ML17208A616: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/08/1979
| issue date = 09/08/1979
| title = Monthly Operating Repts for Aug 1979
| title = Monthly Operating Repts for Aug 1979
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:QAVERAGEDAILYUNITFDIVERLEVEL.OQ+>00DOCKETNO.COMPLETEDGY~.T.ChilsonTELEPHONEMONTHAUGUST,1979DAYAVERAGEDAILYPOWERLEVEL{MWe-Net)DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)63617642538181920647671011121315166455473886462225262819303164765555659654653656INSTRUCTIONSOnthisformat,listtheaveragedailyunitp<>werlevelinMmeNetforeachdayintherep<>rtingmonth.C>>>t>putetothenearestwholemegawatt.(A>/77l OPERATINGDATAREPORTDOCKETNO.DAyp~sset.S,1979COMPLETEDIIYV.T.ChilsonTELEPHONE'~~3824OPERATINGSTATUS760700I.UnitName:TurkePointUnitNo.32.ReportingPeriod:3.LicensedThermalPower(MWt):22004.NameolateRating(GrossMWe):5.DesignElectricalRating(NetMWc):6.MaximumDependableCapacity(GrossMWe):7.MaximumDependableCapacity(NethIWe):Notes-Uni'tNo.3operatedatapproximately100%R.P.exceptforoutagesofAug.3andAug.8-14,1979.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.IfAny(NetMWe):10.ReasonsForrestrictions,IfAny:NONEThisMonthYr:to-DateCumuhtive744.045245.0625.8 2530.997.387214397277389902625075074.082.374.282.367.379.164.176.02.70.4Januarv121980ll.HoursInReportingPeriod5831.059072.612.NumberOfHoursReactorWasCritical2672.613.ReactorReserveShutdownHours0'94.614.HoursGeneratorOn-Line613.015.UnitReserveShutdownHours  16.GrossThermalEnergyGenerated(IIIWH)1329137544744917.GrossElectricalEnergyGenerated(MWH)170456019.UnitServiceFactor43.420.UnitAvailabilityFactor43.421.UnitCapacityFactor(UsingMDCNet)41.322.UnitCapacityFactor(UsingDERNet)39.723.UnitForcedOutageRate24.ShutdownsScheduledOverNext6Months(Type.Date,andDurationofEach}:Sceduledrefuelinmaintenanceandinsections-November15,1979-25.IfShutDownAtEndOfReportPeriod.EstimatedDateofStartup:26.UnitsInTestStatus(PriortoCommercialOperation):N/AForecastAchievedINITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATION('>/77}
{{#Wiki_filter:Q AVERAGE DAILYUNIT              FDIVER  LEVEL          .
UNlTSHUTDO)UNSANDPO)VERREDUCTlONSDOCKETNO.50250REPORTMONTi(AUGUST,1979Nu.Date~AItlrlVlrjQfV~AJ~V)LiccnsccEventReport~~JF~Causeh.CorrcctivcActiontoPrcvcntRceurrcncc1379-08-032.7N/AIAINSTRU(c)Unitwastrippedbythereactorpro-tectionsystemduringatransientconditioncausedbytemporarylossofpowersupplytorodpositionindicationsystem..Correctiveactionincludedrepairingpressurizerpres-surecontroller.(Nuclearsystem)1479-08-08S1283AN/ACBVALVEXUnitwasremovedfromservicetorepairseverepackingleaksonvalveslocatedinsidecontainmentthatcouldnotbeisolated.(Nuclearsystem)F:ForcedS:ScheduledReason:A.EquipmentFailure(Explain)B.MaintenanceoiTest.C-RefuelingDRegulatoryRestrictionE-OperatorTraining4UccnscExantinalionF-AdministrativeGOperationalFrror(Explain)IIOther(Explai>>)Method:l-Manual2-ManualScram.3-AutomaticScram.4-Other(Explain)ExhibitG-instructionsforPreparationofDataEntrySltectsforLicenseeEventRepuit(LER)File(NUREG-OI6I)5ExhibitI-SanteSource AVERACEDEWILYUNITPOWERLEVELDOCKETNO.'urkeyPositCOMPLETEDBYV.T.ChilsonTELEPHONEMONTHAUGUST1979DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)I631494DAYAVERACEDAILYPOWERLEVEL(MWe.Net)636171863736964020212263163310131415.166406436456392628'>930310862641642INSTRUCTIONSOnthisformat.listtheaveragedailyunitp>>werlevelillMWeNetforeachdayinthereportingnu>nth.C>>mputclothenearestwholemegawatt.I>t/77)
OQ+
OPERATINGSTATUSOPERATINGDATAREPORTDOCKETNO.M-~'i1DATE~<t:.81979COMPLETEDBY~~1LU.sonTELEPHONEKH}53~-3824TurkePointUnitNo.42200760693700666l.UnitName:2.ReportingPeriod:3.LicensedThermalPower(MWt):4.NamephteRating(Gross'MWe):5.DesignElectricalRating(NetMWe):6~MaximumDependableCapacity(GrossMWe):7.MaximumDependableCapacity(NetMWe):Notes-UnitHo.4operatedatapproximately100%R.P.exceptforoutagesofAug.35,and22-28,1979.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted,IfAny(NetMWe):10.ReasonsForRestrictions,IfAny:ThisMonthYr..to.DateCumulative52.800.0744.05831.038161.3597.8138.836538.1755089331265822241106882282896836637669.278.169.278.12.3.011.HoursInReportingPeriod12.NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGeneratorOn-Line15:UnitReserveShutdownHours  16.GrossThermalEnergyGenerated(MWH)736906618.NetElectricalEnergyGenerated(MWH)214426319.UnitServiceFactor2D.UnitAvailabilityFactor22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate21.95.124.ShutdownsScheduledOverNext6Months(Type,Dale,andDurationofEach):SteamGeneratorTubeInspectionProram.-October14-November11197925.IfShutDownAtEndOfReportPeriod,EstimatedDateofStartup:26.UnitsInTestStatus(PriortoCommercialOperation):ForecastAchievedINITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATION(u/77)
                                                                                                        >00 DOCKET NO.
UNITSHUTDOWNSANDPOWERREDUCTIONSREPORfhjONTIIAUGUST1979Page1of2DOCKETNO50-251COMPLETEDBYNu.DalePIrjVQJ~C/lLicenseeEventReport~Cause&.CorrcctivcActiontoPrcvclttRccurt'cltcc1279-08-03P4,53N/AZZZZZZUnitwastrippedduetospurioussignalfromreactorprotectionsystemduringaperiodicsurveillancetest.(Nuclearsystem)1379-08-05P9.2N/A,ZZZZZZUnitwastrippedbytheturbinepro-tectionsystemduringaperiodicsurveillancetestwhentheturbinetriprelatchdevicedidnotresetpro'perly.Correctiveactionsin-cludedrepairingtherelatchlinkage.(Non-nuclearsystem)1479-08-22P148.0N/ACBHOTORXUnitwasremovedfromserviceduetoexcessivevibrationofreactorcool-ant.pumpshaft.Correctiveactionsincludedreplacingfailedmotorbear-ingandrepairingoilleak.(Non-IF:ForcedS:Scheduled('>I>7)Reason:A.EquipmentFailure(Explain)B.MainlcnanccorTest.('-RefuelingD.RegulatoryRestrictionE-OperatorTraining&.LicenseExaminationF-AdministrativeG.OperationalError(Explain)II.Other(Explain)hicthod:I-hianual2.hlanualScram.3-AutomattcScram.4-Other(Explain)ExhibitG-InstructionsforPreparationol'DataEntrySheetslorLicenseeEventRcport(LER)File(NUREG-OI6I)ExhibitI-SattteSource
COMPLETED GY        ~. T. Chilson TELEPHONE MONTH            AUGUST, 1979 DAY      AVERAGE DAILYPOWER LEVEL                              DAY      AVERAGE DAILYPOWER LEVEL
{MWe-Net)                                                     (MWe-Net) 17                        636 642                                18                        647 538                                19                        6  7 20 22 645                                                          647 547                                                          655 25 10                                                              26 11                                                                                          55 12                                                              28                        659 13                                                              19                        654 388                                30                        653 15                                                              31                        656 16                          646 INSTRUCTIONS On this format, list the average daily unit p<>wer level in Mme Net for each day in the rep<>rting month. C>>>t>pute to the nearest whole megawat t.
(A>/77 l


