Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARL-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal2021-09-22022 September 2021 Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal Project stage: Request ML21265A3712021-09-22022 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request ML21265A3852021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling Operations Project stage: Request ML21265A3812021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS) Project stage: Request ML21265A3822021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems Project stage: Request ML21265A3702021-09-22022 September 2021, 23 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request ML21265A3802021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS) Project stage: Request ML21265A3772021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control Systems Project stage: Request ML21265A3792021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, Instrumentation Project stage: Request ML21265A3842021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems Project stage: Request PMNS20211440, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-11-0808 November 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications Project stage: Request ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review L-2022-010, License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response Project stage: Supplement NUREG-1431, Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 52022-02-0303 February 2022 Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) Project stage: Meeting ML22054A1382022-02-16016 February 2022 February 24, 2022 ITS Public Meeting Material - Florida Power and Light Project stage: Meeting PMNS20220139, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-02-23023 February 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensees Responses to ITS Conversion LAR and RAIs Project stage: Meeting PMNS20220112, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-02-23023 February 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220236, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-03-11011 March 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220321, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-0505 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220427, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-27027 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests Project stage: Meeting PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests Project stage: Meeting ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) Project stage: Other ML22263A0122022-09-27027 September 2022 Summary of August 29, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests (EPID Nos. L-2021-LLI-0000 and L 2021 Lli 0002) Project stage: Meeting PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS Project stage: RAI ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests Project stage: Meeting PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests Project stage: Meeting PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting 2022-05-17
[Table View] |
Text
From:
Michael Mahoney Sent:
Monday, November 7, 2022 1:30 PM To:
Maher, William
Subject:
Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS Attachments:
Request for Additional Information - Turkey Point ITS LAR.pdf
Dear Mr. Maher,
By letter dated September 22, 2021 (ML21265A370) as supplemented by letters dated January 19, 2022 (ML22019A067) and March 30, 2022 (ML22089A195), Florida Power & Light Company (the licensee) submitted a license amendment request (LAR) to revise the Turkey Point Nuclear Generating Unit Nos. 3 and 4 current Technical Specifications (CTS) to Improved Technical Specifications (ITS) consistent with Improved Standard Technical Specifications in NUREG 1431, Standard Technical Specifications - Westinghouse Plants, Revision 5.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has identified areas where additional information is needed to complete its review.
As discussed, response to the attached RAIs are requested no later than 30 business days from todays date.
The NRC staff considers that timely responses to RAIs help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me.
Once this email is added to ADAMS I will provide the accession number.
Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov
Hearing Identifier:
NRR_DRMA Email Number:
1823 Mail Envelope Properties (SA1PR09MB94867AF5404C5AB04FCDD4EAE53C9)
Subject:
Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS Sent Date:
11/7/2022 1:29:46 PM Received Date:
11/7/2022 1:29:49 PM From:
Michael Mahoney Created By:
Michael.Mahoney@nrc.gov Recipients:
"Maher, William" <William.Maher@fpl.com>
Tracking Status: None Post Office:
SA1PR09MB9486.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1459 11/7/2022 1:29:49 PM Request for Additional Information - Turkey Point ITS LAR.pdf 129634 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Page 1 of 5 TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 REQUEST FOR ADDITIONAL INFORMATION IMPROVED TECHNICAL SPECIFICATIONS CONVERSION DOCKET NO. 50-250 AND 50-251 By letter dated September 22, 2021 (ML21265A370) as supplemented by letters dated January 19, 2022 (ML22019A067) and March 30, 2022 (ML22089A195), Florida Power & Light Company (the licensee) submitted a license amendment request (LAR) to revise the Turkey Point Nuclear Generating Unit Nos. 3 and 4 current Technical Specifications (CTS) to Improved Technical Specifications (ITS) consistent with Improved Standard Technical Specifications in NUREG 1431, Standard Technical Specifications - Westinghouse Plants, Revision 5.
To complete its review of the proposed LAR, the U.S. Nuclear Regulatory Commission staff requests the following additional information:
Regulatory Basis Section (c) of 10 CFR 50.36, Technical specifications, states the technical specifications (TS) will include, among other things, safety limits, limiting safety system settings, and limiting control settings.
10 CFR 50.36, paragraph (c)(1)(ii)(A) Safety limits, limiting safety system settings, and limiting control settings, states, in part, that, Limiting safety system settings for nuclear reactors are settings for automatic protective devices related to those variables having significant safety functions.
Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded.
Where a limiting safety system setting (LSSS) is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded.
If, during operation, it is determined that the automatic safety system does not function as required, the licensee shall take appropriate action, which may include shutting down the reactor.
