(10 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18135A246 | | | number = ML18135A246 |
| | issue date = 05/31/2018 | | | issue date = 05/31/2018 |
| | title = Seabrook Station, Unit No. 1 -Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 (EPID L-2018-LRM-002 | | | title = Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 |
| | author name = Poole J C | | | author name = Poole J |
| | author affiliation = NRC/NRR/DORL/LPLI | | | author affiliation = NRC/NRR/DORL/LPLI |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000250, 05000251, 05000335, 05000389, 05000443 | | | docket = 05000250, 05000251, 05000335, 05000389, 05000443 |
| | license number = DPR-031, DPR-041, DPR-067, NPF-016, NPF-086 | | | license number = DPR-031, DPR-041, DPR-067, NPF-016, NPF-086 |
| | contact person = Poole J C, NRR/DORL/LPLI, 415-2048 | | | contact person = Poole J, NRR/DORL/LPLI, 415-2048 |
| | case reference number = EPID L-2018-LRM-0027 | | | case reference number = EPID L-2018-LRM-0027 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 31, 2018 LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Florida Power & Light Company/NextEra Energy Fleet | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 31, 2018 LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Florida Power & Light Company/NextEra Energy Fleet |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SUMMARY OF APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 (EPID L-2018-LRM-0027) On April 24, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company/NextEra Energy (the licensee) via teleconference. The purpose of the meeting was for the licensee to discuss with the NRC staff its plans for an upcoming license amendment request for Seabrook Station, Unit No. 1 (Seabrook); St. Lucie Plant, Unit Nos. 1 and 2; and Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point), to adopt Standard Technical Specification (STS) 3.0.6. The meeting notice and agenda, dated April 9, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 18099A308. A list of attendees is enclosed. The licensee started the meeting by providing the NRC staff with an overview of its upcoming license amendment request to adopt STS 3.0.6 for the plants mentioned above. The licensee stated that it intends to incorporate STS 3.0.6 as it exists in NUREG-1431 "Standard Technical Specifications -Westinghouse Plants" and NUREG-1432 "Standard Technical Specifications -Combustion Engineering Plants," for the appropriate plants. The licensee mentioned how the upcoming submittal would add the Safety Function Determination Program, referenced in STS 3.0.6, to the administrative section of each plant's Technical Specifications (TS). The licensee also mentioned that Seabrook would be modifying its TS 3.0.1 and TS 3.0.2 to match the STS 3.0.1 and STS 3.0.2, in support of adding STS 3.0.6. The only deviation from the STS that the licensee noted was for Turkey Point where STS 3.0.6 would be labeled TS 3.0.7 due to Turkey Point already having an existing TS 3.0.6. The licensee provided a draft markup of the Seabrook TS to illustrate the changes to the NRC staff (ADAMS Accession No. ML 18150A482). The licensee stated that Limerick Station had submitted a similar license amendment request that was approved by the NRC and the licensee was using it as precedence. The licensee planned to submit the request in mid-May 2018. At the end of the presentation the NRC staff emphasized the submittal should include justifications for each change and should not simply point to the standard as justification since the licensee is choosing not to adopt the entire ST Members of the public were in attendance but there were no comments or questions. No public meeting feedback forms were received. Please direct any inquiries to me at 301-415-2048 or by e-mail to Justin.Poole@nrc.gov. Docket Nos. 50-250, 50-251, 50-335, 50-389, and 50-443 | | |
| | ==SUMMARY== |
| | OF APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 (EPID L-2018-LRM-0027) |
| | On April 24, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company/NextEra Energy (the licensee) via teleconference. The purpose of the meeting was for the licensee to discuss with the NRC staff its plans for an upcoming license amendment request for Seabrook Station, Unit No. 1 (Seabrook); St. Lucie Plant, Unit Nos. 1 and 2; and Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point), to adopt Standard Technical Specification (STS) 3.0.6. The meeting notice and agenda, dated April 9, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18099A308. A list of attendees is enclosed. |