UNITSIIUfDOWNSANDPOWERREDUCTIONS'DOCKETNO50-251REPORTMONTHAUGUST1979Page2of2No.DateCTS~Ka-gV'~tC4,~COLicensccEventRcport>CEJcIACQQCauseACorrectiveActiontoPreventRccurrcncc1579-08-281.7.AN/AHHZZZZZZUnitwastrippedbysteamgenera"..orNo.48levelprotectionsystemwhi'leincreasingloadaftertheunitwasreturnedtoservice.{Non-nuclearsystem)IF:ForcedS:ScheduledReason:A-EquipmentFailure(Explain)IIMaintenanceorTest-C.RefuelingD-RegulatoryRestrictiunEOperatorTraining&LicenseExantinationF.AdministrativeG.OperationalError(Explain)II.Other(Explain)3Method:I-Manual2-blanualScram.3-AutotnaticScrant.4.Other(Explain)4ExhibitG-InstructionsforPreparationol'DataEntrySheetsforLicenseeEventReport(LER)File(NUREG-OI6I)ExhibitI-SameSource AVERAGEDAILYUNITPOWERLEVEL*COMPLETEDIIYV.T.ChilsonTELEPHONEMONTHAUGUST1979DAYAVERAGEDAILYPOWERLEVEL{MWe-Net)793DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)l738479391786l8l9202]22787827818510I3l4ISl6INSTRUCTIONS7717907897857682S2628'9,30NOTE:783785782774Averagedailypowerlevelgreaterthan777NNeduetocoolercondensercoolingwater.Onthisformat.listtheaveragedailyunitpowerlevelinMme.Netforeachdayhtthereporting>nonth.Computetothenearestwholemgawatt..I')!771 OPERATINGDATAREPORTOPERATINGSTATUS8508221.UnitName't..LucieUnitNo.12.ReportingPeriod:3.LicensedThermalPower(MWt):25604.NameplateRating(GrossMWe):5.DesignElectricalRating(NetMWe):6.MaximumDependableCapacity(GrossMWe):DOCKETNO.~Set.81979COMPLETEDBY~'g.lsonTELEPHONE~Q~-3824Notes-Unitoperatedatapproximately100%R.P.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport.GiveReasons:9.PowerLevelToWhichRestricted,IfAny(NetMWe):10.ReasonsForRestrictions,lfAny:NONE-ThisMonthYr..to.DateCumulative*II.12.13.14.15.16.17.18.19.202123.23615.019005.8831.04218.2118.518351."23992.021.0 44016485979833731651201427207013419122297628477.768.577.868.53.163.6'70.96.14.7s.79-13and79-14-Setember23-October8,1979HoursInReportingPeriodNumberOfHoursReactorWasCritical-744~0ReactorReserveShutdownHours -0HoursGeneratorOn.Line744.0UnitReserveShutdownHours~, GrossThermalEnergyGenerated(MWH)1897496GrossElectricalEnergyGenerated(MWH)614590NetElectricalEnergyGenerated(MWH)581473UnitServiceFactor100.0UnitAvailabilityFactor'00.0UnitCapacityFactor(UsingDERNet)97.5UnitForcedOutageRate ShutdownsScheduledOverNext6Months(Type..Date.andDurationofEach):OutaetoerforminsectionsreuiredbyTEBulletinNo25.IfShutDownAtEndOfReportPeriod,EstimatedDateofStartup:26.UnitsInTestStatus(PriortoCommercialOperation):ForecastAchievedINITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATIONI'i/77) r~ILLL~UNITSHUTDOWNSANDPOWERREDUCTIONSREPORTMONTIIAUGUST1979DOCKETNO.COMPLETEDBYV<<L.DateLooEl~LllgLicenseeEventRepLlrtsr4/CPL/1CrCause&CorrectiveActiontoPrcvcntRecurrenceNONEF:ForcedS:SchcdulctlILIt77)Reason:A-EquipmentFailure(Explain)B.hlaintenanccorTest~C-RefuelingD.RegulatoryRestriotionE.OperatorTraining&LICCLtscExamhlatlonF.Administrative.G.OperationalError(Explain)IIOthCr(EXpiaiLL)Method:I-Manual2.ManualScram.3-AutomaticScram.4.Other(Explain)4ExhibitG~InstructionsforPreparationofDataEntryShcctsI'orLicenseeEventReport(LER)File(NUREG-OI6I)ExhibitI-SanteSource P.O.SOX529100,MIAMI,FL33152~it!Illy~I~I~Pi~i,.,x~FLORIOAPOWER4LIGHTCOMPANYSeptember8,1979OfficeofManagement.ZnformationandProgramControlsU.S.Nuclear.RegulatoryCommissionWashington,D.C.20555Gentlemen:AttachedaretheAugust,1979,OperatingSummaryReportsforTurkeyPointUnitNos,.3and.4andSt,.LucieUnitNo.l.Verytrulyyours,D.SchmidtVicePresidentPowerResourcesVTC/DDCcc:Mr.JamesP.O'ReillyRobertLowenstein,EsquirePEOPLE~~~SERVINGPEOPL-"
OPERATING DATA REPORT DOCKET NO.
SUOFOPERATINGEM'ERiENCDOCKETNO.50-250TurkeyPoint,UNITUnitNo.3DATESet.81979'OMPLETEDBYV.T.Chilson'TELEPHONE,305)552-3824~REPORTMONTH'UGUST;19790Unitoperatedat.approximately100~R.P.exceptforoutagesofAugust,3andAugust8-14,1979.Referto"UnitShutdownsandPowerReductions"secti'onoftheAugust,,1979,OperatingStatus.Reportforadditionalinformation.,MajorSafe'ty-relatedmaintenanceactivitiesperformedduringthemonth,included:Repairingvalvepackingleaksonvalveslocatedinsidecontainment.
DAyp ~sset.        S,  1979 V.T. Chilson COMPLETED IIY TELEPHONE    '~~3824 OPERATING STATUS Notes    Uni't No. 3      operated I. Unit Name:                Turke      Point Unit No.       3 R.P.
SUi&YOFOPERATlNGEXPERENCDOCKETNO.50-251TurkeyPoint.UNZTUnitNo.4DATESept.8,1979COMPLETEDBYhilsonREPORTMONTHAUGUST1979TELEPHONE(305)552-3824Unitoperated.atapproximately100%R.P;exceptforoutagesofAugust3,5,and22-Z8,1979.Referto"UnitShutdownsandPowerReductions"sectionofthe.August,1979OperatingStatusReportforadditionaloperation.MajorSafety-relatedmaintenanceactivitiesperformedduringthemonthincluded:Replaced.failedmotorbearingonreactorcoolantpump'motorNo.4A.RepairedoilleakonreactorcoolantpumpmotorNo..'4A.
at approximately        100%
SUMlt'0PPOCKETNO.'0-335St.LucieUnitNo.1DATESet.8,1979REPORTMONTHAUGUST,1979COMPLETEDBX'.T.ChilsonTELEPHONE(305)552-3824I'nitoperated.atapproximately100%R;P.NoMajorSafety-related.maintenancewasperformedduringthemonth.
: 2. Reporting Period:
2200 except      for  outages    of Aug.      3
: 3. Licensed Thermal Power (MWt):                                       and Aug. 8-14, 1979.
: 4. Nameolate Rating (Gross MWe):                    760
: 5. Design Electrical Rating (Net MWc):
: 6. Maximum Dependable Capacity (Gross MWe):
700
: 7. Maximum Dependable Capacity (Net hIWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
If Any (Net MWe):           NONE
: 9. Power Level To Which Restricted.
: 10. Reasons For restrictions, If Any:
This Month          Yr:to-Date            Cumuh tive 072.6 744.0                831.0
                                                                                        '94.6 ll. Hours In Reporting Period                                                5                    59
: 12. Number  Of Hours Reactor  Was Critical              625.8            2  672.6             45  245.0
: 13. Reactor Reserve Shutdown Hours                                              0
: 14. Hours Generator On-Line                                613.0            2  530.9
: 15. Unit Reserve Shutdown Hours                                                                  97.3
: 16. Gross Thermal Energy Generated (IIIWH)             1 329 137            5  447 449            87 214 397
: 17. Gross Electrical Energy Generated (MWH)                                 1 704 560            27 738 990 26 250 750
: 19. Unit Service Factor                                      82.3                43.4                  74.0
: 20. Unit Availability Factor                                82.3                 43.4                   74.2
: 21. Unit Capacity Factor (Using MDC Net)                     79.1                41.3                  67.3
: 22. Unit Capacity Factor (Using DER Net)                    76.0                39.7                  64.1
: 23. Unit Forced Outage Rate                                    0.4                                        2.7
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each}:
Sc eduled refuelin            maintenance and ins ections            -   November    15, 1979 Januarv 12        1980
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:         N/A
: 26. Units In Test Status (Prior to Commercial Operation):                     Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77 }


