{{#Wiki_filter:*. NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES . CHANGE TYPE: ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE 1\71 PERMANENT D *TEMPORARY lC.J (GREEN) (ORANGE) *EXPIRES:
{{#Wiki_filter:NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES                               .
ALL ON*THE*SPOT CHANGES TO BE CONSIDERED  
ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:
!="OR APPLICABILITY TO BOTH UNITS. [ZJ UNIT I UNITZ PROCECURENO.
1\71 lC.J PERMANENT (GREEN)
___  
D    *TEMPORARY (ORANGE)
........
                                                                                                        *EXPIRES:
______ ___ REV. NO. __ \ ___ CHANGE No._\..__
ALL ON*THE*SPOT CHANGES TO BE CONSIDERED !="OR APPLICABILITY TO BOTH UNITS.
__
[ZJ   UNIT I PROCECURENO. ___     \~\=>--.....\J...._-_\~B........
.......
                                                                  *~'~*~O~L~~q--*_________      REV. NO. _ _\_ _ _ CHANGE No._\..___ _
______ _ \ REV. NO._--.. __ CHANGE NO._.;__ __ PROPOSED CHANGE: <a.'d-,.\.L\, res.:1-,.s, B. \ J '8. d.. \. C\ ) CC> . d-L \ u REASON FOR CHANGE: ACTION TAKEN FOR OTHER UNIT: &deg;SP.W'Q.. AUTHORIZATION:  
  ~    UNITZ  PROCECURENO.~~c:9-.---..?n.......~-__.\~B-'_*~\-*___,OQ~-C\_,________            REV. NO._--.._ _ CHANGE NO._.;___ _\
**S ERViORIN CHARGE OR SHIFT SUPERVISOR -SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO UNITS HAS BEEN CONSIDERED.
PROPOSED CHANGE:
ACCEPTABLE:
                                  <a.'d-,.\.L\,           res.:1-,.s,           e.~,.,1.1_,      ca.~\.\\;i  1    A~~      B.~\,\'1 B. ~'- \         J
POST CHANGE-REVIEW/APPROVAL I D () D . :' SORC \:HAIRMAN) l?tl I MANAGER.*
                                                                '8. d.. \. C\ )   CC> . d-L \ u REASON FOR CHANGE:
SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW*UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN: ' 8303160573 830314 PDR ADOCK 05000272 S PDR. PERFORMED BY: SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE. DATE DATE 
ACTION TAKEN FOR OTHER UNIT:
*\
                  &deg;SP.W'Q..     ~
* PROCEDURE:
AUTHORIZATION:       ~**S ERViORIN
REMARKS:
:.;~  CHARGE
* REV 1 SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET RELATED lPD-18.1.009  
                                                                                                                            ~ DATE OR SHIFT SUPERVISOR
-SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST -TRAIN B REV. 1 -General Revision to incorporate Changes . PERF. ENGR. APPROVED SORC REVIEWED STA. SUPT. APPROVED   
  -SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO                   ~OTH  UNITS HAS BEEN CONSIDERED.
*' 'x SALEM GENERATING STATION NUMBER -lPD-18 .1. 009
ACCEPTABLE:                         POST CHANGE-REVIEW/APPROVAL I ~I      D                 ()l!!clratt'-
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO.
      ~        D             .19K~THEAD c:~:I'"t:J"'.3 ~ ~  .                 :'           SORC \:HAIRMAN) l?tl             I                     ~r~
MANAGER.* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW*UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
    ' 8303160573 830314 PDR ADOCK 05000272 S                     PDR.
PERFORMED BY:
SIGNATURE                                           DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE.
 
  *\
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET   SAF~TY    RELATED PROCEDURE:
lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS:  FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .
PERF. ENGR. SORC     STA. SUPT.
REV                                      APPROVED     REVIEWED  APPROVED 1
 
'x SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 009
* PERFORMANCE DEPARTMENT (I & C)              REV. NO. _l~------
DATE        _5~/~2~4~/~8~2_______
TEST PROCEDURE PAGE 1              50
                                                                  --- OF TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==1.0 Purpose==
l*.1 The purpose of this procedure is to verify the operability of Solid State Protection System Train B.
1.2  To satisfy the train surveillance requirement of the technical specifications *
* 2.0 
 
==References:==
 
2ol  Solid State Protection System Manual.
2.2  Wiring Diagrams:    203688, 2~2885,  224305
:I
                                              \
 
