ML17208A513: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/07/1978
| issue date = 10/07/1978
| title = Monthly Operating Repts for Sept 1978
| title = Monthly Operating Repts for Sept 1978
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turke Point UNIT COMPLETED gY V.T.Chi ls<n I L (I TELEPHONE Llll5l=MONTH SEPTEMBER 197S DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 7 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 I8 IO l3 IS!6 60 660 58 652 657 660 665 663 659 l9 20 2l 22 25 26 27 28 a9 30 310 6 2 450 260 624 0 660 56 it tt I li;r ts INSTRUCTIONS On this format.list the average daily unit power level tn LiDVe Nct for each day in thc reporting month.Compute to the nearest whole niegaivat t.(or77)8004840 ggyI OPERATING STATUS OPERATING DATA REPORT DOCKET NO.50 250 DATE~~2,78 COhlPLETED BY~~hj3.son TELEPHONE~~3824 728 I.Unit iVame: Turkey Point Unit iVo.3 2.Reporting Period: S tembe 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hlWe): iVotes-Unit No.3 operated a approximately 100/.R.P.ex-cept for outage of Sept.18-19 1978, and load reductions of Sept.22-23, and 23-24,1978.
{{#Wiki_filter:AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net hOVe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.to-Date Cumulative 720.0 6 551.0 707.7 4 946.6 ll.Hours In Reporting Period 12.i umber Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 9.6 83.5 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours 17.Gross Electrical Energy Generated (MWH)469 785 3 313 410 18.iVet Electrical Energy Generated (MWH)446 134 3 135 529 19.Unit Service Factor 98.3 75.5 20.Unit Availability Factor 100.0 75.5 71.9 22.Unit Capacity Factor (Using DER Net)89.4 69.1 23.Unit Forced Outage Rate-0-1.1 24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): 51" 032.6 194.6 39 033.0 24 597 755 23 282 179 76.5 76.7 69.1 65.8 2.6 Harch 4 1979.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status{Prior to Commercial Operation):
Turke     Point UNIT I
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hION'fll~SZXQJ55 1978 I it No.3 DATF Oct.7 1978 COMPI.ETED DY Ihtc fP A c c ec u<c>>CA Licensee Event Report c CC u u g O cn 6 c 0 c Q c E~O Cause Ec Corrective Acliun lo Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No.3 Mas removed from service to perform integrated safeguards surveillance test.(Nuclear system)22 78-09-22-0-N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear sys tern)23 78-08-23 N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear system)I F: Forccrl S: Schcdolcd (9/77)Reason: A.Erluipmcnt Failure (Explain)8 hlaintcnance oi Test C Refueling D Regulatory Restriction li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain)I I Otlfcr (Explain)3 hlclhod: I hlauual 2 hlanual Scram.3 Automatic Scram.4.Other (Lxplain)Exltibil G-Instructions for Preparatloll ul Data Entry Sltccts I'or Licensee Event Report (LERI Flic INURI'.G-OI6 I)Exlribit I~Saruc Source ,<<',~,<<i~>~',"~~',~'i~~~>><<ia~"-."~i>>'I"'.<<': i 8<<.w
COMPLETED gY       V. T. Chi ls<n     L (I
TELEPHONE     Llll5l=
MONTH       SEPTEMBER             197S DAY       AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (M We-Net)                                                     (MWe-Net)
I                            7                                17 659                                  I8 60                                 l9                       310 20 it 2l                       6  2                          tt I
22 li 660                                                            450                            ;r ts 58                                                          260 25                       624 IO                          652                                  26                           0 657                                  27                       660 660                                  28 l3                          665                                  a9                         56 663                                  30 IS                          659
!6 INSTRUCTIONS On this format. list the average daily unit power level tn LiDVe Nct for each day in thc reporting month. Compute to the nearest whole niegaivat t.
(or77) 8004840 ggyI


AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.50-25 1 DATE Ot~.7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILY POWER LEVEL (hI We.Nct)'AY AVERAGE DAILY POWER LEVEL (hIWe-iVct) l7 I8 l9 20 2l 22 IO l3 l4 IS l6 84 25 26 2 f 2$'i9 30 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth.Cumput<<to the nearest whole megawatt.I')177 l OPERATING DATA REPORT OPERATING STATUS ev Point Unit No.4 o0 728 I.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (iIWt): 4.iVamepiate Rating (Gross Mme): S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum'Dependable Capacity (iVet MWe): DOCKET NO.DATE Qcr~78 COMPLETED OY~~hilson TELEPHOiVE 430S3~-3824 Notes-Una.t No.4 scheduled refueling, maintenance, and inspections continued during month.Initial reactor crit cality following completion of refueling was accompli'she on September 28, 1978.~g~'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To'iVhich Restricted, lf Any (Net MWe): 10.Reasons For Restrictions, lf Any: 5 i Yr..to.Date This Month 720.0 I I.Hours In Reporting Period 12., Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (M'IVH)17.Gross Electrical Energy Generated (hlWH)IS.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using I(DC Net)"".Unit Capacity Factor (Using DER Net)~D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 876.5 54.7-0--0-'-0--0-3 028 155 2 865 454-3 210 73.4 73.4 65.7-0--0-63.1-0-0.1 (Type.Date, and Duration of Each): Cumulative 32 349.4 138.8-0-20 852 080 19 761 939 6.1 66.8 63.7 2.9 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
OPERATING DATA REPORT DOCKET NO. 50 250 DATE COhlPLETED BY
October 1, 1978 Forecast Achieved IN ITIA L CR ITICA LITY INITIAL ELFCTRICITY COMMERCIAL OPERATION ('>/77)
                                                                                                        ~~2,78
UNIT SIIUTDOWNS AND POWER REDUCTIONS gEpppTgpNm SEPTppBER 1978 COh(PLETED BY lit No.4 Ns).Dare~A I.~I I'vl rl Cl a, c 5rx!r<c~C/l Llceiiscc Event Report ir C tt 0 Cl'n Vl cn G C 0 c Q E~O Cr Cailsc k, Corrective Acllilil lo Prcvelil Rceurrcrlec 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No.4 was removed from service for scheduled refueling, maintenance, and inspections.(Continued f rom previous month)(Nuclear and non-nuclear systems)I F: Forced S: Scheduled ('t/17)Reason: A-Er(uipmcnt Failure (Explain)8 htalntcnancc oi Test C-Refueling D Rcyilatory Restriction L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive G Operational Error (Lxplain)I I Other (Explain)htcthod: I-hlanual 2-h(anual Scram.3-Aulolualic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation tf Data Entry Sheets lor Licensee Event Rcport (LL'R)File (NURL'G.016 l)5 Exliibil I-Saine Source 4'r-4~
                                                                                                        ~~hj3.son TELEPHONE    ~~3824 OPERATING STATUS Turkey Point Unit        iVo. 3          iVotes - Unit No. 3 operated a I. Unit iVame:                                                            approximately 100/. R.P. ex-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.S t.Lucre DATE Oct.7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)DAY AVERAGE DAlLY POWER LEVEL (LIIWe.Nct) 782 17 10 12 13 15 16 INSTRUCTIONS 351 77 777 778 778 779 767 773 IS 19 20 21 22 23 25 26'l9 30 NOTE: 783 778 741 782 769 764 765~760 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.'is ,r I-0~4'r I~o o tt II tt ll I: I j;it~j On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth.
: 2. Reporting Period:            S  tembe 2200 cept for outage of Sept.18-19
Compute to the nearest whole megawatt.I<)/77)
: 3. Licensed Thermal   Power (MWt):                                        1978, and load reductions of 728
: 4. Nameplate Rating (Gross MWe):                                           Sept. 22-23, and 23-24,1978.
S. Design Electrical Rating (Net hlWe):
: 8. IfChanges  Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   If Any (Net hOVe):            NONE
: 10. Reasons For Restrictions, If Any:
This Month            Yr. to-Date         Cumulative ll. Hours In Reporting Period                                 720.0            6  551.0            51"  032.6
: 12. i umber Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                             9.6                83.5                  194.6
: 14. Hours Generator On-Line                                  707. 7          4  946.6            39  033.0 IS. Unit Reserve Shutdown Hours
: 17. Gross Electrical Energy Generated (MWH)                 469 785          3 313    410        24 597 755
: 18. iVet Electrical Energy Generated (MWH)                   446 134          3 135 529            23 282 179
: 19. Unit Service Factor                                       98.3                75.5                  76.5
: 20. Unit Availability Factor                                 100.0                75.5                  76.7 71.9                  69. 1
: 22. Unit Capacity Factor (Using DER Net)                       89.4                69.1                  65.8
: 23. Unit Forced Outage Rate                                                     1.1                    2.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration       of Each):
Harch 4     1979.
: 25. IfShut Down At End Of Report Period. Estimated Date       of Startup:
: 26. Units ln Test Status { Prior to Commercial Operation):                       Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION


OPERATING DATA REPORT DOCKET NO.DATE Q~f~f[78 COhIPLETED GY~~son TELEPHONE X2RB~-3824 OPERATING STATUS l.Unit Name: 2.Reportfng Period: Se tember 1978 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 5.Design Electrical Rating (Net MIVe): 6.Maximum Dependable Capacity (Cross MWe): 7.hlaximum Dependable Capacity (Net hIWe): 2560 850 802 822 777 Notes-Unit operated at ap-prox'.mately 100K R.P.afrer main power transformer Vo.lA was returned to service on September 3, 1978.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This hlonth Yr.to Date Cumulative 2 32.0'118.5 12 525.8 21.0 29 630 204 9 621 060 9 041 725 80.4 80.6 74.7 72.4 6.9 er 3, 1978 I I.Hours In Reporting Period 12.Number Of Hours Reactor'IVas Critical 13.Reactor Reserve Shutdown Hours 16.9 14.Hours Generator On.Line 4 844.0 15.Unit Reserve Shutdown Hours 11.7 21.0 11 780 990 17.Gross Electrical Energy Ccnerated (MWH)558 870 3 826 300 18.Net Electrical Energy Generated (MWH)5 27.35 7 3 599 148 19.Unit Service Factor 98.4 73.9 20.Unit Avaiiability Factor 100'74~3 70.7 22.Unit Capacity Factor (Using DER Net)91.3 68.5 23.Unit Forced Outage Rate-0-1.4 24.Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each): am Generator Tube Insnection Pro ram-October 30-Decemb 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
UNIT SHUTDOWNS AND POWER REDUCTIONS Oct. 7  1978 I it No.3 DATF COMPI.ETED DY REPORT hION'fll ~SZXQJ55                  1978 fP A                                      c c    Licensee        uCCu          c0                                Cause    Ec Corrective Ihtc                                          Event          gO              Q  c                                    Acliun lo c  ec E~
Forecast Achieved INITIA L CR ITICA LITY INITIAL ELECTRICITY COhIMERCIAL OPERATION UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.50 335 UNITNAhIE No.1 REPORThIONfI>>
                                                >>u<CA c    Report  c      cn  6            O                                Prcvcnl Recurrence 21        78-09-18            12.3      B                  N/A                          ZZZZZZ          Unit No. 3 Mas removed from service to perform integrated safeguards surveillance test. (Nuclear system) 22        78-09-22                                      N/A            HC          HTEXCH          Load    reduction to locate and repair (D)            condenser      tube leak. (Non-nuclear sys tern) 23        78-08-23                                          N/A            HC          HTEXCH          Load    reduction to locate and repair (D)            condenser      tube leak. (Non-nuclear system)
SEPTEHBER, 1978 Nii.Date I I Ul fl Cl M~-n V~cc u<a~Vl Q Liccnscc Event Report rr C C~e a~>E(3 0 CJ Cause h.Corrective Action lo Pfcvcrll Recllrrerrcc 18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No.1B.(Continued from previous month)(Non-nuclear system)78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No.1A.(Continued from previous month)(Non-nuclear system)20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal.(Non-nuclear system)F: Forced S: Scheduled (9/77)Reason: A Equipmcnt Failure (Expiaio)8 hlainlcnance oi Test C Rcfucling D Regrdatory ltestrtclton E.Operator Training h.Iiccnsc Examination F.Administ wlivc G.Opcraliooal Error (Explain)II.Other (Explain)hicthod: I.hianual 2.hianual Scram.3-Aufonmlic Scram.4-Other (Explaut)Exhibit G-Instructions for Prcparalio>>
I                                                                      3 F: Forccrl        Reason:                                                hlclhod:                                              Exltibil G - Instructions S: Schcdolcd      A.Erluipmcnt Failure (Explain)                        I  hlauual                                            for Preparatloll ul Data 8 hlaintcnance oi Test                                2 hlanual Scram.                                      Entry Sltccts I'or Licensee C Refueling                                            3 Automatic Scram.                                    Event Report (LERI Flic INURI'.G-D Regulatory Restriction                              4.Other (Lxplain)                                      OI6 I )
of Data Entry Sheets lor Lieensec Event lteporl (LL'R)Fiie I YUltEG.0!6I)5 Exllibit I-Sarrre Source i+I cLORIOA?0"VER 5 uGHI'Qi"I?A."A October 7, 1978 Office of Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555~~C Gentlemen:
li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain)                                                                              Exlribit I Saruc Source
Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, D.Schmia Vice President Power Resources~4 I'I;~~tl-C VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire 4  
                                                                                                                                                ~
(9/77)                I I Otlfcr (Explain)
                                                                          ,<<', ~,<<i ~ > ~
                                                                                          ',"  ~ ~
                                                                                                    ',~ '
i~~ ~ >><< ia ~ "-  ."
                                                                                                                                ~ i>> 'I    "'. <<':    i 8<<. w
 
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.        50  -  25 1 DATE    Ot~. 7, 1978 COMPLETED BY SEPTEMBERr            1978 DAY        AVERAGE DAILYPOWER LEVEL                            'AY        AVERAGE DAILYPOWER LEVEL (hI We.Nct)                                                    (hIWe-iVct) l7 I8 l9 20 2l 22 84 25 IO                                                              26 2f 2$
l3                                                              'i9 l4                                                              30 IS l6 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth. Cumput<< to the nearest whole megawatt.
I') 177 l
 