}}
DOCKETNO. 50            250 UNlT SHUTDO)UNS AND PO)VER REDUCTlONS REPORT MONTi( AUGUST, 1979 fV ~
rl      AJ Liccnscc
                                                                                ~J Cause h. Corrcctivc IA
                              ~
Nu.          Date          tl        Vl rj                  Event                                          Action to Q
Report ~
F  ~                Prcvcnt Rceurrcncc
                                            ~ V) 13        79-08-03          2.7                            N/A      IA      INSTRU    Unit was tripped by the reactor pro-(c)    tection system during a transient condition caused by temporary loss of power supply to rod position indication system.. Corrective action included repairing pressurizer pres-sure controller.      (Nuclear system) 14        79-08-08  S    128 3        A                    N/A      CB      VALVEX    Unit was removed from service to repair severe packing leaks on valves located inside containment that could not be isolated. (Nuclear system)
F: Forced        Reason:                                          Method:                          Exhibit G - instructions S: Scheduled      A.Equipment Failure (Explain)                      l-Manual                        for Preparation of Data B.Maintenance oi Test .                            2-Manual Scram.                  Entry Sltects for Licensee C-Refueling                                        3-Automatic Scram.              Event Repuit (LER) File (NUREG-D Regulatory Restriction                          4-Other (Explain)                OI 6I )
E-Operator Training 4 Uccnsc Exantinalion F-Administrative                                                                5 G Operational Frror (Explain)                                                      Exhibit I - Sante Source II Other (Explai>>)
 