| | The licensee started the meeting by providing the NRC staff with an overview of its upcoming license amendment request to adopt STS 3.0.6 for the plants mentioned above. The licensee stated that it intends to incorporate STS 3.0.6 as it exists in NUREG-1431 "Standard Technical Specifications -Westinghouse Plants" and NUREG-1432 "Standard Technical Specifications - Combustion Engineering Plants," for the appropriate plants. The licensee mentioned how the upcoming submittal would add the Safety Function Determination Program, referenced in STS 3.0.6, to the administrative section of each plant's Technical Specifications (TS). The licensee also mentioned that Seabrook would be modifying its TS 3.0.1 and TS 3.0.2 to match the STS 3.0.1 and STS 3.0.2, in support of adding STS 3.0.6. The only deviation from the STS that the licensee noted was for Turkey Point where STS 3.0.6 would be labeled TS 3.0.7 due to Turkey Point already having an existing TS 3.0.6. The licensee provided a draft markup of the Seabrook TS to illustrate the changes to the NRC staff (ADAMS Accession No. ML18150A482). The licensee stated that Limerick Station had submitted a similar license amendment request that was approved by the NRC and the licensee was using it as precedence. The licensee planned to submit the request in mid-May 2018. At the end of the presentation the NRC staff emphasized the submittal should include justifications for each change and should not simply point to the standard as justification since the licensee is choosing not to adopt the entire STS. |
| | |
| | Members of the public were in attendance but there were no comments or questions. No public meeting feedback forms were received. |
| | Please direct any inquiries to me at 301-415-2048 or by e-mail to Justin.Poole@nrc.gov. |
| | ustin C. Poole, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, 50-389, and 50-443 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendees cc: Listserv ustin C. Poole, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES* APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING UPCOMING LICENSE AMENDMENT TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 U.S. Nuclear Regulatory Commission Participants: | | |
| | List of Attendees cc: Listserv |
| | |
| | LIST OF ATTENDEES* |
| | APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING UPCOMING LICENSE AMENDMENT TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 U.S. Nuclear Regulatory Commission |
| | |
| | ==Participants:== |
| * Victor Cusumano, Branch Chief, Division of Safety Systems (DSS), Technical Specifications Branch (STSB), Office of Nuclear Reactor Regulation (NRR) | | * Victor Cusumano, Branch Chief, Division of Safety Systems (DSS), Technical Specifications Branch (STSB), Office of Nuclear Reactor Regulation (NRR) |
| * Caroline Tilton, Reactor Systems Engineer, NRR/DSS/STSB | | * Caroline Tilton, Reactor Systems Engineer, NRR/DSS/STSB |
| * Justin Poole, Project Manager, Division of Operating Reactor Licensing, NRR NextEra Energy Participants: | | * Justin Poole, Project Manager, Division of Operating Reactor Licensing, NRR NextEra Energy |
| | |
| | ==Participants:== |
| * Steve Catron, NextEra Licensing | | * Steve Catron, NextEra Licensing |
| * Gary Kilby, NextEra Licensing | | * Gary Kilby, NextEra Licensing |
Line 34: |
Line 50: |
| * David Lochbaum, Union of Concerned Scientists | | * David Lochbaum, Union of Concerned Scientists |
| * Debbie Grinnell, C-10 | | * Debbie Grinnell, C-10 |
| * all participation was by teleconference Enclosure | | * all participation was by teleconference Enclosure |
|
| |
|
| ML 18135A246 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NAME JPoole I Betts DATE 5/30/18 05/21/18 NRR/DORL/LPL 1/BC JDanna 5/30/18}}
| | ML18135A246 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME JPoole I Betts JDanna JPoole DATE 5/30/18 05/21/18 5/30/18 5/31/18}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML18150A4822018-04-23023 April 2018 NRR E-mail Capture - (External_Sender) LCO 3.0.6 LAR Pre-submittal Call Project stage: Other ML18135A2462018-05-31031 May 2018 Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 Project stage: Meeting 2018-04-23
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23276A1852023-09-25025 September 2023 Subsequent License Renewal Draft EIS Public Meetings: Meeting Summary ML23221A3782023-08-16016 August 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23187A4432023-07-11011 July 2023 6/27/2023, Annual Assessment Meeting for Seabrook Station - Meeting Summary ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23086B9962023-04-0404 April 2023 Summary of March 7, 2023, Meeting with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Revise Emergency Action Level Due to Modification to Containment Fire Detection Equipment ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report ML23081A5022023-03-28028 March 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22350A7082023-01-17017 January 2023 Summary of November 21, 2022, Presubmittal Meeting with Florida Power and Light on St. Lucie License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22263A0122022-09-27027 September 2022 Summary of August 29, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests (EPID Nos. L-2021-LLI-0000 and L 2021 Lli 0002) ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22238A2762022-08-29029 August 2022 Summary of August 17, 2022, Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22186A0812022-07-15015 July 2022 Summary of June 22, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Fire Protection