OPERATING DATA REPORT DOCKET NO.
DATE Qcr COMPLETED OY
                                                                                                              ~78
                                                                                                      ~~hilson TELEPHOiVE 430S3        ~-3824 OPERATING STATUS
                                                                                                                      ~g ev  Point Unit No.      4            Notes- Una.t No. 4      scheduled I. Unit Name:
: 2. Reporting Period:
refueling, maintenance, and                    ~
o0                inspections continued during
: 3. Licensed Thermal Power (iIWt):
: 4. iVamepiate Rating (Gross Mme):                     728              month.      Initial    reactor    crit cality    following completion S. Design Electrical Rating (Net MWe):                                of refueling was accompli'she                    '.
: 6. Maximum Dependable Capacity (Gross MWe):                            on September 28, 1978.
: 7. Maximum'Dependable Capacity (iVet MWe):
IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
5 i
: 9. Power Level To 'iVhich Restricted, lfAny (Net MWe):
: 10. Reasons For Restrictions,  lf Any:
This Month          Yr..to.Date            Cumulative I I. Hours In Reporting Period                              720.0 12., Number Of Hours Reactor Was Critical                    54.7        4 876.5                32 349.4
: 13. Reactor Reserve Shutdown Hours 138.8
: 14. Hours Generator On. Line                                  IS. Unit Reserve Shutdown Hours
                                                              '                                      16. Gross Thermal Energy Generated (M'IVH)                    17. Gross Electrical Energy Generated (hlWH)                              3 028 155              20 852 080 IS. Net Electrical Energy Generated (MWH)
                                                      -  3 210            2 865 454              19 761 939
: 19. Unit Service Factor                                                        73.4                    6  .1
: 20. Unit Availability Factor                                                  73.4
: 21. Unit Capacity Factor (Using I(DC Net)                                  65.7                    66.8
"". Unit Capacity Factor (Using DER Net)                                   63.1                    63.7
~D. Unit Forced Outage Rate                                                0.1                      2.9
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
: 25. If Shut Down At End Of Report Period. Estimated Date    of Startup:  October 1, 1978
: 26. Units ln Test Status (Prior to Commercial Operation):                    Forecast              Achieved IN ITIAL CR ITICALITY INITIALELFCTRICITY COMMERCIAL OPERATION
('>/77)
 
UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                            lit No.4 SEPTppBER            1978          COh(PLETED BY gEpppTgpNm I'        a,                                    C Llceiiscc  0 tt'n          c0                  Cailsc k, Corrective
                                    ~ A                                    C I                                          Cl vl Ns).          Dare            .~
I            rl Cl cr<5rx!c        Event    Vl G
Q E~
Acllilillo Report ir  cn                O                  Prcvelil Rceurrcrlec
                                                ~  C/l Cr 7S-08-13 S        720.0                            N/A    zz              ZZZZZZ  Unit No. 4 was removed from            service for scheduled refueling, maintenance, and inspections.      (Continued f rom previous month)      (Nuclear and non-nuclear systems)
I F: Forced          Reason:                                            htcthod:                              Exhibit G - Instructions S: Scheduled      A-Er(uipmcnt Failure (Explain)                      I -hlanual                            for Preparation tf Data 8 htalntcnancc oi Test                            2-h(anual Scram.                      Entry Sheets lor Licensee C-Refueling                                        3-Aulolualic Scram.                    Event Rcport (LL'R) File (NURL'G.
D Rcyilatory Restriction                          4.Other (Explain)                      016 l )
L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive                                                                      5 G Operational Error (Lxplain)                                                            Exliibil I - Saine Source
('t/17)                I I Other (Explain) 4'  r- 4 ~
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
S t. Lucre DATE  Oct. 7, 1978 COMPLETED BY                      on MONTH        SEP TEI IBE R,        19 78 DAY      AVERAGE DAILYPOWER LEVEL                              DAY      AVERAGE DAlLYPOWER LEVEL (MWe.Net)                                                    (LIIWe.Nct) 17                      782 351                                IS                      783 19                                                      is
                                                                                                                        ,r 20                                                      I-0
                                                                                                                        ~4 21                                                      'r I~
22                      778                            o o
77                                  23 tt II tt ll 777                                25                        741                            I:
I 10                          778                                                          782                            j; 26 778                                                          769 it 779
                                                                                                                        ~
j 12                                                                                      764 13                                                            'l9                      765 30                      ~
760 15                          767 16                          773 NOTE:       Average        daily power level greater than 777 Kfe due to cooler condenser cooling INSTRUCTIONS water.
On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth. Compute to the nearest whole megawatt.
I<)/77)
 