AVERACE DEWILY UNITPOWER LEVEL DOCKET NO.
                                                                                                      'urkey Posit COMPLETED BY        V. T. Chilson TELEPHONE MONTH          AUGUST          1979 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERACE DAILYPOWER LEVEL (MWe.Net)                                                    (MWe.Net )
I                        631                                    17                      636 18 494 637                                  20                        631 369                                  21                        633 640                                  22 640 10                        643                                  26 645 28                          08 13                                                              '>9                      62 14                                                              30                        641 15                                                              31                        642
.16                        639 INSTRUCTIONS On this format. list the average daily unit p>>wer level ill MWe Net for each day in the reporting nu>nth. C>>mputc lo the nearest whole megawatt.
I>t/77)
 
OPERATING DATA REPORT DOCKET NO. M-~ 'i1 DATE    ~<t:. 8 1979 COMPLETED BY      ~~1LU.son TELEPHONE    KH}53 ~-3824 OPERATING STATUS Point Unit No.                Notes    Unit Ho. 4      operated
: l. Unit Name:                    Turke                          4 at approximately        100%  R.P.
: 2. Reporting Period:                                                                for            of Aug.
2200                  except          outages                3
: 3. Licensed Thermal Power (MWt):                                                    22-28, 760                5,  and            1979.
: 4. Namephte Rating (Gross'MWe):
: 5. Design Electrical Rating (Net MWe):              693 6 Maximum Dependable Capacity (Gross MWe):
    ~
700
: 7. Maximum Dependable Capacity (Net MWe):                      666
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,  If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr..to.Date          Cumulative
: 11. Hours In Reporting Period                              744.0              5  831.0            52.800.0
: 12. Number Of Hours Reactor Was Critical                    597.8                                  38 161.3
: 13. Reactor Reserve Shutdown Hours                                                                      138.8
: 14. Hours Generator On-Line                                                                        36 538.1 15: Unit Reserve Shutdown Hours                                                  16. Gross Thermal Energy Generated (MWH)                1 265 822              7  369 066          75 508 933 24 110 688
: 18. Net Electrical Energy Generated (MWH)                  366 376            2 144 263            22 828 968
: 19. Unit Service Factor                                        78.1                                      69.2 2D. Unit Availability Factor                                78.1                                      69.2
: 22. Unit Capacity Factor (Using DER Net)                                                                  2.
: 23. Unit Forced Outage Rate                                    21.9                  5.1                  3.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Dale, and Duration    of Each):
Steam Generator Tube          Inspection Pro      ram. October 14  November 11              1979
: 25. If Shut Down At End Of Report Period, Estimated Date    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast            Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77 )
 
