{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 23, 2015 LICENSEE:       Union Electric Company (Ameren Missouri)
-0001 February 23, 2015 LICENSEE:
FACILITY:       Callaway Plant, Unit 1
Union Electric Company (Ameren Missouri
)    FACILITY:
Callaway Plant, Unit 1


==SUBJECT:==
==SUBJECT:==


SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT
==SUMMARY==
, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicant's RAI responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1
OF TELEPHONE CONFERENCE CALL HELD ON MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)
, license renewal application
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicants RAI responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1, license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view.
. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view
.
The applicant had an opportunity to comment on this summary.
The applicant had an opportunity to comment on this summary.
    /RA/ John Daily
                                                /RA/
, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.
John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483
50-483


==Enclosures:==
==Enclosures:==
: 1. List of Participants
: 1. List of Participants
: 2. Summary of the Discussion cc w/encls: Listserv
: 2. Summary of the Discussion cc w/encls: Listserv


ML14281A365
ML14281A365                                             *concurred in person OFFICE LA:RPB1:DLR             PM:RPB1:DLR       BC:RPB1:DLR         PM:RPB1:DLR NAME       *YEdmonds           JDaily             YDiaz-Sanabria       JDaily DATE       11/3/14             2/19/15           2/19/15             2/23/15
    *concurred in person OFFICE LA:RPB1:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME *YEdmonds JDaily YDiaz-Sanabria JDaily DATE 11/3/14 2/19/15 2/19/15 2/23/15 ENCLOSURE 1  SUMMARY OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS May 12, 2014  PARTICIPANTS AFFILIATIONS John Daily U.S. Nuclear Regulatory Commission (NRC)
Bill Holston NRC John Wise NRC James Medoff NRC Dave Shafer Union Electric Company (Ameren Missouri)
Roger Wink Ameren Missouri Sharon Merciel Ameren Missouri Mike Hoehn  Ameren Missouri Andrew Burgess Ameren Missouri Jerry Doughty Ameren Missouri Eric Blocher STARS Center of Business


ENCLOSURE 2 SUMMARY OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION May 12, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicant's Request for Additional Information (RAI) responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1, license renewal application
==SUMMARY==
. Discussion The staff and the applicant discussed the following three items, with points being made as indicated:
OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS May 12, 2014 PARTICIPANTS                AFFILIATIONS John Daily                  U.S. Nuclear Regulatory Commission (NRC)
Response to RAI 3.0.3
Bill Holston                NRC John Wise                  NRC James Medoff                NRC Dave Shafer                Union Electric Company (Ameren Missouri)
-2a, "Loss of Coating Integrity (Followup)."  Coatings response, baseline and turbulent conditions.
Roger Wink                  Ameren Missouri Sharon Merciel              Ameren Missouri Mike Hoehn                  Ameren Missouri Andrew Burgess              Ameren Missouri Jerry Doughty              Ameren Missouri Eric Blocher                STARS Center of Business ENCLOSURE 1
The staff identified one apparent minor gap in the applicant's RAI response dated May 6, 2014, regarding RAI 3.0.3-2a. The response does not appear to adequately discuss the inspections for turbulent conditions in its Open Cycle Cooling Water and Inspection of Internal Surfaces aging management programs (AMPs). The staff noted that LR
-ISG-2012-02 deals with inspections of a redundant train as a two
-step process:
  (1) that no peeling, delamination, blisters, or rusting are observed during inspections, that any cracking and flaking has been found acceptable in accordance with the "acceptance criteria" program element of the particular AMP, and that no cracking or spalling is found in cementitious coatings; and (2) that the train is not subject to turbulence.
Following some discussion the staff and the applicant agreed that the appropriate sections of the response could be made more clear by wording similar to:
  "-[Coatings are inspected every six years on an alternating train basis based on no observed degradation or cracking and flaking that has been evaluated as acceptable; and the component is not subject to turbulent flow]. Baseline inspections may be used to demonstrate that long
-term coatings are or are not subject to turbulent flow conditions that could result in mechanical damage to the coating
."    Response to RAI 3.3.2
-2a, "Submerged bolting, (Followup)."
The staff noted that in describing the opportunistic inspections of the submerged bolting, the response seems to allow for either an inspection of the bolt heads or an inspection of the bolt threads. The staff position is that whenever an opportunity presented itself to do so, the applicant would inspect the bolt threads
. The staff understood that bolt heads would receive their own opportunistic inspections, but the concern remained as to whether threads would be inspected when possible, such as during disassembly, maintenance involving disassembly, and so on. The applicant stated that its response was intended to reflect this approach but that the wording may not have been clear.


