREC.
D.R>>gulatory Restriction                          4.Other (Explain)                  OI6()
L'.Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain)                                                        Exhibit I - Same Sour>>>>
II Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.        50      251 COMPI.ETED IIY        V- T ~ ChilSOn MONTH        AUGUST          1980 DAY      AVERAGE DAlLYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (h)We.Net)                                                    (MWe.Net)
I 633                                    17                      639 634 635                                  19                      635 630                                  20                      634 633                                  21                      635 640                                  22                      636 644                                                          638 645                                                          640 644                                  25                      642 10                                                              26                      634 630 28                      6 2 13                        640                                  '79 641                                  30                      636 15                                                              31 16                        640 INSTRUC11ONS Qn this format. list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth. Crnnpute to the nearest whole rnegawat t.
(ril77)
 
OPERATING DATA REPORT NO..'iQ=~
DOCKET DATE COMPLETED BY
                                                                                                      ~~980 2LX.~~son TELEPHONE    ~F52-3824 OPERATING STATUS I UdtN      .                Turke      Point Unit No.      4          Notes  - Unit No. 4 operated
: 2. Reporting Period:
at approximately 100K R.P.
: 3. Licensed Thermal Power (MWt):                    2200
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
e                      646
: 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca              acit    (Gross MRe) has been rerated to the most              restricted seasonal conditions summer ex erieaced. Maximum                        De  endable  Ca  acit    Net MMe    has been rerated accordingly.
: 9. Power Level To Which Restricted. IfAny (Net MWe):              NONE
: 10. Reasons For Restrictions,    lfAny:
TMa Month          Yr..to.Date          Cumulative "I I. Hours In Reporting Period                               744.0
: 12. Number Of Hours Reactor      Was Critical                                4 532nl
: 13. Reactor Reserve Shutdown Hours                                            12.3              -166.6 4   627.3
: 15. Unit Reserve Shutdown Hours                                                  12.3                 31.2 1 633 024            9 629 136          90 848 116
: 16. Gross Thermal Energy Generated (MWH)
                                                      ~4282 la. Grass Eleerrirnl Energy Generereg (grlyHl
: 19. Unit Service Factor n e          slssss                2 997 355 75.9 28 900 833 70.8
: 20. Unit Availability Factor                                100.0                76.1                  70.9
: 21. Unit Capacity Factor (Using MDC Net)                    98. 6               75.1                 69.0
~~. Unit Capacity Factor (Using DER Net)                    92.0                70.0                 64.1
: 23. Unit Forced Outage Rate                                                      0.3                  3.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration    of Each):
maintenance          and  ins ections      >> Nov. 9 1980      -  Jan. 10, 1981.
: 25. IfShut  Down At End Of Report Period, Estimated Date of Startup:
2&. Units  ln Test Status l Prior to Commercial Operation):                    Forecast            Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION Ig>/77)
 
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980                                        S52-~
TELEPH0>K          +30%t t
gr, I
C        rl      CO c o                    2<
C ILI Liccoscc    0 V                Cause  h Corrective l)alc                        Vl                                'a      Q t$        r3  Z gee          Event      IA                      Action to 0~z Q
Report >    cn'Cr      0       Prcvcnt Recurrcocc
                                                    ~ CA N    0    N I
3 F: Forced            Reason:                                            hlethod:
S: Scl>edulcd                                                                                  Exhibit G - Instructions A.Equipment Failure (Explain)                      I.Manual              for Preparation of Data II hlaintenance or Test                            2.Manual Scram.      Entry Sheets for Licensee C.Refueling.                                        3.Autotoatic Scraol. Evcot Report (LER) File (NUREG.
D.Regulatory Restriction                            4ther (Explain)      016I )
L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)
Exhibit I - Salllc Sollrcc
('J/77)                   II Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY        V. T. Chilson DAY      AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                      (MWe.Net) 7                                    17 794                                    18                      673 796                                    19                      787 777                                  20                      786 77                                                            725'83 792 791 790 791                                    95                      782 10                                                                26                      757 798                                    37  <<                    759 797                                    2$                      781 718                                    >9                    779 126                                  30                        780 15                        255                                    31                      749 16                        394                                  NOTE:       Average        daily power level greater than 777 MNe due            to cooler condenser cooling water.
INSTRUCTIONS On this format. list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth. C>>rnpute to thc nearest whole megawatt.
(o(77)
 