Technical Specifications Task Force (TSTF) traveler TSTF-493, Revision 4 (April 23, 2010, with errata January 2011) was developed to provide a basis for licensees to address whether
Page 2 of 5 instrument Function channels identified as having limiting safety system settings (LSSSs) were functioning as required during instrument channel calibration and functional testing surveillances. This traveler was developed in part in response to the staffs clarification of the requirements in 10 CFR 50.36(c) through issuance of Regulatory Issue Summary (RIS) 2006-17 NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specifications, Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels. TSTF-493 describes how licensees may revise their plant-specific TS by explicitly specifying the current implicit testing requirements for applicable instrument Functions identified as having LSSSs, by establishing As-Found and As-Left Tolerance limits on the channels trip or actuation setting meeting acceptance criteria as described in the RIS.
Requests for Additional Information (RAI)
The following questions are regarding proposed changes in Revision 1 of the Turkey Point ITS conversion LAR, volume 8 of enclosure 2 (ITS Section 3.3).
Background for RAI-1 The licensee proposes to apply TSTF-493, Clarify Application of Setpoint Methodology for LSSS Function Option A - Addition of [surveillance] Notes 1 and 2 to the Agreed Upon Functions, as part of its request to revise its CTS to ITS based on NUREG-1431, Revision 5.
The Standard Technical Specifications (STS) include Option A of TSTF-493.
Surveillance Note 1 of TSTF-493, Option A, discusses the application of an as-found tolerance (AFT). Surveillance Note 2 of TSTF-493, Option A, also discusses the application of a predetermined AFT band about the limiting trip setpoint (LTSP), the nominal trip setpoint (NTSP), or the actual as-left field setting of the surveillance (Channel Calibration and Channel Operational Test). This surveillance as-left field setting must be within a predetermined as-left tolerance (ALT) band. Additionally, on page 7 of the front matter of the TSTF-493 traveler it states, in part, Implementation of [surveillance] Note 1 requires the licensee to calculate an as-found tolerance (limit).
In addition, the TSTF-493 traveler includes a Model Application for Adoption of TSTF-493 Option A (ML100710442), which states, in part, Additionally, to ensure proper use of the allowable value (AV), LTSP, and NTSP, the methodology for calculating the as-left and as-found tolerances must also be included in [the FSAR] [a document incorporated by reference in the FSAR] and listed in surveillance Note 2 as discussed in Section 3.1.2, below.
The NRC staff noted while reviewing Turkey Point Units 3 and 4s UFSAR, Section 7.2.2, System Design, the subsection for Setpoint Methodology discusses WCAP-17070 (whose scope and NRC approval was limited to the instruments impacted by the 2012 extended power update (EPU) license amendment).
As part of an information exchange with the NRC staff related to the ITS conversion request for Turkey Point, the licensee stated in its response to NRC question number MEH003 on the
Page 3 of 5 Certrec Portal that several protective functions use the methodology described in WCAP-12745, Rev. 0, 1990, and Rev. 1, 1996, as the instrument channel performance uncertainty/setpoint methodology of record. When the NRC staff reviewed the WCAP-12745 report, the staff found that the terms AFT and ALT, along with other terms clarifying the use and application of the setpoint and LSSS related terms in RIS 2006-17, are not described. It appears that the WCAP-12745 methodology states that the method used to determine whether the channel is functioning as required uses only the non-conservative direction of channel drift towards the AV, and not the two-sided comparison of the as-measured value against the bi-directional rack calibration accuracy term, as described in WCAP-17070. Further, it is not clear whether the magnitude of this error limit includes or does not include the same terms identified within the RIS or within the approved WCAP-17070.
The NRC staff needs information to understand how the licensee is implementing the proposed surveillance Notes 1 and 2 of TSTF-493, Option A for determining whether an instrument channel is functioning as required (as described in Option A of TSTF-493), since WCAP-12745 does not define these terms, (i.e., similar to how they have been established and described in WCAP-17070). If the licensee plans to use WCAP-12745 to identify how the channels will be determined to be functioning as required during a channel surveillance, the NRC staff expects that the licensees setpoint methodology for establishing and maintaining LSSS functional limits will clearly define how the key terms of ALT and AFT are established and used as surveillance acceptance criteria for the instrument Functions having an associated LSSS. Meeting this expectation will enable use of Notes 1 and 2 to reach a determination of acceptability for the application of TSTF-493 Option A for those associated instrument Functions.
