ML20197G021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20197G021
| number = ML20197G021
| issue date = 05/13/1986
| issue date = 05/13/1986
| title = Advises That Commitments Noted in Util 830610 Ltr,Describing Steps to Be Taken to Resolve Open Issues Re Organization & Staffing,Fulfilled W/Exception of Leak Rate Testing.Qa Surveillance of Operations Will Continue
| title = Advises That Commitments Noted in Util ,Describing Steps to Be Taken to Resolve Open Issues Re Organization & Staffing,Fulfilled W/Exception of Leak Rate Testing.Qa Surveillance of Operations Will Continue
| author name = Clark P
| author name = Clark P
| author affiliation = GENERAL PUBLIC UTILITIES CORP.
| author affiliation = GENERAL PUBLIC UTILITIES CORP.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 5211-86-2048, CLI-84-18, CLI-85-02, CLI-85-2, NUDOCS 8605160093
| document report number = 5211-86-2048, CLI-84-18, CLI-85-02, CLI-85-2, NUDOCS 8605160093
| title reference date = 06-10-1983
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| page count = 3
Line 24: Line 25:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. OPR-50 Docket No. 50-289 GPU Nuclear Corpcration Organization and Staffing In the Spring of 1983, the NRC staff identified a number of "open issues" as affecting the ability to complete the TMI-l restart proceeding.
Operating License No. OPR-50 Docket No. 50-289 GPU Nuclear Corpcration Organization and Staffing In the Spring of 1983, the NRC staff identified a number of "open issues" as affecting the ability to complete the TMI-l restart proceeding.
By letter dated June 10, 1983, GPU noted the staff's position and described the GPU Nuclear organization and staffing and the bases foi-confidence in their capability and integrity.                It also identified steps which were being taken to provide additional assurance "during the period necessary to resolve the open issues".
By {{letter dated|date=June 10, 1983|text=letter dated June 10, 1983}}, GPU noted the staff's position and described the GPU Nuclear organization and staffing and the bases foi-confidence in their capability and integrity.                It also identified steps which were being taken to provide additional assurance "during the period necessary to resolve the open issues".
The steps identified in the June 10, 1983 letter included:
The steps identified in the {{letter dated|date=June 10, 1983|text=June 10, 1983 letter}} included:
                 "We will, prior to restart, add full-time on-shif t operational quality assurance coverage by degreed engineers until the open issues are resolved."
                 "We will, prior to restart, add full-time on-shif t operational quality assurance coverage by degreed engineers until the open issues are resolved."
                 "We will reassign personnel such that those functions which provide an overview assessment, analysis, or audit of plant activities specifically:
                 "We will reassign personnel such that those functions which provide an overview assessment, analysis, or audit of plant activities specifically:
Line 42: Line 43:
     'Mr. Harold Denton                                                      5211-86-2048 Nuclear, including use in overview assessment, analysis or audit of TMI-l plant activities."
     'Mr. Harold Denton                                                      5211-86-2048 Nuclear, including use in overview assessment, analysis or audit of TMI-l plant activities."
i The June,1983 commitments described above were to apply "until the open issues are resolved". GPU Nuclear is satisfied that, with the exception of TMI-2 leak rate testing to which the Commission restart condition is addressed, they ara resolved.
i The June,1983 commitments described above were to apply "until the open issues are resolved". GPU Nuclear is satisfied that, with the exception of TMI-2 leak rate testing to which the Commission restart condition is addressed, they ara resolved.
This letter is to advise that the commitments of the June 10, 1983 letter have been fulfilled.            Therefore, subject to the limitations of the Commission's Restart Order:
This letter is to advise that the commitments of the {{letter dated|date=June 10, 1983|text=June 10, 1983 letter}} have been fulfilled.            Therefore, subject to the limitations of the Commission's Restart Order:
: 1)  Beginning June 1,1986 and as opportunities arise, we plan to utilize persons who were Meted exempt employees at TMI-l or 2 before the TMI-2 accident in such TMI-1 functions as Independent On-site Safety Review Group, shift technical advisor, and QA audit for which they qualify.
: 1)  Beginning June 1,1986 and as opportunities arise, we plan to utilize persons who were Meted exempt employees at TMI-l or 2 before the TMI-2 accident in such TMI-1 functions as Independent On-site Safety Review Group, shift technical advisor, and QA audit for which they qualify.
: 2)  We plan to continue QA surveillance of operations at THI-l as required by our Quality Assurance Plan.                  We expect to include persons with technical degrees among those conducting such surveillances.              We will        include some backshift      and        weekend  coverage.      However,          after June 1, 1986 it will not continue as full-time coverage.
: 2)  We plan to continue QA surveillance of operations at THI-l as required by our Quality Assurance Plan.                  We expect to include persons with technical degrees among those conducting such surveillances.              We will        include some backshift      and        weekend  coverage.      However,          after June 1, 1986 it will not continue as full-time coverage.

Latest revision as of 22:48, 8 December 2021

Advises That Commitments Noted in Util ,Describing Steps to Be Taken to Resolve Open Issues Re Organization & Staffing,Fulfilled W/Exception of Leak Rate Testing.Qa Surveillance of Operations Will Continue
ML20197G021
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/13/1986
From: Phyllis Clark
GENERAL PUBLIC UTILITIES CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
5211-86-2048, CLI-84-18, CLI-85-02, CLI-85-2, NUDOCS 8605160093
Download: ML20197G021 (3)


Text

- _ - _ . _ _ _ _ _ _ _ _ _ _ _ _ _

GPU Nuclear NUCIMr 100 Interpace Parkway Parsippany. New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number May 13, 1986 5211-86-2048 ' (201) 263-6797 Mr. Harold Denton, Director '

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, DC 20555

Dear Mr. Denton:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. OPR-50 Docket No. 50-289 GPU Nuclear Corpcration Organization and Staffing In the Spring of 1983, the NRC staff identified a number of "open issues" as affecting the ability to complete the TMI-l restart proceeding.

