ML20137M828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000530/1985020]]
{{Adams
| number = ML20137M828
| issue date = 08/28/1985
| title = Forwards Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation Noted
| author name = Kirsch D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name = Van Brunt E
| addressee affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| docket = 05000530
| license number =
| contact person =
| document report number = NUDOCS 8509130379
| package number = ML20137M833
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000530/1985020]]
 
=Text=
{{#Wiki_filter:3
  -
                                                                                0
                                                                            I Ull
.
                                      RUG 2 81985
    Docket No. 50-530
    Arizona Nuclear Power Project
    P. O. Box 52034
    Phoenix, Arizona 85072-2034
    Attention:    Mr. E. E. Van Brunt, Jr.
                  Executive Vice President
                                                              -
                                          _
    Gentlemen:
        ject: NRC Inspection of Palo Verde Unit 3
    This refers to the inspection conducted by Mr. W. J. Wagner of this office on
    July 29 - August 2, and August 12-16, 1985, of activities authorized by NRC
    Construction Permit No. CPPR-143, and to the discussion of our findings held
    with members of your staff at the conclusion of the inspection.
    Areas examined during this inspection are described in the enclosed inspection
    report. Within these areas, the inspection consisted of selective
    examinations of procedures and representative records, interviews with
    personnel, and observations by the inspector.
    No violations of NRC requirements were identified within the scope of this
    inspection.
    In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
    will be placed in the NRC Public Document Room.
    Should you have any questions concerning this inspection, we will be glad to
    discuss them with you.
                                        Sincerely,    W3"d          I
                                                          D. f. radt
                                        D. F. Kirsch, Acting Director
                                        Division Reactor Safety and Projects
    Enclosure:
    Inspection Report No. 50-530/85-20
    cc w/ enclosure:
    J. Bynum, ANPP
    S. R. Frost, ANPP
    T. D. Shriver, ANPP
    W. E. Ide, ANPP
    C. N. Russo, ANPP
    J. Morrison
    L. Bernabei, GAS
    A. C. Gehr, Edg., Snell & Wilmer
    Duke Railsback, Arizona Corp. Comm.
    bec: RSB/ Document Control Desk (RIDS)
    Mr. J. Martin;    Mr. B. Faulkenberry; Resident Inspector-    Project Inspector
    Wa r:dh              .TYoung        LMil  r        [Cm.f
                                                        A
                                                            g
                                                                  fc-e  DKirs.h
    8/" /85                8/ K/85      8/2    85      8/M/85          8/    /85
                8509130379 G50028                                                  k \
                PDR    ADOCK 05000530                                        j
                G                  PDR                                            g-
                                                                                  -
}}

Latest revision as of 05:30, 2 September 2020

Forwards Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation Noted
ML20137M828
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/28/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20137M833 List:
References
NUDOCS 8509130379
Download: ML20137M828 (1)


See also: IR 05000530/1985020

Text

3

-

0

I Ull

.

RUG 2 81985

Docket No. 50-530

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention: Mr. E. E. Van Brunt, Jr.

Executive Vice President

-

_

Gentlemen:

ject: NRC Inspection of Palo Verde Unit 3

This refers to the inspection conducted by Mr. W. J. Wagner of this office on

July 29 - August 2, and August 12-16, 1985, of activities authorized by NRC

Construction Permit No. CPPR-143, and to the discussion of our findings held

with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely, W3"d I

D. f. radt

D. F. Kirsch, Acting Director

Division Reactor Safety and Projects

Enclosure:

Inspection Report No. 50-530/85-20

cc w/ enclosure:

J. Bynum, ANPP

S. R. Frost, ANPP

T. D. Shriver, ANPP

W. E. Ide, ANPP

C. N. Russo, ANPP

J. Morrison

L. Bernabei, GAS

A. C. Gehr, Edg., Snell & Wilmer

Duke Railsback, Arizona Corp. Comm.

bec: RSB/ Document Control Desk (RIDS)

Mr. J. Martin; Mr. B. Faulkenberry; Resident Inspector- Project Inspector

Wa r:dh .TYoung LMil r [Cm.f

A

g

fc-e DKirs.h

8/" /85 8/ K/85 8/2 85 8/M/85 8/ /85

8509130379 G50028 k \

PDR ADOCK 05000530 j

G PDR g-

-