OPERATING DATA REPORT DOCKET NO.
Q~f~f[78 DATE COhIPLETED GY TELEPHONE
                                                                                                      ~~son X2RB ~-3824 OPERATING STATUS Notes -   Unit operated at ap-
: l. Unit Name:
prox'.mately     100K R.P. afrer
: 2. Reportfng Period:      Se tember      1978 main power transformer Vo.lA Licensed Thermal Power (MWt):                  2560
: 3.                                                                      was returned to service on
: 4. Namephte Rating (Gross MWe):                    850 September 3, 1978.
: 5. Design Electrical Rating (Net MIVe):            802
: 6. Maximum Dependable Capacity (Cross MWe):                  822
: 7. hlaximum Dependable Capacity (Net hIWe):                  777
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   If Any (Net MWe):
: 10. Reasons For Restrictions,   lf Any:
This hlonth         Yr. to Date           Cumulative I I. Hours In Reporting Period
: 12. Number Of Hours Reactor 'IVas Critical                                                           2  32.0
: 13. Reactor Reserve Shutdown Hours                                             16.9                   '118.5
: 14. Hours Generator On. Line                                               4 844.0               12 525.8
: 15. Unit Reserve Shutdown Hours                               11.7             21.0                    21.0 11 780 990             29 630 204
: 17. Gross Electrical Energy Ccnerated (MWH)                 558 870       3 826 300                 9 621 060
: 18. Net Electrical Energy Generated (MWH)                   5 27 .35 7   3 599 148                 9 041 725
: 19. Unit Service Factor                                       98.4             73.9                     80.4
: 20. Unit Avaiiability Factor                                 100 '             74 ~ 3                   80.6
: 70. 7                   74. 7
: 22. Unit Capacity Factor (Using DER Net)                       91.3             68.5                     72.4
: 23. Unit Forced Outage Rate                                                 1.4                     6.9
: 24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each):
am Generator Tube Insnection Pro ram                   - October 30 - Decemb   er 3,    1978
: 25. IfShut Down At End Of Report Period. Estimated Date     of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                     Forecast               Achieved INITIAL CR ITICALITY INITIALELECTRICITY COhIMERCIAL OPERATION
 
DOCKET NO.          50    335 UNIT SIIUTDOWNS AND POWER REDUCTIONS                       UNITNAhIE                           No. 1 REPORThIONfI>> SEPTEHBER,       1978 C
                                                                                    ~e Nii.         Date I I Ul
                                                ~-M n V Liccnscc Event C
a~>
Cause h. Corrective Action lo fl      ~ cc u<Vl a                              0E(3 Cl Report rr                                      Pfcvcrll Recllrrerrcc
                                                ~                                    CJ Q
18         78-08-30 S                                         N/A     EG       TRANS F     Load was limited to the capacity of main power transformer No. 1B.
(Continued from previous month) (Non-nuclear system) 78-08-31 S       5.3                             N/A     EG         TRANSF     Unit was removed from         service to pro-tect personnel using         a   crane to remove a faulty bushing from main power transformer No. 1A. (Continued from previous month) (Non-nuclear system) 20         78-09-02 S         6.4       B                     N/A     EG         TRANSF     Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal.             (Non-nuclear system)
F: Forced         Reason:                                          hicthod:                              Exhibit G - Instructions S: Scheduled       A Equipmcnt Failure (Expiaio)                     I.hianual                            for Prcparalio>> of Data 8 hlainlcnance oi Test                           2.hianual Scram.                      Entry Sheets lor Lieensec C Rcfucling                                       3-Aufonmlic Scram.                    Event lteporl (LL'R) Fiie I YUltEG.
D Regrdatory ltestrtclton                         4-Other (Explaut)                    0!6I )
E.Operator Training h. Iiccnsc Examination F.Administ wlivc                                                                   5 G.Opcraliooal Error (Explain)                                                           Exllibit I - Sarrre Source (9/77)                II.Other (Explain)
 
i+                         I cLORIOA ?0"VER 5 uGHI'Qi"I?A."A October 7, 1978
                                                                                ~ ~
C Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the September,   1978, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
I'
                                                                                ~4 Very truly yours, I;
                                                                                ~~
tl-D. Schmia                                                                     C Vice President Power Resources VTC/DDC cc:   Mr. James P. O'Reilly Robert Lowenstein, Esquire 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Oct.7, 1978 COMPLETED BY V.T.Chilson QEPORT MONTH SEPTEMBER, 19 78 TELEPHONE (305)552-3824)Unit operated at approximately 100$R.P.except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978.Refer to"Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.
OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT     Unit   No. 3 DATE     Oct. 7, 1978 COMPLETED BY     V. T. Chilson TELEPHONE     ( 305)   552-3824
No Major Safety-related maintenance was performed during the month.  
                                          )
QEPORT MONTH  SEPTEMBER,  19 78 Unit operated at approximately 100$ R.P. except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978. Refer to "Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.
No Major Safety-related maintenance was performed during the month.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO..50-251 Turkey Point Unit No.4 DATE Oct.7 1978 COMPLETED BY V.T.Chilson~~4~TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month.Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.Major Safety-related maintenance activities performed during the month included: Completed the Steam Generator Tube Inspection Program.Refer to Steam Generator Inspection Report of September 6, 1978, for additional information.
OF OPERATING EXPERIENCE DOCKET NO.   . 50 - 251 Turkey Point Unit No. 4 DATE     Oct. 7   1978 COMPLETED BY     V. T. Chilson   ~
4~
                                                                        ~
TELEPHONE       305   552-3824 QEPORT MONTH     SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month. Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.
Major Safety-related maintenance activities performed during the     g month included:                                                       1 Completed the Steam Generator Tube Inspection Program.
Refer to Steam Generator Inspection Report of September           I C
6, 1978, for additional information.
Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.
Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.
Completed modifications to charging system piping.g 1 C I
Completed modifications to charging system piping.
$UMMARY OF OPERATING EXPERIENCE
 