The applicant proposed a clarification which was acceptable to the staff:  "A sample of submerged bolting heads in raw water and waste water environments is visually inspected every four refueling outages (six years) when the pumps are dewatered. In addition when submerged raw water and waste water pump casings are dissembled during maintenance activities, the bolting threads will be opportunistically inspected-"
==SUMMARY==
Changes to applicant's Section 4.7.3, the time
OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION May 12, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicants Request for Additional Information (RAI) responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1, license renewal application.
-limited aging analysis (TLAA) associated with monitoring of inner reactor vessel indications in the RV clad. The staff had concerns regarding the changes to TLAA 4.7.3 and consistency with enhancements and changes already agreed to by Ameren Missouri in Callaway's ASME Section XI Inservice Inspection AMP and others. The revision of this TLAA as written in the response dated May 6, 2014, seemed to state that the indications would be inspected by using visual inspection routines, while in previous correspondence the applicant had agreed to use physical measurements and/or depth gages in order to determine whether any wall losses had occurred since the previous inspection.
Discussion The staff and the applicant discussed the following three items, with points being made as indicated:
* Response to RAI 3.0.3-2a, Loss of Coating Integrity (Followup). Coatings response, baseline and turbulent conditions. The staff identified one apparent minor gap in the applicants RAI response dated May 6, 2014, regarding RAI 3.0.3-2a. The response does not appear to adequately discuss the inspections for turbulent conditions in its Open Cycle Cooling Water and Inspection of Internal Surfaces aging management programs (AMPs). The staff noted that LR-ISG-2012-02 deals with inspections of a redundant train as a two-step process: (1) that no peeling, delamination, blisters, or rusting are observed during inspections, that any cracking and flaking has been found acceptable in accordance with the acceptance criteria program element of the particular AMP, and that no cracking or spalling is found in cementitious coatings; and (2) that the train is not subject to turbulence.
Following some discussion the staff and the applicant agreed that the appropriate sections of the response could be made more clear by wording similar to: [Coatings are inspected every six years on an alternating train basis based on no observed degradation or cracking and flaking that has been evaluated as acceptable; and the component is not subject to turbulent flow]. Baseline inspections may be used to demonstrate that long-term coatings are or are not subject to turbulent flow conditions that could result in mechanical damage to the coating.
* Response to RAI 3.3.2-2a, Submerged bolting, (Followup). The staff noted that in describing the opportunistic inspections of the submerged bolting, the response seems to allow for either an inspection of the bolt heads or an inspection of the bolt threads.
The staff position is that whenever an opportunity presented itself to do so, the applicant would inspect the bolt threads. The staff understood that bolt heads would receive their own opportunistic inspections, but the concern remained as to whether threads would be inspected when possible, such as during disassembly, maintenance involving disassembly, and so on. The applicant stated that its response was intended to reflect this approach but that the wording may not have been clear.
ENCLOSURE 2


After discussing this item both parties agreed that the applicant had not intended to go against the measurement methodologies previously agreed to. It was agreed that this response should be clarified by adding discussion that expressly discussed and clarified these points
The applicant proposed a clarification which was acceptable to the staff: A sample of submerged bolting heads in raw water and waste water environments is visually inspected every four refueling outages (six years) when the pumps are dewatered. In addition when submerged raw water and waste water pump casings are dissembled during maintenance activities, the bolting threads will be opportunistically inspected
. In the case of each of the three items discussed on the call, both parties agreed that the original intent of each response was acceptable to the staff and was not changed by the clarifications, however these clarifications would need to be placed on the docket as updates to the RAI responses. The timing of submitting these clarifications to the staff was agreed to be by J une 9, 2014.
* Changes to applicants Section 4.7.3, the time-limited aging analysis (TLAA) associated with monitoring of inner reactor vessel indications in the RV clad. The staff had concerns regarding the changes to TLAA 4.7.3 and consistency with enhancements and changes already agreed to by Ameren Missouri in Callaways ASME Section XI Inservice Inspection AMP and others. The revision of this TLAA as written in the response dated May 6, 2014, seemed to state that the indications would be inspected by using visual inspection routines, while in previous correspondence the applicant had agreed to use physical measurements and/or depth gages in order to determine whether any wall losses had occurred since the previous inspection.
The applicant stated that it understood the staff's pos itions and would provide the clarifications as discussed by the due date agreed upon
After discussing this item both parties agreed that the applicant had not intended to go against the measurement methodologies previously agreed to. It was agreed that this response should be clarified by adding discussion that expressly discussed and clarified these points.
.          
In the case of each of the three items discussed on the call, both parties agreed that the original intent of each response was acceptable to the staff and was not changed by the clarifications, however these clarifications would need to be placed on the docket as updates to the RAI responses. The timing of submitting these clarifications to the staff was agreed to be by June 9, 2014.
The applicant stated that it understood the staffs positions and would provide the clarifications as discussed by the due date agreed upon.