DOCKET NO          50  251 UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPOR    f hjONTII AUGUST      1979 Page 1  of  2 PI    Q    J      Licensee                                        Cause &. Corrcctivc Nu.          Dale                        rj                  Event                                              Action to V
Report ~                                        Prcvcltt Rccurt'cltcc
                                                ~  C/l 12        79-08-03  P          4,5              3            N/A                    ZZZZZZ  Unit was tripped due to spurious signal from reactor protection system during a periodic surveillance test.
(Nuclear system) 13        79-08-05  P          9.2                            N/A,                  ZZZZZZ  Unit was tripped by the turbine pro-tection system during a periodic surveillance test when the turbine trip relatch device did not reset pro'perly. Corrective actions in-cluded repairing the relatch linkage.
(Non-nuclear system) 14        79-08-22  P      148.0                            N/A          CB        HOTORX  Unit  was removed from service due to excessive vibration of reactor cool-ant.pump  shaft.      Corrective actions included replacing failed motor bear-ing and repairing oil leak. (Non-I F: Forced          Reason:                                                hicthod:                          Exhibit G - Instructions S: Scheduled        A.Equipment Failure (Explain)                          I -hianual                        for Preparation ol'Data B.Mainlcnancc or Test .                                2.hlanual Scram.                  Entry Sheets lor Licensee
('-Refueling                                          3-Automat tc Scram.                Event Rcport (LER) File (NUREG-D.Regulatory Restriction                              4-Other (Explain)                  OI 6I )
E-Operator Training &. License Examination F-Administrative G.Operational Error (Explain)                                                            Exhibit I - Sattte Source
('>I>7)                I I.Other (Explain)
 
DOCKETNO        50  251 UNIT SIIU fDOWNS AND POWER REDUCTIONS REPORT MONTH AUGUST          1979 Page 2 of 2 gV'~
t                              C C                  C4,                                EJ IA Licenscc                c                      Cause A Corrective No.          Date            TS                              Event                                              Action to a-
                              ~K
                                              ~  CO        Rcport >
C Q
Q                  Prevent Rccurrcncc 15        79-08-28          1.7  . A                      N/A        HH      ZZZZZZ    Unit  was  tripped by steam genera"..or No. 48  level protection system whi'le increasing load after the unit was  returned to service.            {Non-nuclear system)
OI6I)
I                                                                        3                                4 F: Forced          Reason:                                              Method:                              Exhibit G - Instructions S: Scheduled        A-Equipment Failure (Explain)                        I -Manual                          for Preparation ol'Data II Maintenance or Test-                              2-blanual Scram.                    Entry Sheets for Licensee C.Refueling                                          3-Autotnatic Scrant.                Event Report (LER) File (NUREG-D-Regulatory Restrictiun                            4.Other (Explain)
E Operator Training & License Exantination F.Administrative G.Operational Error (Explain)                                                            Exhibit I - Same Source II.Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY      V. T. Chilson TELEPHONE MONTH          AUGUST          1979 DAY      AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL
{MWe-Net)                                                    (MWe-Net) 793                                l7                        38 l8                        78 793                                l9                        782 4                            91                              20                        781 786                                2]
22                        85 771 2S                        783 10                                                              26                        785 790 28
                                                                    '9 I3                          789                                                          782 l4                          785                              ,30                        774 IS l6                          768                                NOTE:        Average      daily      power    level greater than 777 NNe due to cooler condenser cooling water.
INSTRUCTIONS On this format. list the average daily unit power level in Mme.Net for each day ht the reporting >nonth. Compute to the nearest whole m gawatt..
I')!77 1
 
OPERATING DATA REPORT DOCKET NO.
: t. 1979 8
COMPLETED BY TELEPHONE
                                                                                                      ~'g.lson
                                                                                                      ~Se
                                                                                                      ~Q ~-3824 OPERATING STATUS
: 1. Unit  Name't..Lucie                      Unit  No. 1                Notes  Unit operated at approximately 100 % R.P.
: 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):                  2560
: 4. Nameplate Rating (Gross MWe):                    850
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
822
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To Which Restricted,  IfAny (Net MWe):              NONE-
: 10. Reasons For Restrictions, lf Any:
This Month            Yr..to.Date          Cumulative
*II. Hours In Reporting Period                                                  831.0              23 615.0
: 12. Number Of Hours Reactor Was Critical          -      744 ~ 0            4 218.2              19 005.8
: 13. Reactor Reserve Shutdown Hours                                              -0                118.5
: 14. Hours Generator On. Line                              744. 0            3  992.0            18 351."2
: 15. Unit Reserve Shutdown Hours ~,                                                              21.0
: 16. Gross Thermal Energy Generated (MWH)              1 897 496            9 798 337            44 016 485
                              '00.0
: 17. Gross Electrical Energy Generated (MWH)              614 590            3 165 120            14 272 070
: 18. Net Electrical Energy Generated (MWH)                581 473            2 976 284            13 419 122
: 19. Unit Service Factor                                  100. 0                  68.5                  77.7 20 Unit Availability Factor                                                      68.5                  77.8 21                                                                                                        3.1 Unit Capacity Factor (Using DER Net)                    97.5                  63.6                  '70.9
: 23. Unit Forced Outage Rate                                                      4.7                  6.1 Shutdowns Scheduled Over Next 6 Months (Type..Date. and Duration  of Each):
Outa e to erform ins ections re uired by TE                      Bulletin      No s. 79-13 and 79-14 Se  tember 23  October 8, 1979
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'i/77 )
 
r
                                                            ~ IL LL ~
UNIT SHUTDOWNS AND POWER REDUCTIONS                DOCKET NO.
1979    COMPLETED BY REPORT MONTII AUGUST L
o o            Licensee                        Cause  & Corrective El                      4/ CP V<<L.          Date                                                  Event                              Action to RepLlrt sr L/1 Cr              Prcvcnt Recurrence
                                                  ~ Lll g NONE 4
F: Forced          Reason:                                                    Method:                Exhibit G ~ Instructions S: Schcdulctl      A-Equipment Failure (Explain)                              I -Manual              for Preparation of Data B.hlaintenancc or Test    ~
2.Manual Scram.        Entry Shccts I'or Licensee C-Refueling                                                3-Automatic Scram. Event Report  (LER) File (NUREG-D.Regul at ory Rest riot ion                              4.Other (Explain)      OI 6I )
E.Operator Training & LICCLtsc Examhlatlon F.Administrative.
G.Operational Error (Explain)                                                    Exhibit I - Sante Source ILIt77)              II OthCr (EXpiaiLL)
 
