The NRC recognizes that National Oceanic and Atmospheric Administration (NOAA) regulations are applicable to the renewal of federal licenses for activities not previously reviewed by the state (15 CFR 930.51(b)(1)). Please explain how a certification contained in a letter from the FDEP to the USACE dated March 9, 2012 is a basis for  
The NRC recognizes that National Oceanic and Atmospheric Administration (NOAA) regulations are applicable to the renewal of federal licenses for activities not previously reviewed by the state (15 CFR 930.51(b)(1)). Please explain how a certification contained in a letter from the FDEP to the USACE dated March 9, 2012 is a basis for  


your coastal zone consistency determination for this second license renewal.  
your coastal zone consistency determination for this second license renewal.
: 2. Aquatic Resources (A)
: 2. Aquatic Resources (A)
A-4 Please submit the following documents on the NRC docket.  
A-4 Please submit the following documents on the NRC docket.
: 1. FPL Turkey Point Cooling Canal System Characterization Study, December 2016.  
: 1. FPL Turkey Point Cooling Canal System Characterization Study, December 2016.
: 3. Water Resources (WR)
: 3. Water Resources (WR)
WR-13 For the NRC's federal licensing action (issuance of renewed operating licenses), provide documentation of Clean Water Act (CWA) 401 certification from the State of Florida to FPL. In Section 9.5.3.2 of the ER it is stated that PTN has fulfilled the regulatory requirement to provide certification by the state. The ER references a 401 certification  
WR-13 For the NRC's federal licensing action (issuance of renewed operating licenses), provide documentation of Clean Water Act (CWA) 401 certification from the State of Florida to FPL. In Section 9.5.3.2 of the ER it is stated that PTN has fulfilled the regulatory requirement to provide certification by the state. The ER references a 401 certification  


letter from the Florida Department of Environmental Protection to the U.S. Army Corps of Engineers dated March 9, 2012, which does not appear to be related to renewal of FPL's NRC operating licenses for Turkey Point, Units 3 and 4. Further documentation is needed to support NRC's review.}}
letter from the Florida Department of Environmental Protection to the U.S. Army Corps of Engineers dated March 9, 2012, which does not appear to be related to renewal of FPL's NRC operating licenses for Turkey Point, Units 3 and 4. Further documentation is needed to support NRC's review.}}

Revision as of 06:33, 25 April 2019

Requests for Additional Information for the Environmental Review of the Turkey Point Subsequent License Renewal Application - Set 2
ML18198A274
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/2018
From: James L M
Division of Materials and License Renewal, NRC/NRR/DMLR/MRPB
To: Nazar M
Florida Power & Light Co
Lois James
References
EPID L-2018-LNE-0001
Download: ML18198A274 (3)


Text

1 James, Lois From: James, Lois Sent: Tuesday, July 17, 2018 1:13 PM To: 'Mano.Nazar@NextEraEnergy.com' Cc: RidsNrrDmlr Resource; RidsNrrDmlrMrpb Resource; RidsNrrDmlrMenb Resource; RidsNrrDmlrMphb Resource; RidsNrrDmlrMccb Resource; 'RidsNrrDmlrMvib.Resource@nrc.gov'; RidsNrrPMTurkeyPoint Resource; Edmonds, Yvonne; Lent, Susan; James, Lois; Oesterle, Eric; Beasley, Benjamin; Wilson, George; Donoghue, Joseph; Wentzel, Michael; Turk, Sherwin; Burnell, Scott; Hannah, Roger; Ledford, Joey; Decker, David; Pelchat, John; Pressley, Lundy; Orr, Dan; Lea, Edwin; Bowen, Jeremy; Burton, William; Cooper, Paula; Adams, Darrell; Musser, Randy; Reyes, Rogerio; Burkhart, Lawrence; Wachutka, Jeremy; Young, Mitzi; Fairbanks, Carolyn;

'Steve.Franzone@fpl.com'; 'William.Maher@fpl.com'; 'Richard.Orthen@fpl.com';

'jonathan@we-count.org'; 'kalson-vince@monroecounty-fl.gov';

'harper.cecelia@epa.gov'; 'zcosner@gmail.com'; 'Itamayo@cleanenergy.org';

'albert@icassemblies.com'; 'knelson@fkaa.com';

'lreynolds@conservationconceptsllc.o rg'; 'grantham.tiffany@gmail.com';

'laurasue@silvernightingale.com'; 'marshmaid@gmail.com'

Subject:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE ENVIRONMENTAL REVIEW OF THE TURKEY POINT SUBSEQUENT LICENSE RENEWAL APPLICATION - SET 2 (EPID NO.

L-2018-LNE-0001) - CORRECTED ADAMS ACCESSION NUMBER Attachments:Final Environmental RAIs Set 2 enclosure.pdf

Dear Mr. Nazar:

By letters dated January 30, 2018, (Agencywide Do cuments Access and Management System (ADAMS)

Acces sion No. ML18037A812), February 9, 2018 (ADAMS Ac cession No. ML18044A653), February 16, 2018 (ADAMS Acces sion No. ML18053A123), Marc h 1, 2018 (ADAMS Access ion No. ML18072A224), and April 10, 2018 (ADAMS Accession Nos. ML18102A521 and ML18113A132), Florida Power & Light Company (FPL) submitted an application for subsequent li cense renewal of Renewed Facility Operating Lic ense Nos.

DPR-31 and DPR-41 for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point) to the U.S.