OPERATING DATA REPORT DOCKET NO.   'HL3Zi DATE  R@~~980-COMPLETED BY        T. Chilson TELEPHONE          552-3824 OPERATING STATUS I. Unit Name                  St. Lucie Unit No.          1              Notes  - Unit  operated at
: 2. Reporting Period:
approximately 100X R.P.,
3., Licensed Thermal Power (MWt):
2560                  except for outages of Aug.
850                  14, 14-15, and 16-18, 1980,
: 4. Nameplate Rating (Gross MWe}:
802                  and reduced load operation S. Design Electrical Rating (Net MWe):
of  Aug.14-18, 1980.
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Ca pacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. IfAny (Net MWe):
IO. Reasons For Restrictions,    lf Any:
This Month            Yr..to-Date        Cumulative I I. Hours In Reporting Period                              744.0              5  855.0            32 399.0.
72 .0              4        2          2 l3. Reactor Reserve Shutdown Hours                                                              129. 5
: 14. Hours Generator On-Line                                  701.4              3  889.7           24 719.7 IS. Unit Reserve Shutdown Hours                                  7.3                  7.3                39.3 I 7. Gross Electrical Energy Generated (MWH)                551 240            3  101 490          1 395 990 IS. Net Electrical Energy Generated (MWH)                    519 201            2 915    036        18 242 932 l9. Unit Service Factor                                        94.3                  66.4                76.3
: 20. Unit Availability Factor                                                                              76.4 8  .8                64.1                72. 5
: 22. Unit Capacity Factor (Using DER Net)                       87.0                  62.1                70.2
: 23. Unit Forced Outage Rate                                                                                 '.4 Z4. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration      of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date      of Startup:  N/A
'6. Units In Test Status I Prior to Commercial Operation):                      Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COhtMERCIAL OPERATION
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                          DOCKET NO.
No.l Page 1 of 2 80 iW!l  552-3824 cEI I I cA ~      Liccn sec      C+Q        C lh                Cause  Ec Corrective P    Q                                      Cl Vo.           Date                        Vl rj                Event                                                  Actiun lo CS Q                                            E  t" A                ~co g        Report >      cn Cr        O                    Prcvcnt Recurrcncc Cr 80-08-14  S      10.7                              N/A                  TRANSP    Unit  was removed from          service to isolate  main power transformer No. 1B  to repair oil leak. Cor-rective actions included installing new  bushing.       (Non-nuclear system) 12        80-08-14                      B                    N/A                 TRANSP    Load was limited to the capacity              of main transformer No. 1A. (Non-nuclear system) 13        80-08-14            7.3                            N/A                 TRANSP    Unit was removed from service to pro-tect personnel using a crane to re-move a  faulty bushing from           main power transformer No. 1B.           (Non-nuclear system)
I                                                                        3 F: I'orccd        Reason:                                              hiethod:                            Exhibit G - Instructions S: Scheduled        A.Equipment Failure (Explain)                         I-Manual                            I'or Preparation of Data B.hIaintenance oi Test-                              2 hlanual Scratn.                   Entry Sheets I'or Licensee C.Refueling                                          3-Autotnalic Scram.                  Event Report (LER) File (NUREG.
D-Regulatory Restriction                              4-Other (Explain)                   OI6 I )
L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive                                                                   5 G-Operational Error (Fxplain)                                                             Exhibit I ~ Satne Source II.Other (Explain)
 
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                    . RL=335-UNIT NAME                      No.l COMPLETED BY 80              TELEPIIONE        305 552-382 Page 2 of   2 I
C        r>                                            ~J El    ~ L                    0 Liccoscc      C<
II'J                          Cause  k Corrective Nii.          Date        0-        a      ~ A                Event                                             Action lo W~     Q t
O~AK        J Rcport -"    cn  G        2Q Q                Prevent Recurrcncc
                                                      ~ C/l 14          80-08-17            24.6        B                  N/A           EG        TRANSP  Unit was removed from service to install new bushing and return main power transformer No. 1B to service.
(Non-nuclear system)
I': Forced            Rcasolt:                                            hlethod:                          Exhibit G - Instructions S: Scheduled          A Equipment Failure (Explain)                        I -hianual                      for Preparation oi'Data 8 Maintenance or Test    ~
2 hlanual Scram.                  Entry Sheets I'or Licensee C.Refueling                                          3-Automatic Scram.               Event Report (LER) File (NUREG-D Regulatory Restriction                            4 Other (Explain)                 OI6I )
E Operator Training 8c Liccnsc Examination F.Administrative
                        ., G Operational Error (Fxplain)                                                         Exhibit  I - Sante SourlY.
('>/77)                   II.Other (Explaitt)
 
P.O. 3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September         6, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission washington, D. C. 20555 Gentlemen:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. chmidt Vice President Power Resources VTC/ddc cc:   Mr. James P. O'Reilly Robert Lowenstein, Esquire e P'     SER"ING P=QP'
 
                    .