*' x SALEM GENERATING STATION                   NUMBER -     lPD-18 .1. 009
**     PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
DATE
DATE
______ _ PAGE 1 OF 50 TITLE 1.0 ---SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B Purpose: l*.1 The purpose of this procedure is to verify the operability of Solid State Protection System Train B. 1.2 To satisfy the train surveillance requirement of the technical specifications
_1_*------------~
*
5/24/82 PAGE 2
* 2.0
                                                                  --- OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


==References:==
==3.0 Precautions==
* 2ol Solid State Protection System Manual. 2.2 Wiring Diagrams:
3.1   Test conditions must be applied to only Train B.       A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test conditions into
: 203688, 224305 '; : I \ 
  **          3.2 both trainsc Test conditions may be applied to one train using its*
. ' *' x ** **
                  . built-in testers, while the opposite train is used to ma~ntain  the plant protection and provide data to       the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO. _1_*
3.3   This procedure must be completed in the sequence given to insure successful completion *
DATE 5/24/82 -------------------
 
PAGE 2 OF 50 ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 3.0 Precautions:
,x SALEM GENERATING STATION                   NUMBER -     lPD-18 .1. 009 REV.NO. 1~~~~~~~
3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition.
* PERFORMANCE DEPARTMENT (I & C)
Therefore, it is extremely important that the doors to only one train at a time are open, 3.2 to preclude the introduction of test conditions into both trainsc Test conditions may be applied to one train using its* . built-in testers, while the opposite train is used to the plant protection and provide data to the demultiplexers.
DATE         5/24/82
If in the process of testing, functions are detected, they can be isolated by fully following the procedures in Section 6 of the Solid State Protection Manual. 3.3 This procedure must be completed in the sequence given to insure successful completion  
                                                            ----~--~-------
            *TEST PROCEDURE                              PAGE 3     OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0   Limitations and Actions:
., ,x SALEM GENERATING STATION NUMBER -lPD-18 .1. 009
4.1   If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standardo This shall be done prior ~o  taking any other corrective action.
* PERFORMANCE DEPARTMENT (I & C) *TEST PROCEDURE REV.NO. __
                                                                              \.._.
DATE 5/24/82 PAGE 3 OF 50 * * ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0 Limitations and Actions: 4.1 If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standardo This shall be done prior taking any other corrective action. 4o2 If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately
4o2   If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately
_ and PD-14.1.001 shall be performed.
_ and PD-14.1.001 shall be performed.
4o3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.
4o3   If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.     Exceptions*
Exceptions*
to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.
to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
4o4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken. \.._. 
4o4   An entry will be made in the Remarks section of this
*X SALEM GENERATING STATION
* procedure indicating any deficiency and the corrective action taken.
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV. NO. ....;;;..l
 
______ _ DATE
*X SALEM GENERATING STATION                 NUMBER -       lPD-18 .1. 009 REV. NO.   ....;;;..l_ _ _ _ _ __
___ _ PAGE _4 __ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 5.0 Test Equipment:
* PERFORMANCE DEPARTMENT (I & C)
Device Name PD No. Recal. Date Fluke (2) Stop Watch *
DATE        _S~/...:2;..;;4-'-/..;;.8=2_ _ __
* SALEM GENERATING STATION lPD-18.1.009
TEST PROCEDURE PAGE _4_ _ OF                   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 5.0   Test Equipment:
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE 1 5/24/82 PAGE _s __ OF 50 TITLE 6 .* 0 *
Device Name             PD No.                 Recal. Date Fluke (2)
* SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B Prerequisites:
Stop Watch
6.1 The individual assigned to perform this procedure 6.2 is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6. Supervisor The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
 
Senior Shift Supervisor/Shift Supervisor Date/Time 603 The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.
SALEM GENERATING STATION                   NUMBER -    lPD-18.1.009 REV. NO. 1
Control Operator SALEM GENERATING STATION lPD-18.1.009
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. 1 DATE 5/24/82 PAGE 6 OF so *
DATE         5/24/82 TEST PROCEDURE                                PAGE _s__  OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:
* TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0 System 7.1 The following conditions must be established and/or verified by the Control Operator.
6.1   The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.
7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position . Safeguard actions which are being blocked by virtue of having been *Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are: 1. Containment Spray 2. Phase A Isolation
Supervisor 6.2  The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 603 The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.
Control Operator
 
