EPID:L-2019-LLA-0271, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (Approved, Closed) |
|
MONTHYEARL-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2019-12-0606 December 2019 License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. Project stage: Request ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) Project stage: RAI L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor2020-06-0808 June 2020 Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor Project stage: Response to RAI L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2020-11-0505 November 2020 Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors Project stage: Supplement ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) Project stage: Approval 2020-05-01
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 2024-09-06
[Table view] |
Text
From: Brown, Eva Sent: Friday, May 1, 2020 9:10 AM To: Mack, Jarrett; Hanek, Olga
Subject:
FINAL: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271)
[FPL: L-2019-203]
Attachments: Final 0271 EAL RAI Input.docx
- Jarrett, By letter dated December 6, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19343A373), Florida Power & Light Company requested U.S.
Nuclear Regulatory Commission (NRC) approval for an emergency action level (EAL) scheme change for the Turkey Point Nuclear Plant, Units 3 and 4. The NRC staff has determined that the attached additional information is needed to complete its review of the proposed amendment.
On April 30, 2020, you indicated that a response would be provided to the NRC within 30 days.
Thanks.
Eva Brown Senior Project Manager, Turkey Point Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Telephone: (301) 415-2315 Fax: (301) 415-1222
Hearing Identifier: NRR_DRMA Email Number: 558 Mail Envelope Properties (MN2PR09MB527481CEDF970FFEDD3D01C7EFAB0)
Subject:
FINAL: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) [FPL: L-2019-203]
Sent Date: 5/1/2020 9:09:48 AM Received Date: 5/1/2020 9:09:00 AM From: Brown, Eva Created By: Eva.Brown@nrc.gov Recipients:
"Mack, Jarrett" <Jarrett.Mack@fpl.com>
Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>
Tracking Status: None Post Office: MN2PR09MB5274.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 833 5/1/2020 9:09:00 AM Final 0271 EAL RAI Input.docx 44997 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUESTS FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST EMERGENCY ACTION LEVEL SCHEME CHANGE TURKEY POINT NUCLEAR PLANT, UNITS 3 AND 4 DOCKET NUMBERS 50-250 AND 50-251 By letter dated December 6, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19343A373), Florida Power & Light Company (FPL) requested U.S. Nuclear Regulatory Commission (NRC) approval for an emergency action level (EAL) scheme change for the Turkey Point Nuclear Plant, Units 3 and 4 (Turkey Point). The NRC staff has reviewed the submittal and determined that additional information is needed to complete the review, as indicated in the request for additional information (RAI) below.
Regulatory Requirements/Background The requirements of Section 50.47(b)(4) to Title 10 of the Code of Federal Regulations (10 CFR) state, in part, that:
A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee...
The most recent industry EAL scheme development guidance is provided in the Nuclear Energy Institute (NEI) document NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 6 (ADAMS Accession Number ML12326A805). By letter dated March 28, 2013, the NRC endorsed NEI 99-01, Revision 6, as acceptable generic (i.e., non-plant-specific) EAL scheme development guidance. FPL proposed to revise the current Turkey Point EAL scheme to one based on NEI 99-01, Revision 6.
The proposed EAL RU1.1 threshold values for unusual event classifications have substantially changed from the currently approved EAL threshold values for Turkey Point. Considering that the NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5 (ADAMS Accession No. ML080450149), guidance for RU1.1 is similar to the guidance provided by NEI 99-01, Revision 6, the proposed changes in values should be justified. The NRC staff could not determine a valid reason for the setpoint changes based on the information provided in the proposed EAL scheme change.
The threshold values for RU1.1 are intended to address a low-level radiological release that exceeds regulatory commitments for an extended time. Appendix A, Basis for Radiological Effluent EALs, of NEI 99-01, Revision 5, Section A.4 discusses the usage of Offsite Dose Calculation Manual (ODCM) values as threshold values for RU1. This attachment is still applicable to NEI 99-01, Revision 6.
Justify the proposed Turkey Point RU1.1 threshold values. This justification should include a discussion as to how the proposed RU1.1 values are reasonably close to a 2 times the radiation alarm setpoints, as calculated in the ODCM, for each of the proposed release points.
The proposed Table R-1, Unit [1 or 2, as applicable] Effluent Monitor Classification Thresholds, that is used for RA1.1, RS1.1, and RG1.1 have eliminated threshold values based on main steam line radiation monitors. FPL did not provide a justification that supports the removal of the main steam line and steam jet air ejector radiation monitor threshold values for RA1.1, RS1.1, and RG1.1.
Justify the removal of the threshold values based on main steam line and steam jet air ejector radiation monitors from EALs RA1.1, RS1.1, and RG1.1.
The proposed Table R-1, have threshold values for RA1.1, RS1.1, and RG1.1 that have substantially changed from the current NRC approved threshold values. An explanation that supports the changes in values or changes in instrumentation was not provided.
Explain the changes to the threshold values and the changes in instrumentation the for RA1, RS1, and RG1.
