* consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 RE: License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:
    .1
DEC--81975 U.o. A1"; ... c:*1tiHil'
* consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 DEC--81975 U.o. A1";... ~ c:*1tiHil'
,,..,.\ COMMISSION
                                                                ,,..,.\          COMMISSION
*. ft **"i'iarory Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975. Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 13648  
                                                                        *.       ft **"i'iarory U.S. Nuclear Regulatory Commission Mail and Records Section
;. . .-. .
                                                              ~~-?
-.... *. APPENDIX D* . ' Palisades UNIT--------
Washington, D.C. 20555 RELicense Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:
DATE __ . COMPLETED BY H. R. Vernick DOCKET
Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975.
___ _ OPERATING STATL'S . I. REPORTll'\G PERIOD: 75110i THROUGH __
Howard R. Vernick Associate Engineer CC:  JGKeppler, NRC RBDeWitt RBSewell 13648
HOURS IN REPORTl:'\G PERIOD: ___ 7_2_0 __ -_,---------------------,,..,,..,...--
 
: 2. CUR RE NTL Y ACTHORIZED POWER LEVEL 2200 MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3.. LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):
APPENDIX D*
__ 3_0 _______ _ .4.
Palisades UNIT--------
FOR J3.ESTRICTION (IF AN_Y): s. 6. 7. 8. 9 *. 10: 11. 12. 13. 14. 15. 17. 18. THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL.
((**--.-~                                                                                                              DATE _ _l_2..:.../~3~/7~5--~
...* : *******. REACTOR RESER VE SHUTDOWN HOURS ******* HOURS GENERA TOR ON LINE.* .. .*. ******* \JNJT RESERVE SHUTDOWN HOURS . * .. : .**. * ** .'
- ....  ~                                                                                                  . COMPLETED BY           H. R. Vernick
GENERA TED  
                          .'                                                                                    DOCKET N0~_..:...5_0_-_2.:....5.:....5_ _ __
.**** ; ***************
OPERATING STATL'S
GROSS.ELECi:RICAL ENERGY <;EXE RA  
            . I. REPORTll'\G PERIOD:                 75110i                                   THROUGH _ _7_,_5'"'1=1=-3.:...0~--------
... , .......*..****.  
HOURS IN REPORTl:'\G PERIOD: _ _ _              7_2_0__-_,---------------------,,..,,..,...--
* ** NET ELECTRICAL ENERGY GENERATED (MWll) ***.******.*.**.*.********  
: 2. CUR RE NTL Y ACTHORIZED POWER LEVEL (~1Wth). 2200                           MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3.. LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _3_0________
-** REACTOR AVAILABILITY FACTOR (1) *********
              .4. REASO~S    FOR J3.ESTRICTION (IF AN_Y):
UNIT AVAILABILITY FACTOR (2) .**..*******.
THIS                                              CUMULATIVE REPORTING PERIOD            YR TO DATE                        TO DATE
l 1 NIT C'AP.-\Cl"!Y FACTOR (3) .....*.********
: s. HOURS REACTOR WAS CRITICAL. . . . * : *******.                                 720                  5;386.5                        15 ,623. 4--".
l'NIT FORCED Ol!T.AGE RATE (4) .......*****
0                            0
720 720 0 1,212,960 368,220 341,+48. 1QO% 100% 69.3% 0% YR TO DATE 5;386.5 0 5,189.1 0 8,367,432 2,487,550 2,289,375 67.2% . 64*.1% 41. 8% 34.5% CUMULATIVE TO DATE 15 ,623. 4--". 0 -----14,510.2 0 22,48ci,992 6,991,800 6,543,080
  *.          6.
: 45. 5% . 42.3% .. * . 3i. 5% sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH): IF SllCT DOWN .-\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: ____________
7.
_ UNITS IN TEST ST.-\ TL'S" RIOR TO OPERATION)
REACTOR RESER VE SHUTDOWN HOURS HOURS GENERA TOR ON LINE.*.. ~ .*. ~ *******
REPORT THE FOLLOWING:
720                  5,189.1                -----  14,510.2
INITlr\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED (I) . R,EAC'TOR r\ \'AILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 (2) l:NIT AVAILABILITY FACTOR U-ilT FORCED Ol'TAGE RATE HOURS GENERATOR ON LINE ---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\TR
: 8.    \JNJT RESERVE SHUTDOWN HOURS . *.. : .**.* ** .'                                   0                          0                            0 9 *. GROSSTHER~ALENERGY GENERA TED       (~1WH)  .**** ; ***************                     1,212,960              8,367,432                      22,48ci,992 10:      GROSS.ELECi:RICAL ENERGY
*MAX. Dl*.l'ENl>ABLE CAPACITY X HOURS IN REPORTING l'ERIU() FORCED QL:TAGE llQL:RS HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l I *-, .
                    <;EXE RA TED.(~IWll) . . . , . . . . . . . * . . * * * * . * **             368,220            2,487,550                          6,991,800
t"*** a Cs h'ir *ntr 0 01&deg;t"t tr; . tt'Mh 0 . \ TYPE F*FORCED DURATION NO. DATE S*SCHEDULED (HOU.RS) Nori.e --&deg;' rr. -. ' * . : . .. '.  
: 11.      NET ELECTRICAL ENERGY GENERATED (MWll)   * * * . * * * * * * . * . * * . * . * * * * * * * * - **
*.
341,+48.          2,289,375                          6,543,080
-----*--*
: 12.      REACTOR AVAILABILITY FACTOR (1) * * * * * * * *
.........
* 1QO%                    67.2%                            45. 5% .
-_. ...... _. ------------
: 13.      UNIT AVAILABILITY FACTOR (2) .**..*******.                               100%                  . 64*.1%                          42.3% .. * .
...  
: 14.      l 1NIT C'AP.-\Cl"!Y FACTOR (3)         .....*.********
*-0 APPENDIX E UNIT SHUTDOWNS .o. DOCKET NO. 50-255 --------------
69.3%                41. 8%                          3i. 5%
UN IT NAME Palisades Nuclear Plant
: 15.      l'NIT FORCED Ol!T.AGE RATE (4) . . . . . . . * * * *
* DATE J2/3/75 .COMPLETED UY H'. R. Vernick . . . ' -. , REPORT MONTH November, 1975 ' . METHOD OF DOWN REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS
* 0%                   34.5%
' ,' '. . I -, ,, : . : '. "--' (1) REASON (2) MF.TH OD . A--EQUIPMENT FAILURE"(EXPLAIN) 1-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I . 0-REGULATORY RESTRICTION 3-AUTOMATIC*
            ~~-      sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH):
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION
: 17.     IF SllCT DOWN .-\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
.. F-ADMINISTRATIVE
: 18.     UNITS IN TEST ST.-\ TL'S" RIOR TO           cml~IERCIAL      OPERATION) REPORT THE FOLLOWING:
--". G-Ol'ERA TIONAL ERROR (EXPLAIN)
DATE LAST                    DATE FORECAST                  ACHIEVED INITlr\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)    . R,EAC'TOR r\ \'AILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2)      l:NIT AVAILABILITY FACTOR                        ---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\TR      GF~F.RATED
'' . ' *-H-OTHER (EXPLAIN)
                                                                        *MAX. Dl*.l'ENl>ABLE CAPACITY    (~!We-NET)  X HOURS IN REPORTING l'ERIU()
,, '. ; . " : *' ., I ., . SIJjJIMARY:
FORCED QL:TAGE llQL:RS U-ilT FORCED Ol'TAGE RATE                          -----~---~--~--------~-xtoo HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l
The un::\.t operated at* 70..,.80%
 