P.O. SOX 529100, MIAMI, FL 33152
                                                                            ~it!Illy~
I~          I~Pi~i,., x~
FLORIOA POWER 4 LIGHT COMPANY September          8, 1979 Office of  Management. Znformation and Program Controls U. S. Nuclear. Regulatory Commission Washington, D. C.      20555 Gentlemen:
Attached are the August, 1979, Operating Summary Reports              for Turkey Point Unit Nos,. 3 and. 4 and St,. Lucie Unit No.        l.
Very  truly yours, D. Schmidt Vice President Power Resources VTC/DDC cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE ~ ~ ~ SERVING PEOPL-"
 
SU      OF OPERATING EM'ERiENC DOCKET NO. 50  250 Turkey Point, UNIT    Unit  No. 3 DATE    Se t. 8 1979'OMPLETED BY    V. T. Chil son
                                        'TELEPHONE,    305) 552-3824
~ REPORT MONTH    'UGUST; 1979 Unit operated at. approximately 100~ R.P. except for outages of August, 0
3 and August 8-14, 1979. Refer to "Unit Shutdowns and Power Reductions" secti'on of the August,, 1979, Operating Status. Report for additional information.,
Major Safe'ty-related maintenance activities performed during the month
  ,included:
Repairing valve packing leaks on valves located inside containment.
 
SUi&  Y OF OPERATlNG EXPER ENC DOCKET NO.      50  251 Turkey Point.
UNZT      Unit No. 4 DATE      Sept. 8, 1979 COMPLETED BY              hilson TELEPHONE      (305) 552-3824 REPORT MONTH        AUGUST  1979 Unit operated. at approximately 100% R.P; except for outages of August 3, 5, and 22-Z8, 1979. Refer to "Unit Shutdowns and Power Reductions" section of the. August, 1979 Operating Status Report for additional operation.
Major Safety-related maintenance activities performed during the month included:
Replaced. failed motor bearing on reactor coolant pump  'motor No. 4A.
Repaired    oil leak on reactor coolant  pump  motor No.. '4A.
 
SUMlt'  0  P POCKET NO. '0    335 St. Lucie Unit No. 1 DATE    Se t. 8, 1979 COMPLETED BX        '. T. Chilson TELEPHONE    (305) 552-3824 REPORT MONTH      AUGUST, 1979 operated. at approximately  100% R;P.
I'nit No Major Safety-related. maintenance was performed during the month.}}

Latest revision as of 16:08, 4 February 2020

Monthly Operating Repts for Aug 1979
ML17208A616
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/08/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A615 List:
References
NUDOCS 8005200590
Download: ML17208A616 (16)


Text

Q AVERAGE DAILYUNIT FDIVER LEVEL .

OQ+

>00 DOCKET NO.

COMPLETED GY ~. T. Chilson TELEPHONE MONTH AUGUST, 1979 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe-Net) (MWe-Net) 17 636 642 18 647 538 19 6 7 20 22 645 647 547 655 25 10 26 11 55 12 28 659 13 19 654 388 30 653 15 31 656 16 646 INSTRUCTIONS On this format, list the average daily unit p<>wer level in Mme Net for each day in the rep<>rting month. C>>>t>pute to the nearest whole megawat t.

(A>/77 l

OPERATING DATA REPORT DOCKET NO.

DAyp ~sset. S, 1979 V.T. Chilson COMPLETED IIY TELEPHONE '~~3824 OPERATING STATUS Notes Uni't No. 3 operated I. Unit Name: Turke Point Unit No. 3 R.P.

at approximately 100%

2. Reporting Period:

2200 except for outages of Aug. 3

3. Licensed Thermal Power (MWt): and Aug. 8-14, 1979.
4. Nameolate Rating (Gross MWe): 760
5. Design Electrical Rating (Net MWc):
6. Maximum Dependable Capacity (Gross MWe):

700

7. Maximum Dependable Capacity (Net hIWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

If Any (Net MWe): NONE

9. Power Level To Which Restricted.
10. Reasons For restrictions, If Any:

This Month Yr:to-Date Cumuh tive 072.6 744.0 831.0

'94.6 ll. Hours In Reporting Period 5 59

12. Number Of Hours Reactor Was Critical 625.8 2 672.6 45 245.0
13. Reactor Reserve Shutdown Hours 0
14. Hours Generator On-Line 613.0 2 530.9
15. Unit Reserve Shutdown Hours 97.3
16. Gross Thermal Energy Generated (IIIWH) 1 329 137 5 447 449 87 214 397
17. Gross Electrical Energy Generated (MWH) 1 704 560 27 738 990 26 250 750
19. Unit Service Factor 82.3 43.4 74.0
20. Unit Availability Factor 82.3 43.4 74.2
21. Unit Capacity Factor (Using MDC Net) 79.1 41.3 67.3
22. Unit Capacity Factor (Using DER Net) 76.0 39.7 64.1
23. Unit Forced Outage Rate 0.4 2.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each}:

