Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML20315A018
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/10/2020
From: Randy Musser
NRC/RGN-II/DRP/RPB3
To: Moul D
Florida Power & Light Co
References
Download: ML20315A018 (7)


Text

November 10, 2020 Mr. Don Moul Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 -

NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Moul:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4 during the weeks of March 8-12, 2021 and March 22-26, 2021. The inspection team lead has not been finalized as of this letter, however, when the team lead has been determined that individual will reach out to your staff.

This inspection will be conducted in accordance with the baseline inspection procedure (IP),

71152, Problem Identification and Resolution (ADAMS Accession No. ML14316A042).

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On November 3, 2020, Mr. Lundy Pressley, Senior Project Engineer, confirmed with Ms. Stavroula Mihalakea, Nuclear Licensing Engineer, of Florida Power and Light (FPL),

arrangements for the two-week inspection.

In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing, the NRC inspection team is prepared to conduct this inspection accordingly. Therefore, in support of this inspection some, or all, of the inspection team may perform their reviews, with minimal onsite staff interaction, or remotely, as conditions allow.

The NRC inspection team requests that your staff be prepared to support these efforts.

Additionally, the inspection team is open to any suggestions regarding communications and coordination such that the overall effort from both the NRC inspection team and FPL support staff may be the most efficient while also prioritizing public health and safety.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than February 26, 2021. This request is being submitted early to allow sufficient time for your staff to adequately plan and process this request. However, all information provided to the team for review should be sensitive to the date of the inspection and updated with information that is no later than January 31, 2021.

2 Until an inspection team lead is selected you may contact Mr. Pressley or the resident inspectors with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, NRC staff will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; and if necessary: working space and arrangements for site access; and other applicable information.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Pressley at (404) 997-4621 or the resident inspectors.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Information Request for Turkey Point PI&R Inspection cc: Distribution via ListServ

ML20315A018 OFFICE RII/DRP RII/DRP NAME L. Pressley R. Musser DATE 11/9/2020 11/10/2020 INFORMATION REQUEST FOR TURKEY POINT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (MARCH 8-12, 2021 AND MARCH 22-26, 2021)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since July 1, 2018. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral process If any of the procedures requested above were revised after July 1, 2018, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
3. List of all Action Requests initiated including the following information or each AR:

a) AR number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) AR completion status If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel example shown below) and ensure the list is searchable and can be filtered by system.

AR # Problem Priority System Component Org Status AR001 A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

2

4. List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)

c) Brief, but complete corrective action description d) Associated AR number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel, example shown below) and ensure the list is searchable and can be filtered by system.

Corrective Type Description AR System Initiation Extensions Due Status Action # Date Date 001 CAPR Revise AR0058 RHR 01/05/20 2 06/15/20 Awaiting Procedure CARB NGK-003-4585 review

5. List of control room deficiencies with a brief description and corresponding AR and/or work order (WO) number.
6. List of operator workarounds and operator burdens with a brief description and corresponding AR number, searchable and filtered by system.
7. List of all currently extended or overdue ARs, searchable and filtered by system and sorted by initiation date, with the following information:

a) AR number b) Priority or Significance c) AR title and short description

8. List of all ARs that have been voided, cancelled, or deleted searchable and filtered by system. Please provide the following information for each AR:

a) AR number b) Brief, but complete problem description c) Reason voided, cancelled, or deleted

3

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since January 2018. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status

10. List of Maintenance Preventable Functional Failures (MPFF) of risk-significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel, example shown below) and ensure the list is searchable and can be filtered by system.

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/20 03/15/20 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including ARs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Please include a cross-reference linking NRC finding numbers and LIVs to appropriate AR numbers.
13. Corrective action closeout packages, including ARs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate AR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g.,

AR number) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
16. Copies of all department self-assessments.

4

17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend reports, including any human performance and equipment reliability trends.
18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of ARs initiated by department, human performance errors by department, and others as may be available.
19. Please provide a list of routine meetings involving the CAP to be held while team is onsite.
20. List of ARs related to equipment aging issues in the top ten risk- significant systems since January 1, 2016 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification). Please provide the following information for each AR:

a) AR number b) Priority c) AR problem description

21. If performed, please provide any recent self-assessment of the site safety culture completed.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description.
24. Copy of Probabilistic Risk Assessment importance measures report, if available.
25. System health reports, system design basis documents, and system description information upon notification of system selections.