The proposed threshold value for RA2.1 is not consistent with the guidance provided by NEI 99-01, Revision 6. FPL proposed replacing uncovery of irradiation fuel with imminent uncovery of irradiated fuel. FPL provided that the term imminent is consistent with the basis document. Although the term imminent is used in the basis document, it is used in reference to imminent damage rather than imminent uncovery.
Justify the use of imminent in the threshold value for RA2.1. This discussion should address Turkey Points ability to accurately determine whether irradiated fuel is uncovered or not as well as providing a clarification as to what imminent specifically means as applied to uncovery of irradiated fuel.
The proposed Containment High Range Monitor threshold values for CS1.2 and CG1.1 have substantially changed from the current threshold values. An explanation that supports the changes in values was not provided.
Explain the changes to Containment High Range Monitor threshold values for CS1.2 and CG1.1.
The proposed EAL CU3.1, contains the condition, due to the loss of RCS [reactor coolant system] cooling, which is not consistent with NEI 99-01, Revision 6. FPL provides that this wording is consistent with the generic basis. This difference could result in potential
misclassification for an event other than a loss of RCS cooling that leads to an unplanned RCS pressure increase. As this change could impact the timing of the declaration of CU3.1, this change could reasonably be considered as a deviation.
Therefore, justify including due to the loss of RCS cooling to the threshold value for the proposed EAL CA3.1.
For EAL SA1.1, Table S-1, AC [alternating current] Power Sources, appears to provide one offsite power source per unit. Considering that technical specification 3.8.1.1.a requires two offsite power sources. Describe how the required two offsite power sources per unit are reflected in Table S-1, and address how SA1.1 is accurately assessed regarding offsite power sources.
FPL proposes to deviate from a standard EAL scheme by eliminating the site-specific restoration time from the threshold value for EAL SG 1.1. The NRC staff does agree that, as stated in the proposed basis discussion for EALs SS 1.1 and SG 1.1, credit can be taken for any AC power source that has sufficient capability to operate equipment necessary maintain a safe shutdown condition, such as FLEX [Diverse and Flexible Mitigation Capability]
generators. Sufficient justification was not provided to justify that the existence of FLEX equipment and appropriate procedures to use that equipment supports the removal of the site-specific time to restore AC power. Additionally, the basis discussion that credit can be taken for any AC power source does not appear to be reflected in the threshold values for SS 1.1 and SG 1.1. The NRC staff notes that Emergency Preparedness Frequently Asked Question 2015-015, Consideration of listing site-specific power sources applicable for consideration for loss of power EALs, scope is limited to the identification of power sources and neither discusses or supports coping time changes.
- a. Explain what features, that are unique to Turkey Point, require a deviation from a standard EAL scheme or provide threshold values that are consistent with NEI 99-01, Revision 6, such that a general emergency would be declared for an extended loss of AC power concurrent with the inability to operate equipment necessary to maintain a safe shutdown condition.
- b. For SS 1.1 and SG 1.1, address the threshold values for EALs SS 1.1 and SG 1.1 that support crediting any AC power source that has sufficient capability to operate equipment necessary to maintain a safe shutdown condition, such as the FLEX generators.
The proposed threshold value for EAL SU4.1 appear to apply to conditions where the technical specifications allow continued operation for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> while the licensee makes attempts to restore either I-131 or Xe-133 concentrations to within the technical specification limits. The appropriateness of declaring a Notification of Unusual Event when the Technical Specification Limiting Condition for Operation (LCO) is met was not provided; especially when the LCO allows continued operation at full power for an extended time.
Explain how EAL SU4.1 will be accurately declared for conditions which indicate a potential degradation of the level of safety of the plant that is consistent with the declaration of a Notification of Unusual Event emergency classification.
The proposed Turkey Point basis discussion provides that a reactor shutdown is determined in accordance with applicable Emergency Operating Procedure (EOP) criteria. The Westinghouse nuclear power plant Reactor Trip or Safety Injection and the Response to Nuclear Power Generation/Anticipated Transient Without Scram (ATWS) EOPs typically provide that a successful reactor trip exists when all rods are inserted, and neutron flux is decreasing. Additionally, typical Critical Safety Function Status Trees provide that either a reactor power of greater than five percent or intermediate range power increasing is an indication that the reactor is not shutdown and that implementation of the Response to Nuclear Power Generation/ATWS procedure is required. , Emergency Action Level Scheme Comparison Matrix, for SU6.1, SA6.1, and SS6.1 provides that the Turkey Point Critical Safety Function Status Tree Subcriticality Red Path criteria defines a successful shutdown based on reactor power being less than 5 percent. As noted above, 5 percent is only one criterion that requires implementation of the Response to Nuclear Power Generation/ATWS procedure.
The NRC staff notes that the reactor protective system is designed to place the reactor in a subcritical position. As such, relying solely on an indication of 5 percent power is not indicative of a failure of an automatic or manual trip failing to shut down the reactor. Explain how the SU6.1, SA6.1, and SS6.1 threshold value of 5 percent power is used to indicate that a reactor is shutdown when typical Westinghouse plant EOPs use all rods inserted and neutron flux decreasing in addition to reactor power.