Sc eduled refuelin maintenance and ins ections - November 15, 1979 Januarv 12 1980

25. IfShut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

('>/77 }

DOCKETNO. 50 250 UNlT SHUTDO)UNS AND PO)VER REDUCTlONS REPORT MONTi( AUGUST, 1979 fV ~

rl AJ Liccnscc

~J Cause h. Corrcctivc IA

~

Nu. Date tl Vl rj Event Action to Q

Report ~

F ~ Prcvcnt Rceurrcncc

~ V) 13 79-08-03 2.7 N/A IA INSTRU Unit was tripped by the reactor pro-(c) tection system during a transient condition caused by temporary loss of power supply to rod position indication system.. Corrective action included repairing pressurizer pres-sure controller. (Nuclear system) 14 79-08-08 S 128 3 A N/A CB VALVEX Unit was removed from service to repair severe packing leaks on valves located inside containment that could not be isolated. (Nuclear system)

F: Forced Reason: Method: Exhibit G - instructions S: Scheduled A.Equipment Failure (Explain) l-Manual for Preparation of Data B.Maintenance oi Test . 2-Manual Scram. Entry Sltects for Licensee C-Refueling 3-Automatic Scram. Event Repuit (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) OI 6I )

E-Operator Training 4 Uccnsc Exantinalion F-Administrative 5 G Operational Frror (Explain) Exhibit I - Sante Source II Other (Explai>>)

AVERACE DEWILY UNITPOWER LEVEL DOCKET NO.

'urkey Posit COMPLETED BY V. T. Chilson TELEPHONE MONTH AUGUST 1979 DAY AVERAGE DAILYPOWER LEVEL DAY AVERACE DAILYPOWER LEVEL (MWe.Net) (MWe.Net )

I 631 17 636 18 494 637 20 631 369 21 633 640 22 640 10 643 26 645 28 08 13 '>9 62 14 30 641 15 31 642

.16 639 INSTRUCTIONS On this format. list the average daily unit p>>wer level ill MWe Net for each day in the reporting nu>nth. C>>mputc lo the nearest whole megawatt.

I>t/77)

OPERATING DATA REPORT DOCKET NO. M-~ 'i1 DATE ~<t:. 8 1979 COMPLETED BY ~~1LU.son TELEPHONE KH}53 ~-3824 OPERATING STATUS Point Unit No. Notes Unit Ho. 4 operated

l. Unit Name: Turke 4 at approximately 100% R.P.
2. Reporting Period: for of Aug.

2200 except outages 3

3. Licensed Thermal Power (MWt): 22-28, 760 5, and 1979.
4. Namephte Rating (Gross'MWe):
5. Design Electrical Rating (Net MWe): 693 6 Maximum Dependable Capacity (Gross MWe):

~

700

7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 744.0 5 831.0 52.800.0
12. Number Of Hours Reactor Was Critical 597.8 38 161.3
13. Reactor Reserve Shutdown Hours 138.8
14. Hours Generator On-Line 36 538.1 15: Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 265 822 7 369 066 75 508 933 24 110 688
18. Net Electrical Energy Generated (MWH) 366 376 2 144 263 22 828 968
19. Unit Service Factor 78.1 69.2 2D. Unit Availability Factor 78.1 69.2
22. Unit Capacity Factor (Using DER Net) 2.
23. Unit Forced Outage Rate 21.9 5.1 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Dale, and Duration of Each):

Steam Generator Tube Inspection Pro ram. October 14 November 11 1979

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77 )

DOCKET NO 50 251 UNITSHUTDOWNS AND POWER REDUCTIONS COMPLETED BY REPOR f hjONTII AUGUST 1979 Page 1 of 2 PI Q J Licensee Cause &. Corrcctivc Nu. Dale rj Event Action to V

Report ~ Prcvcltt Rccurt'cltcc

~ C/l 12 79-08-03 P 4,5 3 N/A ZZZZZZ Unit was tripped due to spurious signal from reactor protection system during a periodic surveillance test.

(Nuclear system) 13 79-08-05 P 9.2 N/A, ZZZZZZ Unit was tripped by the turbine pro-tection system during a periodic surveillance test when the turbine trip relatch device did not reset pro'perly. Corrective actions in-cluded repairing the relatch linkage.

(Non-nuclear system) 14 79-08-22 P 148.0 N/A CB HOTORX Unit was removed from service due to excessive vibration of reactor cool-ant.pump shaft. Corrective actions included replacing failed motor bear-ing and repairing oil leak. (Non-I F: Forced Reason: hicthod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I -hianual for Preparation ol'Data B.Mainlcnancc or Test . 2.hlanual Scram. Entry Sheets lor Licensee

('-Refueling 3-Automat tc Scram. Event Rcport (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI 6I )

E-Operator Training &. License Examination F-Administrative G.Operational Error (Explain) Exhibit I - Sattte Source

('>I>7) I I.Other (Explain)

DOCKETNO 50 251 UNIT SIIU fDOWNS AND POWER REDUCTIONS REPORT MONTH AUGUST 1979 Page 2 of 2 gV'~

t C C C4, EJ IA Licenscc c Cause A Corrective No. Date TS Event Action to a-

~K

~ CO Rcport >

C Q

Q Prevent Rccurrcncc 15 79-08-28 1.7 . A N/A HH ZZZZZZ Unit was tripped by steam genera"..or No. 48 level protection system whi'le increasing load after the unit was returned to service. {Non-nuclear system)