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT   Unit   No. 3 DATE   Se t. 6 1980 COMPLETED BY     V.. T. Chilson TELEPHONE     (305) 552-3824 REPORT MONTH      AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.
Florida Power&Light Company commitments for NUREG-0578 implementation are continuing.
Major Safety-related maintenance     activities performed during the month included:
Refer to correspondence between FPL and NRC for ad-ditional information.  
Inspections and requirements of IE Bulletins and NUREG-0578   are continuing.
-~.
Florida Power & Light Company commitments for NUREG-0578   implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
 
                                              - ~
                    .


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey.Point UNIT Unit No.4 DATE Se t.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE.
OF OPERATING EXPERIENCE DOCKET NO.     50 - '251 Turkey .Point UNIT     Unit   No. 4 DATE     Se t. 6, 1980 COMPLETED BY       V. T. Chilson TELEPHONE.     (305) 552-3824 REPORT MONTH      AUGUST  1980 Unit No. 4 operated at approximately 100%, R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
(305)552-3824 Unit No.4 operated at approximately 100%, R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
Major Safety-related maintenance   activities   performed duning the month included:
Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for NUREG-'0578 implementation are continuning.
Inspections and requirements   of IE Bulletins and NUREG-0578 in progress.
Refer to correspondence between FPL and NRC for ad-ditional information.  
Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning.     Refer to correspondence between FPL and NRC for ad-ditional information.
.
 
                    .


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT     Unit No. 1 DATE     Se t. 6 1980 COMPLETED BY     V. T. Chilson TELEPHONE      (305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Major Safety-related maintenance activities performed during the month included:
Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing.
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Refer to correspondence between FPL and NRC for.ad-ditional information.
Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for.ad-ditional information.
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}}
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}}

Revision as of 11:10, 22 October 2019

Monthly Operating Repts for Aug 1980
ML17340A184
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A993 List:
References
NUDOCS 8009170281
Download: ML17340A184 (14)


Text

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

COMPLETED IIY

'

T~ Chilson t9aSl=

MONTH AUGUST i 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net} (MWe.Ãet )

I 643 17 653 639 18 647 637 20 653 64 21 647 22 503 652 664 24 658 25 657 10 655 16 652 658 17 12 656 28 642 I3 656 o9 643,.

656 30 644 IS 649 31 648 656 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTlONS water.

On this format. list the aveta8e daily unit power Ie> eI in MWe.Net for each day in the rep<>rtin8 tn>>nth. C>>n>pute to the nearest whole megawat t.

(ol77)

OPERATING DATA REPORT DOCKET NO.

DA~ ~S~ e. 980 COMPLETED BY 2L3~31Q.son TEI.EPHONE +~~2-3824 OPERATING STATUS Turke Point Unit No. 3 Notes Unit No. 3 operated

1. Unit Name:

at approximately 100X R.P.,

2. Reporting Period: of
3. Licensed Thermal Power (MWt):

except for outage Aug.

760 6-7, 1980

4. Nameplate Rating (Gross MWe):
5. Design EIcctrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWc):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7} Since Last Report, Give Reasons:

Maximum De endable Ca acit Gross MVe has been rerated to the most restricted seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net MWe) has been rerated accordingly.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 744.0 4 979.7 52 249.2
13. Reactor Reserve Shutdown Hours 213.4
14. Hours Generator On. Line 737. 9 4 &09.4 50 499.6
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 1 613 090 10 410 368 101 879 002
17. Gross Electrical Energy Generated (MWH) 503 570 3 275 415 32 356 415
18. Net Electrical Energy Generated (MWH) 478 174 3 104 278 30 626 372
19. Unit Service Factor 99.2 82.1 74.4
20. Unit Availability Factor 99.2 82.1 74.6
21. Unit Capacity Factor (Using MDC Net) 9.5 82.1 70. 2
22. Unit Capacity Factor (Using DER Nct) 6. '5.1 D. Unit Forced Outage Rate 0.8 1.3 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

- Oct. 5 - Nov. 1 19&0.