Program Changes ML22160A3792022-06-30030 June 2022 Summary of May 24, 2022, Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Reactor Coolant Pump Seal Replacements ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22146A3422022-06-13013 June 2022 February 23, Summary of Meetings with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22153A1672022-06-0202 June 2022 Annual Assessment Meeting for Seabrook Station - Meeting Summary ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22054A0082022-03-0303 March 2022 Summary of February 17, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Intake Cooling Water Discharge Piping Proposed Alternative ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML22020A4052022-01-24024 January 2022 Summary of January 14, 2022, Teleconference with Florida Power & Light Co. Regarding Verbal Authorization of Request for Alternative to the Requirements of ASME Code for Examination of Closure Head CEDM Housing 27 Canopy Seal Weld ML21342A3752022-01-0606 January 2022 Summary of Meeting with Florida Power and Light/Nextera on Proposed Improved Technical Specification Conversions ML21337A1962021-12-16016 December 2021 Public Scoping Meeting Summary for the Environmental Review of the Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 ML21327A1802021-12-0707 December 2021 Summary of August 25, 2021 Observation Public Meeting with FPL to Discuss Proposed Alternative Report for the Intake Cooling Water System ML21336A4072021-12-0707 December 2021 Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections 2023-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 31, 2018 LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Florida Power & Light Company/NextEra Energy Fleet
SUBJECT:
SUMMARY
OF APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 (EPID L-2018-LRM-0027)
On April 24, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company/NextEra Energy (the licensee) via teleconference. The purpose of the meeting was for the licensee to discuss with the NRC staff its plans for an upcoming license amendment request for Seabrook Station, Unit No. 1 (Seabrook); St. Lucie Plant, Unit Nos. 1 and 2; and Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point), to adopt Standard Technical Specification (STS) 3.0.6. The meeting notice and agenda, dated April 9, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18099A308. A list of attendees is enclosed.
The licensee started the meeting by providing the NRC staff with an overview of its upcoming license amendment request to adopt STS 3.0.6 for the plants mentioned above. The licensee stated that it intends to incorporate STS 3.0.6 as it exists in NUREG-1431 "Standard Technical Specifications -Westinghouse Plants" and NUREG-1432 "Standard Technical Specifications - Combustion Engineering Plants," for the appropriate plants. The licensee mentioned how the upcoming submittal would add the Safety Function Determination Program, referenced in STS 3.0.6, to the administrative section of each plant's Technical Specifications (TS). The licensee also mentioned that Seabrook would be modifying its TS 3.0.1 and TS 3.0.2 to match the STS 3.0.1 and STS 3.0.2, in support of adding STS 3.0.6. The only deviation from the STS that the licensee noted was for Turkey Point where STS 3.0.6 would be labeled TS 3.0.7 due to Turkey Point already having an existing TS 3.0.6. The licensee provided a draft markup of the Seabrook TS to illustrate the changes to the NRC staff (ADAMS Accession No. ML18150A482). The licensee stated that Limerick Station had submitted a similar license amendment request that was approved by the NRC and the licensee was using it as precedence. The licensee planned to submit the request in mid-May 2018. At the end of the presentation the NRC staff emphasized the submittal should include justifications for each change and should not simply point to the standard as justification since the licensee is choosing not to adopt the entire STS.
Members of the public were in attendance but there were no comments or questions. No public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-2048 or by e-mail to Justin.Poole@nrc.gov.
ustin C. Poole, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, 50-389, and 50-443
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES*
APRIL 24, 2018, MEETING WITH FLORIDA POWER & LIGHT COMPANY/NEXTERA ENERGY REGARDING UPCOMING LICENSE AMENDMENT TO ADOPT STANDARD TECHNICAL SPECIFICATION 3.0.6 U.S. Nuclear Regulatory Commission
Participants:
- Victor Cusumano, Branch Chief, Division of Safety Systems (DSS), Technical Specifications Branch (STSB), Office of Nuclear Reactor Regulation (NRR)
- Justin Poole, Project Manager, Division of Operating Reactor Licensing, NRR NextEra Energy
Participants:
- Steve Catron, NextEra Licensing
- Gary Kilby, NextEra Licensing
- Christine Thomas, Seabrook Station Licensing
- Mike Syndor, St. Lucie Plant Licensing
- all participation was by teleconference Enclosure
ML18135A246 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME JPoole I Betts JDanna JPoole DATE 5/30/18 05/21/18 5/30/18 5/31/18