~4~~~~~KT DOCKET NO..50-335 cC it.il'C UNIT S t.Lucie nit N.1 QEPORT MONTH SEPTEMBER, 1978 DATE Oct.7 1978 COMPLETED BY V.T.i s TELEPHONE t~I'i I!Ig~i Unit operated at approximately 100%R.P.after main power trans-former No.1A was.returned to service on September 3, 1978.Major Safety-related maintenance performed during the month in-cluded inspection and repairs on charging pump No.1A.Refer to Licensee Event Report No.335-78-34 for additional details.Pi If~j l if~i t!}}
                                                                      ~ 4
                                                                      ~ ~
                    $ UMMARY OF OPERATING EXPERIENCE                 ~~
                                                                        ~
KT cC it
                                                                    .il
                                                                      'C DOCKET NO.. 50 335 S t. Lucie UNIT      nit N. 1 DATE     Oct. 7 1978 COMPLETED BY     V. T. i s t~
I I!
                                                                        'i TELEPHONE Ig i
QEPORT MONTH    SEPTEMBER,  1978                                  ~
Unit operated at approximately 100% R.P. after main power trans-former No. 1A was. returned to service on September 3, 1978.
Major Safety-related maintenance performed during the month in-Pi If cluded inspection and repairs on charging pump No. 1A. Refer to     ~
j Licensee Event Report No. 335-78-34   for additional details.
l if
                                                                    ~
i t!}}

Latest revision as of 15:09, 4 February 2020

Monthly Operating Repts for Sept 1978
ML17208A513
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/07/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A512 List:
References
NUDOCS 8004240444
Download: ML17208A513 (15)


Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

Turke Point UNIT I

COMPLETED gY V. T. Chi ls<n L (I

TELEPHONE Llll5l=

MONTH SEPTEMBER 197S DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (M We-Net) (MWe-Net)

I 7 17 659 I8 60 l9 310 20 it 2l 6 2 tt I

22 li 660 450 ;r ts 58 260 25 624 IO 652 26 0 657 27 660 660 28 l3 665 a9 56 663 30 IS 659

!6 INSTRUCTIONS On this format. list the average daily unit power level tn LiDVe Nct for each day in thc reporting month. Compute to the nearest whole niegaivat t.

(or77) 8004840 ggyI

OPERATING DATA REPORT DOCKET NO. 50 250 DATE COhlPLETED BY

~~2,78

~~hj3.son TELEPHONE ~~3824 OPERATING STATUS Turkey Point Unit iVo. 3 iVotes - Unit No. 3 operated a I. Unit iVame: approximately 100/. R.P. ex-

2. Reporting Period: S tembe 2200 cept for outage of Sept.18-19
3. Licensed Thermal Power (MWt): 1978, and load reductions of 728
4. Nameplate Rating (Gross MWe): Sept. 22-23, and 23-24,1978.

S. Design Electrical Rating (Net hlWe):

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net hOVe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr. to-Date Cumulative ll. Hours In Reporting Period 720.0 6 551.0 51" 032.6

12. i umber Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 9.6 83.5 194.6
14. Hours Generator On-Line 707. 7 4 946.6 39 033.0 IS. Unit Reserve Shutdown Hours
17. Gross Electrical Energy Generated (MWH) 469 785 3 313 410 24 597 755
18. iVet Electrical Energy Generated (MWH) 446 134 3 135 529 23 282 179
19. Unit Service Factor 98.3 75.5 76.5
20. Unit Availability Factor 100.0 75.5 76.7 71.9 69. 1
22. Unit Capacity Factor (Using DER Net) 89.4 69.1 65.8
23. Unit Forced Outage Rate 1.1 2.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Harch 4 1979.