RAI-1
Given the NRC staffs information needs described above, the license is requested to provide the following information for the LSSS instrument Functions specified by ITS Subsections 3.3.1 and 3.3.2:
- a. A revised channel performance uncertainty evaluation methodology for TS related instrument Functions that are not within the scope of WCAP-17070, clearly describing how the as-found tolerance (AFT), as-left tolerance (ALT), Nominal Trip Setpoint (NTSP, or NSP), Safety Analysis Limit (SAL), Channel Statistical Allowance (CSA), Margin, Total Allowance (TA) and allowable value (AV) are defined and how each term relates to other terms, and how they are to be used in relation to the surveillance Notes (b) and (c) proposed to be included in ITS Tables 3.3.1-1 and 3.3.2-1, that are consistent with the definitions used in TSTF-493 Option A, and with RIS 2006-17.
- b. Summaries of channel performance uncertainty calculations for instruments not within the scope of WCAP-17070 demonstrating how the use of the terms in Item a. above still ensures that the total allowance (TA) includes a positive margin beyond the CSA but still within the SAL.
- c. Based on information exchanged with the licensee, in some cases it appears that at least two setpoint methods have been applied to a single instrument. Explain why it is
Page 4 of 5 acceptable to use two different setpoint methods for a single instrument (e.g., Power Range Neutron Flux - High setpoint and Low setpoint).
- d. Description of information related to the updated channel performance uncertainty methodology provided by the licensee in above Item a that will be added into the appropriate section of the UFSAR, as was the case for the WCAP-17070 methodology.
If the licensee does not plan to revise and resubmit the WCAP-12745 methodology topical report, then the UFSAR description should be sufficiently detailed to describe the technical relationships of how the AFT and ALT acceptance criterion described in the Tech Spec Table footnotes will be applied when using the specific values and terms that appear in WCAP-12745 where AFT and ALT do not appear. The UFSAR description should describe how the specific terms in WCAP-12745 are to be combined or derived to develop values for AFT and ALT that is consistent with the footnotes in the Tech Spec tables and the concepts within RIS 2006-17 and TSTF-493 Option A.
Background for RAI-2 and RAI-3 Since 1992 in Revision 0 of NUREG-1431, Table 3.3.1-1 and Table 3.3.2-1 have included a Reviewers Note regarding the [Nominal] Trip Setpoint column, which states: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.
In NUREG-1431 Rev. 5, STS Bases pages B 3.3.1-3 and B 3.3.2-3 include the following statement:
[Note: Alternatively, a Technical Specification format incorporating an Allowable Value only column may be proposed by a licensee. In this, case, the [NTSP] value and the methodologies used to calculate the as-found and as-left tolerances must be specified in [insert the name of a document controlled under 10 CFR 50.59 such as the Technical Requirements Manual or any document incorporated into the facility FSAR]. Changes to the actual plant trip setpoint or [NTSP] value would be controlled by 10 CFR 50.59 or administratively as appropriate, and adjusted per the setpoint methodology and applicable surveillance requirements.]
RAI-2
The licensee is requested to provide a technical explanation of how the setpoint study methodologies of record in WCAP-12745 Revisions 0 and 1, and WCAP-17070, Revision 1, justify omitting the Trip Setpoint column for the instrument Functions having LSSS values in ITS Table 3.3.1-1 and Table 3.3.2-1, while retaining the Allowable Value column in these tables. In addition, if the setpoint column is removed, and the existing methodologies are not applicable to all relocated setpoints, describe the programmatic controls that will be in place that would prevent those setpoints from being changed under licensee control via 10 CFR 50.59.
RAI-3
Page 5 of 5 In ITS Subsections 3.3.4, 3.3.5, and 3.3.6, the licensee proposed to remove trip setpoint values from the current TS while retaining the current TS allowable values in the ITS. These changes are described in the removed detail discussions of change (designated as LA DOCs).
Specifically, the changes and their justifications are in LA01 (ITS 3.3.4), LA02 (ITS 3.3.5), and LA02 (ITS 3.3.6). The details in all three LA DOCs are similar; however there are references in the DOCs that are either not specific or appear inapplicable to these ITS subsections. For example, there are references to NRC-approved power uprate amendments that do not appear to affect the instrumentation Functions in ITS Subsections 3.3.4, 3.3.5, and 3.3.6. Also, references to Regulatory Guide 1.105 and industry standard ANSI/ISA-RP67.04 do not have revision numbers; this is vital as each revision has varying content. The licensee is requested to revise these DOCs to provide only relevant justification for removal of trip setpoint values, and include revision numbers of the applicable regulatory guidance and industry standard documents to which it is committed in the current licensing basis for Turkey Point Units 3 and 4.