OI6I)

I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -Manual for Preparation ol'Data II Maintenance or Test- 2-blanual Scram. Entry Sheets for Licensee C.Refueling 3-Autotnatic Scrant. Event Report (LER) File (NUREG-D-Regulatory Restrictiun 4.Other (Explain)

E Operator Training & License Exantination F.Administrative G.Operational Error (Explain) Exhibit I - Same Source II.Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY V. T. Chilson TELEPHONE MONTH AUGUST 1979 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe-Net) (MWe-Net) 793 l7 38 l8 78 793 l9 782 4 91 20 781 786 2]

22 85 771 2S 783 10 26 785 790 28

'9 I3 789 782 l4 785 ,30 774 IS l6 768 NOTE: Average daily power level greater than 777 NNe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power level in Mme.Net for each day ht the reporting >nonth. Compute to the nearest whole m gawatt..

I')!77 1

OPERATING DATA REPORT DOCKET NO.

t. 1979 8

COMPLETED BY TELEPHONE

~'g.lson

~Se

~Q ~-3824 OPERATING STATUS

1. Unit Name't..Lucie Unit No. 1 Notes Unit operated at approximately 100 % R.P.
2. Reporting Period:
3. Licensed Thermal Power (MWt): 2560
4. Nameplate Rating (Gross MWe): 850
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

822

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe): NONE-
10. Reasons For Restrictions, lf Any:

This Month Yr..to.Date Cumulative

  • II. Hours In Reporting Period 831.0 23 615.0
12. Number Of Hours Reactor Was Critical - 744 ~ 0 4 218.2 19 005.8
13. Reactor Reserve Shutdown Hours -0 118.5
14. Hours Generator On. Line 744. 0 3 992.0 18 351."2
15. Unit Reserve Shutdown Hours ~, 21.0
16. Gross Thermal Energy Generated (MWH) 1 897 496 9 798 337 44 016 485

'00.0

17. Gross Electrical Energy Generated (MWH) 614 590 3 165 120 14 272 070
18. Net Electrical Energy Generated (MWH) 581 473 2 976 284 13 419 122
19. Unit Service Factor 100. 0 68.5 77.7 20 Unit Availability Factor 68.5 77.8 21 3.1 Unit Capacity Factor (Using DER Net) 97.5 63.6 '70.9
23. Unit Forced Outage Rate 4.7 6.1 Shutdowns Scheduled Over Next 6 Months (Type..Date. and Duration of Each):

Outa e to erform ins ections re uired by TE Bulletin No s. 79-13 and 79-14 Se tember 23 October 8, 1979

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'i/77 )

r

~ IL LL ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

1979 COMPLETED BY REPORT MONTII AUGUST L

o o Licensee Cause & Corrective El 4/ CP V<<L. Date Event Action to RepLlrt sr L/1 Cr Prcvcnt Recurrence

~ Lll g NONE 4

F: Forced Reason: Method: Exhibit G ~ Instructions S: Schcdulctl A-Equipment Failure (Explain) I -Manual for Preparation of Data B.hlaintenancc or Test ~

2.Manual Scram. Entry Shccts I'or Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regul at ory Rest riot ion 4.Other (Explain) OI 6I )

E.Operator Training & LICCLtsc Examhlatlon F.Administrative.

G.Operational Error (Explain) Exhibit I - Sante Source ILIt77) II OthCr (EXpiaiLL)

P.O. SOX 529100, MIAMI, FL 33152

~it!Illy~

I~ I~Pi~i,., x~

FLORIOA POWER 4 LIGHT COMPANY September 8, 1979 Office of Management. Znformation and Program Controls U. S. Nuclear. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the August, 1979, Operating Summary Reports for Turkey Point Unit Nos,. 3 and. 4 and St,. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE ~ ~ ~ SERVING PEOPL-"

SU OF OPERATING EM'ERiENC DOCKET NO. 50 250 Turkey Point, UNIT Unit No. 3 DATE Se t. 8 1979'OMPLETED BY V. T. Chil son

'TELEPHONE, 305) 552-3824

~ REPORT MONTH 'UGUST; 1979 Unit operated at. approximately 100~ R.P. except for outages of August, 0

3 and August 8-14, 1979. Refer to "Unit Shutdowns and Power Reductions" secti'on of the August,, 1979, Operating Status. Report for additional information.,

Major Safe'ty-related maintenance activities performed during the month

,included:

Repairing valve packing leaks on valves located inside containment.

SUi& Y OF OPERATlNG EXPER ENC DOCKET NO. 50 251 Turkey Point.

UNZT Unit No. 4 DATE Sept. 8, 1979 COMPLETED BY hilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST 1979 Unit operated. at approximately 100% R.P; except for outages of August 3, 5, and 22-Z8, 1979. Refer to "Unit Shutdowns and Power Reductions" section of the. August, 1979 Operating Status Report for additional operation.

Major Safety-related maintenance activities performed during the month included:

Replaced. failed motor bearing on reactor coolant pump 'motor No. 4A.

Repaired oil leak on reactor coolant pump motor No.. '4A.

SUMlt' 0 P POCKET NO. '0 335 St. Lucie Unit No. 1 DATE Se t. 8, 1979 COMPLETED BX '. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST, 1979 operated. at approximately 100% R;P.

I'nit No Major Safety-related. maintenance was performed during the month.