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status { Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS Oct. 7 1978 I it No.3 DATF COMPI.ETED DY REPORT hION'fll ~SZXQJ55 1978 fP A c c Licensee uCCu c0 Cause Ec Corrective Ihtc Event gO Q c Acliun lo c ec E~

>>u<CA c Report c cn 6 O Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No. 3 Mas removed from service to perform integrated safeguards surveillance test. (Nuclear system) 22 78-09-22 N/A HC HTEXCH Load reduction to locate and repair (D) condenser tube leak. (Non-nuclear sys tern) 23 78-08-23 N/A HC HTEXCH Load reduction to locate and repair (D) condenser tube leak. (Non-nuclear system)

I 3 F: Forccrl Reason: hlclhod: Exltibil G - Instructions S: Schcdolcd A.Erluipmcnt Failure (Explain) I hlauual for Preparatloll ul Data 8 hlaintcnance oi Test 2 hlanual Scram. Entry Sltccts I'or Licensee C Refueling 3 Automatic Scram. Event Report (LERI Flic INURI'.G-D Regulatory Restriction 4.Other (Lxplain) OI6 I )

li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain) Exlribit I Saruc Source

~

(9/77) I I Otlfcr (Explain)

,<<', ~,< ~

'," ~ ~

',~ '

i~~ ~ >><< ia ~ "- ."

~ i>> 'I "'. <<': i 8<<. w

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO. 50 - 25 1 DATE Ot~. 7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILYPOWER LEVEL 'AY AVERAGE DAILYPOWER LEVEL (hI We.Nct) (hIWe-iVct) l7 I8 l9 20 2l 22 84 25 IO 26 2f 2$

l3 'i9 l4 30 IS l6 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth. Cumput<< to the nearest whole megawatt.

I') 177 l

OPERATING DATA REPORT DOCKET NO.

DATE Qcr COMPLETED OY

~78

~~hilson TELEPHOiVE 430S3 ~-3824 OPERATING STATUS

~g ev Point Unit No. 4 Notes- Una.t No. 4 scheduled I. Unit Name:

2. Reporting Period:

refueling, maintenance, and ~

o0 inspections continued during

3. Licensed Thermal Power (iIWt):
4. iVamepiate Rating (Gross Mme): 728 month. Initial reactor crit cality following completion S. Design Electrical Rating (Net MWe): of refueling was accompli'she '.
6. Maximum Dependable Capacity (Gross MWe): on September 28, 1978.
7. Maximum'Dependable Capacity (iVet MWe):

IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

5 i

9. Power Level To 'iVhich Restricted, lfAny (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr..to.Date Cumulative I I. Hours In Reporting Period 720.0 12., Number Of Hours Reactor Was Critical 54.7 4 876.5 32 349.4

13. Reactor Reserve Shutdown Hours 138.8
14. Hours Generator On. Line IS. Unit Reserve Shutdown Hours

' 16. Gross Thermal Energy Generated (M'IVH) 17. Gross Electrical Energy Generated (hlWH) 3 028 155 20 852 080 IS. Net Electrical Energy Generated (MWH)

- 3 210 2 865 454 19 761 939

19. Unit Service Factor 73.4 6 .1
20. Unit Availability Factor 73.4
21. Unit Capacity Factor (Using I(DC Net) 65.7 66.8

"". Unit Capacity Factor (Using DER Net) 63.1 63.7

~D. Unit Forced Outage Rate 0.1 2.9

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 1, 1978
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CR ITICALITY INITIALELFCTRICITY COMMERCIAL OPERATION

('>/77)

UNIT SIIUTDOWNS AND POWER REDUCTIONS lit No.4 SEPTppBER 1978 COh(PLETED BY gEpppTgpNm I' a, C Llceiiscc 0 tt'n c0 Cailsc k, Corrective

~ A C I Cl vl Ns). Dare .~

I rl Cl cr<5rx!c Event Vl G

Q E~

Acllilillo Report ir cn O Prcvelil Rceurrcrlec

~ C/l Cr 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No. 4 was removed from service for scheduled refueling, maintenance, and inspections. (Continued f rom previous month) (Nuclear and non-nuclear systems)

I F: Forced Reason: htcthod: Exhibit G - Instructions S: Scheduled A-Er(uipmcnt Failure (Explain) I -hlanual for Preparation tf Data 8 htalntcnancc oi Test 2-h(anual Scram. Entry Sheets lor Licensee C-Refueling 3-Aulolualic Scram. Event Rcport (LL'R) File (NURL'G.

D Rcyilatory Restriction 4.Other (Explain) 016 l )

L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive 5 G Operational Error (Lxplain) Exliibil I - Saine Source

('t/17) I I Other (Explain) 4' r- 4 ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

S t. Lucre DATE Oct. 7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (LIIWe.Nct) 17 782 351 IS 783 19 is

,r 20 I-0

~4 21 'r I~

22 778 o o

77 23 tt II tt ll 777 25 741 I:

I 10 778 782 j; 26 778 769 it 779

~

j 12 764 13 'l9 765 30 ~

760 15 767 16 773 NOTE: Average daily power level greater than 777 Kfe due to cooler condenser cooling INSTRUCTIONS water.