25. If Shut Down At End Of Report Period, Estimated Date of Startup
26. Units ln Test Status (Prior to Commercial Operation>: Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (i>(77)

UNIT SHUTDOWNS AND POIVER REDUIONS DOCKET NO.

80 El Liccnscc 0ce<<

s~ Cause & Corrective Q

N<<. I)at>> CL t- c 5L'~

Event Vl C ~

Action lo C Report ~ rn Cr Q Prevent Rccurrcncc

~ C/l Cr 16 80-08-06 6.1 B N/A CB MOTOR X Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System)

I 3 4 I': F<<reed Reason: Method: Exhibit G - Instructions S: Sch>>du!cd A.Equipment Failure (Explain) I.Manual for Preparation ol Data B.Maintenance or Test- 2.Manual Scram. Entry Shccts for Licensee C-Refueling 3-Automatic Scrant. Event Report (LER) Fil>> (NUREC.

D.R>>gulatory Restriction 4.Other (Explain) OI6()

L'.Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain) Exhibit I - Same Sour>>>>

II Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 COMPI.ETED IIY V- T ~ ChilSOn MONTH AUGUST 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (h)We.Net) (MWe.Net)

I 633 17 639 634 635 19 635 630 20 634 633 21 635 640 22 636 644 638 645 640 644 25 642 10 26 634 630 28 6 2 13 640 '79 641 30 636 15 31 16 640 INSTRUC11ONS Qn this format. list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth. Crnnpute to the nearest whole rnegawat t.

(ril77)

OPERATING DATA REPORT NO..'iQ=~

DOCKET DATE COMPLETED BY

~~980 2LX.~~son TELEPHONE ~F52-3824 OPERATING STATUS I UdtN . Turke Point Unit No. 4 Notes - Unit No. 4 operated

2. Reporting Period:

at approximately 100K R.P.

3. Licensed Thermal Power (MWt): 2200
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

e 646

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit (Gross MRe) has been rerated to the most restricted seasonal conditions summer ex erieaced. Maximum De endable Ca acit Net MMe has been rerated accordingly.

9. Power Level To Which Restricted. IfAny (Net MWe): NONE
10. Reasons For Restrictions, lfAny:

TMa Month Yr..to.Date Cumulative "I I. Hours In Reporting Period 744.0

12. Number Of Hours Reactor Was Critical 4 532nl
13. Reactor Reserve Shutdown Hours 12.3 -166.6 4 627.3
15. Unit Reserve Shutdown Hours 12.3 31.2 1 633 024 9 629 136 90 848 116
16. Gross Thermal Energy Generated (MWH)

~4282 la. Grass Eleerrirnl Energy Generereg (grlyHl

19. Unit Service Factor n e slssss 2 997 355 75.9 28 900 833 70.8
20. Unit Availability Factor 100.0 76.1 70.9
21. Unit Capacity Factor (Using MDC Net) 98. 6 75.1 69.0

~~. Unit Capacity Factor (Using DER Net) 92.0 70.0 64.1

23. Unit Forced Outage Rate 0.3 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

maintenance and ins ections >> Nov. 9 1980 - Jan. 10, 1981.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:

2&. Units ln Test Status l Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION Ig>/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980 S52-~

TELEPH0>K +30%t t

gr, I

C rl CO c o 2<

C ILI Liccoscc 0 V Cause h Corrective l)alc Vl 'a Q t$ r3 Z gee Event IA Action to 0~z Q

Report > cn'Cr 0 Prcvcnt Recurrcocc

~ CA N 0 N I

3 F: Forced Reason: hlethod:

S: Scl>edulcd Exhibit G - Instructions A.Equipment Failure (Explain) I.Manual for Preparation of Data II hlaintenance or Test 2.Manual Scram. Entry Sheets for Licensee C.Refueling. 3.Autotoatic Scraol. Evcot Report (LER) File (NUREG.