for the *month of Nb'lremper . -* *' : ' . ' . ' .. '. t' 
t"***
..... .. . .. -* " APPENDIX C ,.
a 'it**~,
* DOCKET NO. 50-255 . . UNIT Palisades*
                    ,-~.
Nuclear Plant DATE 12/3/75 COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWc-nct)
Cs h'ir *ntr 0 01&deg;t"t tr; . tt'Mh                                  /-~;-).........-_.......  ------------...                   *--~~--------"'
DAY (MWe-net) 1 .. 191 17*. *485 2 . 438. 18. 487 / 3 --47:1 .. .19' 487 4 479 20 486 5 483 21 487 6' 485 .* *22 489 '" 7 478 23 488 . 8 *485 24 * .... .490 9 .481 25 484 10 484 . 26 . 484 1r 486 27. . 487 12 488 28 490 13 488 29. 483 __ , 14 489 30 486 1'5 488 31 487 . ... 16 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS
                                                                                                                                                                                        *.   ~"~* -----*--*
*.On this form, list the average daily unit power level in M\Ve-net for each day in the reporting month. Compute to the nearest whole megawatt.
I
These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the . .. average daily unit power output sheet should be footnoted to explain the apparent anomaly. ( . . . . ... ... ..... 1
                                                                                                                                                                                        .o.
* l . . * . . . * . * . . . . . .. '
                                                                        \
'.'-
0                                                                                                    ..
... c :;y:;zi;t ti 5Y,J&
0                                                                        APPENDIX E                                                          DOCKET NO.
.. Q
50-255 UNIT SHUTDOWNS                                                          UN IT NAME Palisades Nuclear Plant
-. . ' ! '}}
* DATE          J2/3/75
                                                                                                                                                            .COMPLETED UY H'. R. Vernick REPORT MONTH November, 1975 TYPE                                               METHOD OF F*FORCED       DURATION                         ~HUTTING                  DOWN NO.         DATE         S*SCHEDULED (HOU.RS)         REASON (1)            THE REACTOR (2)                                  CORRECTIVE ACTIONS/COMMENTS Nori.e I
      --&deg;'                                                                                                     ,,
rr.             . '                                                                           .                       '.
(1) REASON                                (2) MF.TH OD A--EQUIPMENT FAILURE"(EXPLAIN)            1-MANUAL B- MAINT. OR TEST                        2-MANUAL
                                                                                  .                                                         C- REFUELING 0-REGULATORY RESTRICTION SCRAM I 3-AUTOMATIC*
E-Ol'ERATOR TRAINING AND                      SCRAM LICENSE EXAMINATION
:                      ".         ..                                               F-ADMINISTRATIVE G-Ol'ERA TIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
              . SIJjJIMARY:        The un::\.t operated at* 70..,.80% for the *month I
of      Nb'lremper .
                                                                                                                                                                                    '.t'
 
