NRR E-mail Capture - Acceptance Review: Turkey Point - Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology
ML21154A086
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/25/2021
From: Ellen Brown
NRC/NRR/DORL/LPL2-2
To: Mack J
Florida Power & Light Co
References
L-2021-LLA-0070
Download: ML21154A086 (3)


Text

From: Brown, Eva Sent: Tuesday, May 25, 2021 3:34 PM To: Mack, Jarrett Cc: Wrona, David

Subject:

ACCEPTANCE REVIEW : Turkey Point - Update Listing of Approved LOCA Methodologies to Adopt FULL SPECTRUM LOCA Methodology (EPID: L-2021-LLA-0070)

Mr. Mack, By letter dated April 15, 2021, Florida Power & Light Company (FPL) submitted a license amendment for Turkey Point Nuclear Plant Units 3 and 4 related to the Update of the Listing of Approved LOCA Methodologies to Adopt FULL SPECTRUM LOCA Methodology. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately one year from the acceptance of your application, which should be in May 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delays may occur if the submittal is provided to the NRC in advance of or in parallel with industry program initiatives or pilot applications.

If you have any questions, please feel free to contact me.

Eva Brown Senior Project Manager, Turkey Point Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Telephone: (301) 415-2315 Fax: (301) 415-1222

Hearing Identifier: NRR_DRMA Email Number: 1215 Mail Envelope Properties (DM6PR09MB48055D3454544994214C585CEF259)

Subject:

ACCEPTANCE REVIEW : Turkey Point - Update Listing of Approved LOCA Methodologies to Adopt FULL SPECTRUM LOCA Methodology (EPID: L-2021-LLA-0070)

Sent Date: 5/25/2021 3:34:04 PM Received Date: 5/25/2021 3:34:00 PM From: Brown, Eva Created By: Eva.Brown@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com>

Tracking Status: None Post Office: DM6PR09MB4805.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2978 5/25/2021 3:34:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: