MONTHYEARML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML21278A3092021-10-0606 October 2021 Acceptance of Requested Licensing Action Regarding Amendment to Revise 120-Volt AC Vital Instrument Panel Technical Specification Requirements ML21266A0412021-09-17017 September 2021 SLR Application Accepted-email to FPL ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21039A1932021-01-19019 January 2021 NRC Acceptance Review: St Lucie, Units 1 and 2 - License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC ML21012A3652021-01-0808 January 2021 Acceptance Review for Point Beach ML21035A0172020-12-11011 December 2020 NRC Acceptance Review: St Lucie, Unit 2- RR 15 - Extension of St. Lucie, Unit 2 RPV Welds from 10 to 20 Years ML21036A2422020-03-12012 March 2020 NRC Acceptance Review: St Lucie 2 LAR for RCS Pressure/Temperature Limits and LTOP Applicable for 55 EFPY ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19324C5772019-11-19019 November 2019 NRC Acceptance Review: St Lucie 2 Flywheel LAR ML17310A1072017-11-13013 November 2017 Acceptance of Requested Licensing Action - License Amendment Request 287, Application to Adopt 10 CFR 50.69 (CAC Nos. MG0196 and MG0197; EPID L-2017-LLA-0284) ML17292A0812017-10-23023 October 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Application to Adopt 10CFR 50.69, Risk-Informed Categorization and Treatment of Sscs for Nuclear Power Plants. ML17268A2542017-10-0606 October 2017 Turkey Point Nuclear Plant, Units 3 and 4 - Supplemental Information Needed for Acceptance of License Amendment Request 255 for the Relocation of the Requirements for Explosive Gas Monitoring, Gas Decay Tanks, and Standby Generator Feed Pumps ML17237A0282017-08-28028 August 2017 Acceptance of Requested Licensing Action - Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML17222A1952017-08-10010 August 2017 Supplemental Information Needed for Acceptance Review of Requested Licensing Action Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 ML16158A0182016-06-10010 June 2016 Acceptance of Requested Licensing Action Request to Extend Containment Leakage Test Frequency ML16029A1722016-02-0101 February 2016 Acceptance of Requested Licensing Action Regarding the Use of Gothic Computer Code Vacuum Analyses ML15281A2292015-11-0505 November 2015 Acceptance Review of Relief Request 10, Revision 0, Concerning Control Element Drive Mechanism Welds - Fourth 10-Year Interval ML15223B2042015-08-24024 August 2015 Acceptance of Requested Licensing Action Regarding Removal the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank from Technical Specifications and Relocated to License-Controlled Documents (TAC Nos. MF6488-89) ML15195A0692015-07-27027 July 2015 Acceptance of Proposed Licensing Amendment Request Regarding the Addition of a Note to Technical Specification Surveillance Requirement 4.4.1.3.4 ML14245A2042014-09-0909 September 2014 Acceptance of Proposed Licensing Amendment Request Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML14245A1892014-09-0909 September 2014 Acceptance of Proposed Licensing Amendment Request Regarding the Increase to the Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML14232A6222014-09-0909 September 2014 Acceptance of Requested Licensing Amendment Request and Exemption Regarding Revised Reactor Coolant System Pressure-Temperature Limits ML14198A4202014-08-0808 August 2014 Acceptance of Requested Licensing Amendment Request Regarding Cyber Security Plan Implementation Schedule (Tac No. MF4447) ML14210A3972014-07-28028 July 2014 NRR E-mail Capture - Acceptability Review of the Relief Request No 16 (MF4340) ML14210A4252014-07-23023 July 2014 NRR E-mail Capture - Acceptability Review of the Relief Request No. 6 (MF336) ML14085A3622014-04-0101 April 2014 Acceptance Letter Regarding Request for Relief 3IR-6 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping ML14118A2442014-03-19019 March 2014 E-mail Re. Acceptance Review: PSL2 Amendment, 10-year ISI Snubber Surveillance ML13262A3742013-11-22022 November 2013 Acceptance Letter Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML13267A0372013-09-25025 September 2013 Acceptance Review of Licensing Action License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML13169A2962013-06-18018 June 2013 Acceptance Review Concerning License Amendment Request to Adopt NFPA-805, Performance-Based at Standard for Fire Protection for Light Water Reactor Electric Generating Plants, ML13098A1152013-04-11011 April 2013 Acceptance Letter Regarding License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. ML13066A1582013-03-20020 March 2013 Acceptance Letter Regarding License Amendment Request 13-01, Application for Administrative Change and Corrections to the Technical Specifications ML12277A0222012-10-10010 October 2012 Acceptance of License Amendment Request for National Fire Protection Association Standard NFPA-805 ML12201A3642012-07-19019 July 2012 Acceptance Review License Amendment Request Supporting Cyber Security Plan Implementation Schedule Change ML12178A6282012-06-29029 June 2012 Acceptance Letter Regarding License Amendment Request 12-03, Proposed Change to Cyber Security Plan Implementation Schedule Milestone 6 ML12116A0302012-04-24024 April 2012 NRR E-mail Capture - ME8300 - LIC-109 Amendment Acceptance Review Results - Acceptable ML1135604092011-12-28028 December 2011 Acceptance Letter Regarding License Amendment Request 11-06, Application to Revise the Applicability of the Reactor Coolant System Pressure-Temperature Limits and the Cold Overpressure Protection Setpoints ML1130817932011-11-0404 November 2011 Find Application for Amendment Re. Alternative Testing of Safety/Relief Valves Acceptable for Review Per LIC-109 ML1130800452011-11-0303 November 2011 Acceptance Review - One-Time Exemption Request 10 CFR 26.205(d)(3) - Work Hour Controls ML1125004162011-09-0707 September 2011 E-mail, Miller to O'Keefe, Seabrook Relief Requests 2IR-17, 2IR-18, 2IR-19, and 2IR-20 Acceptance Review ML1123109812011-08-19019 August 2011 Acceptance Review ISI Third Ten-Year Interval Relief Request No. 12 ML1121502302011-08-0303 August 2011 E-mail, Miller to O'Keefe, Seabrook LAR 11-03 Acceptance Review 2023-05-04
[Table view] Category:E-Mail
MONTHYEARML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report 2024-01-05
[Table view] |
Text
From: Justin Poole (He/Him)
To: Phillabaum, Jerry; Mack, Jarrett; Mack, Kenneth Cc: Hipo Gonzalez
Subject:
POINT BEACH; SEABROOK; ST. LUCIE PLANT; AND TURKEY POINT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI AUTHORIZING IMPLEMENTATION OF ASME CODE CASE N-752-1 Date: Wednesday, April 19, 2023 10:57:00 AM
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2; SEABROOK STATION, UNIT NO. 1; ST. LUCIE PLANT, UNIT NOS. 1 AND 2; AND TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI AUTHORIZING IMPLEMENTATION OF ASME CODE CASE N-752-1 By letter dated March 15, 2023 (ADAMS Accession No. ML23074A155), NextEra Energy Point Beach, LLC/NextEra Energy Seabrook, LLC/Florida Power & Light Company submitted a relief request for Point Beach Nuclear Plant, Units 1 and 2; Seabrook Station, Unit No. 1; St. Lucie Plant, Units Nos. 1 and 2; and Turkey Point Generating Unit Nos. 3 and 4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> to complete. The NRC staff expects to complete this review by April 19, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and
unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Justin C. Poole Project Manager FitzPatrick/Seabrook/NextEra Fleet NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048