APPENDIX C
* DOCKET NO.                         50-255 . .
UNIT Palisades* Nuclear Plant DATE                   12/3/75 COMPLETED BY                            H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH                         November, 1975 AVERAGE DAILY POWER LEVEL                                                        AVERAGE DAILY POWER LEVEL DAY                                          (MWc-nct)                             DAY                                      (MWe-net) 1                                      .. 191                                    17*.                                        *485                                        ...
                                                                                                                                                                                                        ..... 1
* 2                                           . 438.                               18.                                           487
                                                                                                                    /
3                                          --47:1 ..                             .19'                                          487 4                                            479                                20                                            486 5                                            483                                21                                            487 6'                                            485 .*                            *22                                            489                                      '"
7                                            478                                23                                            488 .
                                                                    *485                                            ....
                                                                                                                                                      .490 8                                                                                24 9                                          .481                                  25                                            484 484                            . 26                                          . 484 10 1r                                                486                                27.                                       . 487 12                                                488                                28                                            490 13                                                488
__ ,                             29.                                           483 14                                                489                                30                                            486 1'5                                              488                                31
                                                                                                                                        . ~ ...
16                                                487 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS
                  *.On this form, list the average daily unit power level in M\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily l . .*..* .*
average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the
. ..               average daily unit power output sheet should be footnoted to explain the apparent anomaly.
J.l~.C*I        .                                                    . ..             .   ..
    '   ~)!'!>>,JN* '.'- Hh':ff~... c ~ :;y:;zi;t ti 5Y,J& ~*V1:~&#xa5;fl.".'i'?'_::'**' v~,,..~-"'iM'I ..Q .iii(@.'"'&#xa5;19!.'f:Xt~i*if."f"J;::Ut."~"':'Jt.l''~*'*~.~~."'*"''(*.c ""'~'~fP?!!ii 9.'i}*#.t.~*~~*,.l           -
                                                                              .   .                                                                                                                               ' !}}

Latest revision as of 21:36, 22 February 2020

Monthly Operating Data for November 1975
ML18347A831
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/03/1975
From: Vernick H
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A831 (4)


Text

...

.1

  • consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 DEC--81975 U.o. A1";... ~ c:*1tiHil'

,,..,.\ COMMISSION

  • . ft **"i'iarory U.S. Nuclear Regulatory Commission Mail and Records Section

~~-?

Washington, D.C. 20555 RE: License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975.

Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 13648

APPENDIX D*

Palisades UNIT--------

((**--.-~ DATE _ _l_2..:.../~3~/7~5--~

- .... ~ . COMPLETED BY H. R. Vernick

.' DOCKET N0~_..:...5_0_-_2.:....5.:....5_ _ __

OPERATING STATL'S

. I. REPORTll'\G PERIOD: 75110i THROUGH _ _7_,_5'"'1=1=-3.:...0~--------

HOURS IN REPORTl:'\G PERIOD: _ _ _ 7_2_0__-_,---------------------,,..,,..,...--

2. CUR RE NTL Y ACTHORIZED POWER LEVEL (~1Wth). 2200 MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3.. LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _3_0________

.4. REASO~S FOR J3.ESTRICTION (IF AN_Y):

THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE

s. HOURS REACTOR WAS CRITICAL. . . . * : *******. 720 5;386.5 15 ,623. 4--".

0 0

  • . 6.

7.

REACTOR RESER VE SHUTDOWN HOURS HOURS GENERA TOR ON LINE.*.. ~ .*. ~ *******

720 5,189.1 ----- 14,510.2

8. \JNJT RESERVE SHUTDOWN HOURS . *.. : .**.* ** .' 0 0 0 9 *. GROSSTHER~ALENERGY GENERA TED (~1WH) .**** ; *************** 1,212,960 8,367,432 22,48ci,992 10: GROSS.ELECi:RICAL ENERGY

<;EXE RA TED.(~IWll) . . . , . . . . . . . * . . * * * * . * ** 368,220 2,487,550 6,991,800

11. NET ELECTRICAL ENERGY GENERATED (MWll) * * * . * * * * * * . * . * * . * . * * * * * * * * - **

341,+48. 2,289,375 6,543,080

12. REACTOR AVAILABILITY FACTOR (1) * * * * * * * *
  • 1QO% 67.2% 45. 5% .
13. UNIT AVAILABILITY FACTOR (2) .**..*******. 100% . 64*.1% 42.3% .. * .
14. l 1NIT C'AP.-\Cl"!Y FACTOR (3) .....*.********

69.3% 41. 8% 3i. 5%

15. l'NIT FORCED Ol!T.AGE RATE (4) . . . . . . . * * * *
  • 0% 34.5%

~~- sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH):

17. IF SllCT DOWN .-\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ _ __
18. UNITS IN TEST ST.-\ TL'S" RIOR TO cml~IERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITlr\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) . R,EAC'TOR r\ \'AILABILITY FACTOR HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE (2) l:NIT AVAILABILITY FACTOR ---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\TR GF~F.RATED

  • MAX. Dl*.l'ENl>ABLE CAPACITY (~!We-NET) X HOURS IN REPORTING l'ERIU()

FORCED QL:TAGE llQL:RS U-ilT FORCED Ol'TAGE RATE -----~---~--~--------~-xtoo HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l

t"***

a 'it**~,

,-~.

Cs h'ir *ntr 0 01°t"t tr; . tt'Mh /-~;-).........-_....... ------------... *--~~--------"'

  • . ~"~* -----*--*

I

.o.

\

0 ..

0 APPENDIX E DOCKET NO.

50-255 UNIT SHUTDOWNS UN IT NAME Palisades Nuclear Plant

  • DATE J2/3/75

.COMPLETED UY H'. R. Vernick REPORT MONTH November, 1975 TYPE METHOD OF F*FORCED DURATION ~HUTTING DOWN NO. DATE S*SCHEDULED (HOU.RS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS Nori.e I

--°' ,,

rr. . ' . '.

(1) REASON (2) MF.TH OD A--EQUIPMENT FAILURE"(EXPLAIN) 1-MANUAL B- MAINT. OR TEST 2-MANUAL

. C- REFUELING 0-REGULATORY RESTRICTION SCRAM I 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION

". .. F-ADMINISTRATIVE G-Ol'ERA TIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

. SIJjJIMARY: The un::\.t operated at* 70..,.80% for the *month I

of Nb'lremper .

'.t'

APPENDIX C

  • DOCKET NO. 50-255 . .

UNIT Palisades* Nuclear Plant DATE 12/3/75 COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWc-nct) DAY (MWe-net) 1 .. 191 17*. *485 ...

..... 1

  • 2 . 438. 18. 487

/

3 --47:1 .. .19' 487 4 479 20 486 5 483 21 487 6' 485 .* *22 489 '"

7 478 23 488 .

  • 485 ....

.490 8 24 9 .481 25 484 484 . 26 . 484 10 1r 486 27. . 487 12 488 28 490 13 488

__ , 29. 483 14 489 30 486 1'5 488 31

. ~ ...

16 487 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS

  • .On this form, list the average daily unit power level in M\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily l . .*..* .*

average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the

. .. average daily unit power output sheet should be footnoted to explain the apparent anomaly.