On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth. Compute to the nearest whole megawatt.

I<)/77)

OPERATING DATA REPORT DOCKET NO.

Q~f~f[78 DATE COhIPLETED GY TELEPHONE

~~son X2RB ~-3824 OPERATING STATUS Notes - Unit operated at ap-

l. Unit Name:

prox'.mately 100K R.P. afrer

2. Reportfng Period: Se tember 1978 main power transformer Vo.lA Licensed Thermal Power (MWt): 2560
3. was returned to service on
4. Namephte Rating (Gross MWe): 850 September 3, 1978.
5. Design Electrical Rating (Net MIVe): 802
6. Maximum Dependable Capacity (Cross MWe): 822
7. hlaximum Dependable Capacity (Net hIWe): 777
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This hlonth Yr. to Date Cumulative I I. Hours In Reporting Period

12. Number Of Hours Reactor 'IVas Critical 2 32.0
13. Reactor Reserve Shutdown Hours 16.9 '118.5
14. Hours Generator On. Line 4 844.0 12 525.8
15. Unit Reserve Shutdown Hours 11.7 21.0 21.0 11 780 990 29 630 204
17. Gross Electrical Energy Ccnerated (MWH) 558 870 3 826 300 9 621 060
18. Net Electrical Energy Generated (MWH) 5 27 .35 7 3 599 148 9 041 725
19. Unit Service Factor 98.4 73.9 80.4
20. Unit Avaiiability Factor 100 ' 74 ~ 3 80.6
70. 7 74. 7
22. Unit Capacity Factor (Using DER Net) 91.3 68.5 72.4
23. Unit Forced Outage Rate 1.4 6.9
24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each):

am Generator Tube Insnection Pro ram - October 30 - Decemb er 3, 1978

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CR ITICALITY INITIALELECTRICITY COhIMERCIAL OPERATION

DOCKET NO. 50 335 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNITNAhIE No. 1 REPORThIONfI>> SEPTEHBER, 1978 C

~e Nii. Date I I Ul

~-M n V Liccnscc Event C

a~>

Cause h. Corrective Action lo fl ~ cc u<Vl a 0E(3 Cl Report rr Pfcvcrll Recllrrerrcc

~ CJ Q

18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No. 1B.

(Continued from previous month) (Non-nuclear system) 78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No. 1A. (Continued from previous month) (Non-nuclear system) 20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal. (Non-nuclear system)

F: Forced Reason: hicthod: Exhibit G - Instructions S: Scheduled A Equipmcnt Failure (Expiaio) I.hianual for Prcparalio>> of Data 8 hlainlcnance oi Test 2.hianual Scram. Entry Sheets lor Lieensec C Rcfucling 3-Aufonmlic Scram. Event lteporl (LL'R) Fiie I YUltEG.

D Regrdatory ltestrtclton 4-Other (Explaut) 0!6I )

E.Operator Training h. Iiccnsc Examination F.Administ wlivc 5 G.Opcraliooal Error (Explain) Exllibit I - Sarrre Source (9/77) II.Other (Explain)

i+ I cLORIOA ?0"VER 5 uGHI'Qi"I?A."A October 7, 1978

~ ~

C Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

I'

~4 Very truly yours, I;

~~

tl-D. Schmia C Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Oct. 7, 1978 COMPLETED BY V. T. Chilson TELEPHONE ( 305) 552-3824

)

QEPORT MONTH SEPTEMBER, 19 78 Unit operated at approximately 100$ R.P. except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978. Refer to "Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.

No Major Safety-related maintenance was performed during the month.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. . 50 - 251 Turkey Point Unit No. 4 DATE Oct. 7 1978 COMPLETED BY V. T. Chilson ~

4~

~

TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month. Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.

Major Safety-related maintenance activities performed during the g month included: 1 Completed the Steam Generator Tube Inspection Program.

Refer to Steam Generator Inspection Report of September I C

6, 1978, for additional information.

Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.

Completed modifications to charging system piping.

~ 4

~ ~

$ UMMARY OF OPERATING EXPERIENCE ~~

~

KT cC it

.il

'C DOCKET NO.. 50 335 S t. Lucie UNIT nit N. 1 DATE Oct. 7 1978 COMPLETED BY V. T. i s t~

I I!

'i TELEPHONE Ig i

QEPORT MONTH SEPTEMBER, 1978 ~

Unit operated at approximately 100% R.P. after main power trans-former No. 1A was. returned to service on September 3, 1978.

Major Safety-related maintenance performed during the month in-Pi If cluded inspection and repairs on charging pump No. 1A. Refer to ~

j Licensee Event Report No. 335-78-34 for additional details.

l if

~

i t!