Nuclear Regulatory Commission (NRC) pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, and part 54 of title 10 of t he Code of Federal Regulations, "Requirements for renewal of operating licenses for nuclear power plants".

The NRC staff is reviewing the information contained in the subsequent license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Steve Franzone and Rick Orthen of your staff, and a mutually agreeable date for the response is within 30 days from the date of this e-mail. If y ou have any questions, please contact me by e-mail Lois.Jame@nrc.gov. Sincerely, Lois James, Senior Project Manager License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation 50-250 and 50-251 2

Enclosure:

Requests for Additional Information

cc w/encl: Listserv

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE ENVIRONMENTAL REVIEW OF THE TURKEY POINT SUBSEQUENT LICENSE RENEWAL APPLICATION - SET 2 (EPID NO.

L-2018-LNE-0001)

DISTRIBUTION (additional names):

Ms. Sarah Cody, Chief Office of Historic Preservation Stephen P. Clark Center 111 NW 1st St. - 12th Floor Miami, FL 33128 Ms. Stephanie A. Bryan, Tribal Chair Poarch Band of Creek Indians 5811 Jack Springs Road Atmore, AL 36502 Mr. James Floyd, Principal Chief Muscogee (Creek) Nation Office of the Administration P.O. Box 580 Okmulgee, OK 74447 Mr. Timothy Parsons State Historic Preservation Officer Florida Department of State 500 South Bronough Street R.A. Gray Building Tallahassee, FL 32399-0250 Ms. Carolyn White Acting Tribal Historic Preservation Officer Poarch Band of Creek Indians 5811 Jack Springs Road Atmore, AL 36502 Mr. Theodore Isham Tribal Historic Preservation Officer Seminole Nation of Oklahoma P.O. Box 1498 Wewoka, OK 74884 Mr. Billy Cypress, Chairman Miccosukee Tribe of Indians of Florida Tamiami Station P.O. Box 440021 Miami, FL 33144 Mr. Greg Chilcoat, Principal Chief Seminole Nation of Oklahoma P.O. Box 1498 Wewoka, OK 74884 Mr. Paul Backhouse Tribal Historic Preservation Officer Seminole Tribe of Florida Ah-Ta-Thi-Ki Museum 30290 Josie Billie Hwy, PMB 1004 Clewiston, FL 33440 Andrew Carter Miami Waterkeeper 2103 Coral Way, 2nd Floor Miami, FL 33145 Caroline McLaughun National Parks Conservation Association 450 N. Part Rd, Ste 301 Hollywood, FL 33021 Kelly Cox Miami Waterkeeper 2103 Coral Way, 2nd Floor Miami, FL 33145 Arnuni Kapur Duke Energy 410 S. Wilmington St. Raleigh, NC 27602 Wendy Brainard, citizen John Marquardt, citizen Patricia Marin, citizen Felipe Marin, citizen Erik Gonzales, citizen Matt Schwartz, citizen Gabriel Ignetti, citizen George Cavros, citizen Yvonne Knowles, citizen ADAMS Accession No.: ML18198A274 *concurrence via e-mail OFFICE PM:MRPB:DMLR BC:MENB:DMLR BC:MRPB:DMLR PM:MRPB:DMLR NAME LJames BBeasley* EOesterle* LJames DATE 07/09/2018 07/09/2018 07/09/2018 07/17/2018 OFFICE RECORD COPY

Enclosure TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 (TURKEY POINT) SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA) REQUESTS FOR ADDITIONAL INFORMATION (RAIS)

SET 2 1. Land Use (LU)

LU-1 As explained in the ER, the Federal Coastal Zone Management Act (CZMA) requires applicants for a federal license to certify to the licensing agency that the proposed activity would be consistent with the state's federally approved coastal zone management program. Regulations require the license applicant to provide its certification to the federal licensing agency and a copy to the applicable state agency.

Section 9.5.10 of the ER, Coastal Zone Management Act, states:

FPL received confirmation of coastal zone certification in a letter dated

March 9, 2012, from the FDEP [Florida Department of Environmental Protection]

to the USACE (FDEP 2012). The operating agreement between the FDEP and participating agencies identifies the final order issued as part of the PPSA [Florida Power Plant Siting Act] as the CZMA consistency for the authorized power plant. Therefore, [Turkey Point] has fulfilled the regulatory requirement to certify to the licensing agency that the proposed activity would be consistent with the state's federally approved coastal zone management program.

The NRC recognizes that National Oceanic and Atmospheric Administration (NOAA) regulations are applicable to the renewal of federal licenses for activities not previously reviewed by the state (15 CFR 930.51(b)(1)). Please explain how a certification contained in a letter from the FDEP to the USACE dated March 9, 2012 is a basis for

your coastal zone consistency determination for this second license renewal.

2. Aquatic Resources (A)

A-4 Please submit the following documents on the NRC docket.

1. FPL Turkey Point Cooling Canal System Characterization Study, December 2016.
3. Water Resources (WR)

WR-13 For the NRC's federal licensing action (issuance of renewed operating licenses), provide documentation of Clean Water Act (CWA) 401 certification from the State of Florida to FPL. In Section 9.5.3.2 of the ER it is stated that PTN has fulfilled the regulatory requirement to provide certification by the state. The ER references a 401 certification

letter from the Florida Department of Environmental Protection to the U.S. Army Corps of Engineers dated March 9, 2012, which does not appear to be related to renewal of FPL's NRC operating licenses for Turkey Point, Units 3 and 4. Further documentation is needed to support NRC's review.