By letter dated June 10, 1983, GPU noted the staff's position and described the GPU Nuclear organization and staffing and the bases foi-confidence in their capability and integrity. It also identified steps which were being taken to provide additional assurance "during the period necessary to resolve the open issues".

The steps identified in the June 10, 1983 letter included:

"We will, prior to restart, add full-time on-shif t operational quality assurance coverage by degreed engineers until the open issues are resolved."

"We will reassign personnel such that those functions which provide an overview assessment, analysis, or audit of plant activities specifically:

D-- General Office Review Board g Independent On-Site Safety Group g $ L. Shift Technical Advisors

-N$ Q/A Audit (Q% Q/A and Q/C Site Staff gt g > Licensing Radiation Control w Emergency Preparedness O will contain only personnel with no pre-accident involvement as

% employees at TMI-l or 2. We will continue this constraint until the open issues are effectivelv resolved."

bDO n GPU Nuclear is a part of the General Public Utikties System

Nr. Harold Denton 5211-86-2048 Since June of 1983, the "open issues" have been the subject of a number of investigations. The Commission in its February 25, 1985 Memorandum and Order (CLI-85-2) addressed the results of investigations of the open issues and found that further hearings within the TMI-l restart proceeding were not warranted. The Commission stated that in its analysis it did not rely on either of the commitments listed above. The Commission did state, however, its intention to institute a hearing separate from the TMI-l restart proceeding to determine the ultimate status of those likely involved in the TMI-2 leak rate falsifications and established a requirement to provide assurance that "none of those likely involved in the TMI-2 falsifications, or who had direct management supervision over operations, occupy responsible management or operational positions at TMI-l without specific Commission approval". That requirement was made a condition for TMI-l restart.

As reflected in the June 1983 letter, our intent was and is to remove restrictions on assignment of our employees as soon as possible. This was confirmed in " Licensee Comments in Response to CLI-84-18 filed with the Commission on October 9, 1984 which said:

"With regard to reassignment of those employees temporarily reassigned or barred from certain future assignments by Licensee until the open issues were resolved, Licensee desires to have the ability to use each of them within its nuclear activities without restriction at the earliest date possible. We would expect that completion of the investigations now underway and any NRC assessment of the results would result in an overall conclusion that anyone not specifically identified as having behaved improperly would no longer need to be restricted by us or anyone else with regard to nuclear activities. We believe that these employees are, in fairness, entitled to no less."

"The great majority of the GPU System employees who have been temporarily reassigned or barred from certain future assignments until the open issues are resolved have invested a significant part of their lives in acquiring their nuclear training and skills. They should not be deprived of the opportunity to utilize that training and these skills as an employee of the Licensee or any other organization with which they may be associated in the future, unless there is substantial evidence to establish that this is required by the public interest or by violation of the employment and corporate policies of their employer . . ."

" Attachment I is a list of the Meted exempt employees at TMI in March, 1979, showing those specifically addressed and those reassigned in accordance with Mr. Dieckamp's letter of June 10, 1983. The current assignment of those individuals (i.e., with GPU Nuclear, with other GPU System companies, or no longer with the GPU System) is identified. GPU Nuclear is interested in resolving any open questions so as to permit unrestricted use of all of these employees now employed by GPU

4

'Mr. Harold Denton 5211-86-2048 Nuclear, including use in overview assessment, analysis or audit of TMI-l plant activities."

i The June,1983 commitments described above were to apply "until the open issues are resolved". GPU Nuclear is satisfied that, with the exception of TMI-2 leak rate testing to which the Commission restart condition is addressed, they ara resolved.

This letter is to advise that the commitments of the June 10, 1983 letter have been fulfilled. Therefore, subject to the limitations of the Commission's Restart Order:

1) Beginning June 1,1986 and as opportunities arise, we plan to utilize persons who were Meted exempt employees at TMI-l or 2 before the TMI-2 accident in such TMI-1 functions as Independent On-site Safety Review Group, shift technical advisor, and QA audit for which they qualify.
2) We plan to continue QA surveillance of operations at THI-l as required by our Quality Assurance Plan. We expect to include persons with technical degrees among those conducting such surveillances. We will include some backshift and weekend coverage. However, after June 1, 1986 it will not continue as full-time coverage.

If you have any questions on this matter, we would be pleased to respond.

Sincerely, P. R. Clark 4 President 1

pfk 1245 cc: The Honorable Richard Thornburgh, Governor of Pennsylvania Dr. Frank M. Wright, Secretary, Governor's Office Policy and Planning Mr. Frank J. Miraglia, Jr., Deputy Director, Division of Licensing, NRC Dr. Thomas E. Murley, Regional Administrator, Region 1, NRC Mr. John F. Stolz, Chief, Operating Reactors, Branch 4, NRC Mr. James M. Taylor, Director, Office of Inspection & Enforcement, NRC Mr. John 0. Thoma, TMI-l Project Manager, NRC 4