==SUBJECT:==
==SUBJECT:==
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)  DISTRIBUTION:


==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON      MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO.
ME7708)
DISTRIBUTION:
HARD COPY:
HARD COPY:
DLR RF E-MAIL: PUBLIC   RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource
DLR RF E-MAIL:
---------------------
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource
---------------------
JDaily FLyons YDiaz BMizuno (OGC)
JDaily FLyons YDiaz BMizuno (OGC)
GPick (RIV)}}
GPick (RIV)}}

Latest revision as of 21:24, 31 October 2019

May 2, 2014, Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application
ML14281A365
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/23/2015
From: Daily J
License Renewal Projects Branch 1
To:
Daily J, 415-3873
References
TAC ME7708
Download: ML14281A365 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 23, 2015 LICENSEE: Union Electric Company (Ameren Missouri)

FACILITY: Callaway Plant, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicants RAI responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1, license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view.

The applicant had an opportunity to comment on this summary.

/RA/

John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosures:

1. List of Participants
2. Summary of the Discussion cc w/encls: Listserv

ML14281A365 *concurred in person OFFICE LA:RPB1:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME *YEdmonds JDaily YDiaz-Sanabria JDaily DATE 11/3/14 2/19/15 2/19/15 2/23/15

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS May 12, 2014 PARTICIPANTS AFFILIATIONS John Daily U.S. Nuclear Regulatory Commission (NRC)

Bill Holston NRC John Wise NRC James Medoff NRC Dave Shafer Union Electric Company (Ameren Missouri)

Roger Wink Ameren Missouri Sharon Merciel Ameren Missouri Mike Hoehn Ameren Missouri Andrew Burgess Ameren Missouri Jerry Doughty Ameren Missouri Eric Blocher STARS Center of Business ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION May 12, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on May 12, 2014, to clarify certain points in the applicants Request for Additional Information (RAI) responses contained in its letter dated May 6, 2014, related to the review of the Callaway Plant, Unit 1, license renewal application.

Discussion The staff and the applicant discussed the following three items, with points being made as indicated:

  • Response to RAI 3.0.3-2a, Loss of Coating Integrity (Followup). Coatings response, baseline and turbulent conditions. The staff identified one apparent minor gap in the applicants RAI response dated May 6, 2014, regarding RAI 3.0.3-2a. The response does not appear to adequately discuss the inspections for turbulent conditions in its Open Cycle Cooling Water and Inspection of Internal Surfaces aging management programs (AMPs). The staff noted that LR-ISG-2012-02 deals with inspections of a redundant train as a two-step process: (1) that no peeling, delamination, blisters, or rusting are observed during inspections, that any cracking and flaking has been found acceptable in accordance with the acceptance criteria program element of the particular AMP, and that no cracking or spalling is found in cementitious coatings; and (2) that the train is not subject to turbulence.

Following some discussion the staff and the applicant agreed that the appropriate sections of the response could be made more clear by wording similar to: [Coatings are inspected every six years on an alternating train basis based on no observed degradation or cracking and flaking that has been evaluated as acceptable; and the component is not subject to turbulent flow]. Baseline inspections may be used to demonstrate that long-term coatings are or are not subject to turbulent flow conditions that could result in mechanical damage to the coating.

  • Response to RAI 3.3.2-2a, Submerged bolting, (Followup). The staff noted that in describing the opportunistic inspections of the submerged bolting, the response seems to allow for either an inspection of the bolt heads or an inspection of the bolt threads.

The staff position is that whenever an opportunity presented itself to do so, the applicant would inspect the bolt threads. The staff understood that bolt heads would receive their own opportunistic inspections, but the concern remained as to whether threads would be inspected when possible, such as during disassembly, maintenance involving disassembly, and so on. The applicant stated that its response was intended to reflect this approach but that the wording may not have been clear.

ENCLOSURE 2

The applicant proposed a clarification which was acceptable to the staff: A sample of submerged bolting heads in raw water and waste water environments is visually inspected every four refueling outages (six years) when the pumps are dewatered. In addition when submerged raw water and waste water pump casings are dissembled during maintenance activities, the bolting threads will be opportunistically inspected

  • Changes to applicants Section 4.7.3, the time-limited aging analysis (TLAA) associated with monitoring of inner reactor vessel indications in the RV clad. The staff had concerns regarding the changes to TLAA 4.7.3 and consistency with enhancements and changes already agreed to by Ameren Missouri in Callaways ASME Section XI Inservice Inspection AMP and others. The revision of this TLAA as written in the response dated May 6, 2014, seemed to state that the indications would be inspected by using visual inspection routines, while in previous correspondence the applicant had agreed to use physical measurements and/or depth gages in order to determine whether any wall losses had occurred since the previous inspection.

After discussing this item both parties agreed that the applicant had not intended to go against the measurement methodologies previously agreed to. It was agreed that this response should be clarified by adding discussion that expressly discussed and clarified these points.

In the case of each of the three items discussed on the call, both parties agreed that the original intent of each response was acceptable to the staff and was not changed by the clarifications, however these clarifications would need to be placed on the docket as updates to the RAI responses. The timing of submitting these clarifications to the staff was agreed to be by June 9, 2014.

The applicant stated that it understood the staffs positions and would provide the clarifications as discussed by the due date agreed upon.

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 12, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO.

ME7708)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource


JDaily FLyons YDiaz BMizuno (OGC)

GPick (RIV)