D.Regulatory Restriction 4ther (Explain) 016I )

L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)

Exhibit I - Salllc Sollrcc

('J/77) II Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY V. T. Chilson DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net) 7 17 794 18 673 796 19 787 777 20 786 77 725'83 792 791 790 791 95 782 10 26 757 798 37 << 759 797 2$ 781 718 >9 779 126 30 780 15 255 31 749 16 394 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth. C>>rnpute to thc nearest whole megawatt.

(o(77)

OPERATING DATA REPORT DOCKET NO. 'HL3Zi DATE R@~~980-COMPLETED BY T. Chilson TELEPHONE 552-3824 OPERATING STATUS I. Unit Name St. Lucie Unit No. 1 Notes - Unit operated at

2. Reporting Period:

approximately 100X R.P.,

3., Licensed Thermal Power (MWt):

2560 except for outages of Aug.

850 14, 14-15, and 16-18, 1980,

4. Nameplate Rating (Gross MWe}:

802 and reduced load operation S. Design Electrical Rating (Net MWe):

of Aug.14-18, 1980.

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Ca pacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):

IO. Reasons For Restrictions, lf Any:

This Month Yr..to-Date Cumulative I I. Hours In Reporting Period 744.0 5 855.0 32 399.0.

72 .0 4 2 2 l3. Reactor Reserve Shutdown Hours 129. 5

14. Hours Generator On-Line 701.4 3 889.7 24 719.7 IS. Unit Reserve Shutdown Hours 7.3 7.3 39.3 I 7. Gross Electrical Energy Generated (MWH) 551 240 3 101 490 1 395 990 IS. Net Electrical Energy Generated (MWH) 519 201 2 915 036 18 242 932 l9. Unit Service Factor 94.3 66.4 76.3
20. Unit Availability Factor 76.4 8 .8 64.1 72. 5
22. Unit Capacity Factor (Using DER Net) 87.0 62.1 70.2
23. Unit Forced Outage Rate '.4 Z4. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

'6. Units In Test Status I Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhtMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

No.l Page 1 of 2 80 iW!l 552-3824 cEI I I cA ~ Liccn sec C+Q C lh Cause Ec Corrective P Q Cl Vo. Date Vl rj Event Actiun lo CS Q E t" A ~co g Report > cn Cr O Prcvcnt Recurrcncc Cr 80-08-14 S 10.7 N/A TRANSP Unit was removed from service to isolate main power transformer No. 1B to repair oil leak. Cor-rective actions included installing new bushing. (Non-nuclear system) 12 80-08-14 B N/A TRANSP Load was limited to the capacity of main transformer No. 1A. (Non-nuclear system) 13 80-08-14 7.3 N/A TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B. (Non-nuclear system)

I 3 F: I'orccd Reason: hiethod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I-Manual I'or Preparation of Data B.hIaintenance oi Test- 2 hlanual Scratn. Entry Sheets I'or Licensee C.Refueling 3-Autotnalic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) OI6 I )

L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive 5 G-Operational Error (Fxplain) Exhibit I ~ Satne Source II.Other (Explain)

UNIT SIIUTDOWNS AND POWER REDUCTIONS . RL=335-UNIT NAME No.l COMPLETED BY 80 TELEPIIONE 305 552-382 Page 2 of 2 I

C r> ~J El ~ L 0 Liccoscc C<

II'J Cause k Corrective Nii. Date 0- a ~ A Event Action lo W~ Q t

O~AK J Rcport -" cn G 2Q Q Prevent Recurrcncc

~ C/l 14 80-08-17 24.6 B N/A EG TRANSP Unit was removed from service to install new bushing and return main power transformer No. 1B to service.

(Non-nuclear system)

I': Forced Rcasolt: hlethod: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) I -hianual for Preparation oi'Data 8 Maintenance or Test ~

2 hlanual Scram. Entry Sheets I'or Licensee C.Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) OI6I )

E Operator Training 8c Liccnsc Examination F.Administrative

., G Operational Error (Fxplain) Exhibit I - Sante SourlY.

('>/77) II.Other (Explaitt)

P.O. 3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September 6, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. chmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire e P' SER"ING P=QP'

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Se t. 6 1980 COMPLETED BY V.. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

- ~

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - '251 Turkey .Point UNIT Unit No. 4 DATE Se t. 6, 1980 COMPLETED BY V. T. Chilson TELEPHONE. (305) 552-3824 REPORT MONTH AUGUST 1980 Unit No. 4 operated at approximately 100%, R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Se t. 6 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for.ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.