SALEM GENERATING STATION                   NUMBER -      lPD-18.1.009
* PERFORMANCE DEPARTMENT (I & C)
REV. NO.     1 DATE         5/24/82 TEST PROCEDURE PAGE   6     OF so TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0   System Line~up:
7.1 The following conditions must be established and/or verified by the Control Operator.
7.1.1     Reactor Trip Bypass Breaker A is open and in the Racked Out position .
* Safeguard actions which are being blocked by virtue of having been *Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are:
: 1. Containment Spray
: 2. Phase A Isolation
: 3. Phase B Isolation
: 3. Phase B Isolation
: 4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator
: 4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator
.x SALEM GENERATING STATION NUMBER -lPD-18 .1. 009
 
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. ---=l=--------
.x SALEM GENERATING STATION                       NUMBER -     lPD-18 .1. 009
DATE 5/24/82 PAGE _7 __ OF 50 TITLE 8.0 *
* PERFORMANCE DEPARTMENT (I & C)                 REV. NO.   ---=l=--------
* SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B Instructions:
DATE         5/24/82 TEST PROCEDURE                                    PAGE _7_ _ OF     50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
8.1 Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC). 8elel Bus #1 TB-110 -11 & 12 VAC 8olo2 Bus #2 TB-210 -11 & 12 VAC 8.1.3 Bus #3 TB-310 -11 & 12 VAC 8.; 1. 4 Bus #4 TB-410 -11 & 12 VAC 8.1.5 Bus #1 TB--654 -2 & 12 VAC 8.2 Open the front doors of Train B Logic Bay and Train B Output Relay Bay. 8. 3---On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1 +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC As Found As Left 8.3.2 +48VDC #2 Required 48.7 + 0.2 VDC As Found . As Left
 
.x SALEM GENERATING STATION NUMBER -lPD-18 .1. 009
==8.0 Instructions==
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO.
8.1   Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).
* l DATE 5/24/82 PAGE ---..8 __ OF 50 *
8elel     Bus #1 TB-110 - 11   & 12             VAC 8olo2     Bus #2 TB-210 - 11 & 12                 VAC
* TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.3.3 +lSVDC #1 Required 15.7 + 0.2 VDC As Found As Left +15VDC #2 Required l5o7 + 0.2 VDC As Found As Left 8.4 Verify the followi.ng Solid State Protection System General Warnings Lamps are Off o 8 0. 4 .1 General Warning Lamp -Train A 8.4.2 General Warning Lamp -Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF. General Warning Lamp -Train A 8.5.2 General Warning Lamp -Train B Initial 
* 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11 12 12 VAC VAC 8.1.5     Bus #1 TB--654 - 2 &   12             VAC 8.2     Open the front doors of Train B Logic Bay and Train B Output Relay Bay.
------------
: 8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1     +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
-----.x SALEM GENERATING STATION
* 8.3.2 As Found                As Left
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO.
                          +48VDC #2 Required 48.7 + 0.2 VDC As Found .             As Left
 
.x SALEM GENERATING STATION                 NUMBER -     lPD-18 .1. 009 REV. NO.    *l
* PERFORMANCE DEPARTMENT (I & C)                       ~~~~~~~-
DATE         5/24/82 TEST PROCEDURE                              PAGE ---..8__ OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                     Initial 8.3.3   +lSVDC #1 Required 15.7 + 0.2 VDC As Found           As Left
                        +15VDC #2 Required l5o7 + 0.2 VDC
* As Found           As Left 8.4 Verify the followi.ng Solid State Protection System General Warnings Lamps are Off o 8 4 .1
: 0.      General Warning Lamp - Train   A 8.4.2   General Warning Lamp - Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.
General Warning Lamp - Train A
* 8.5.2     General Warning Lamp - Train B
 
.x SALEM GENERATING STATION                 NUMBER -    lPD-18 .1. 009 REV.NO.    ~l~~~~~~-
* PERFORMANCE DEPARTMENT (I & C)
DATE      _5~/_2_4~/_8_2_______
TEST PROCEDURE                             PAGE              OF 50 9
TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                        Initial 8.6  On the Logic Test Panel, verify that each of the following indicators will light by depressing it.
8.6.1      Testing 8.6.2      Bad 8.6.3    . Good 8.6.4      Continuity 8.6.5      Memory Set 8.6.6      1/1 8.6.7      1/2 8.6.8      1/3 8.6.9      1/4 8.6.10      2/2
* 8.6.11 8.6.12 2/3 2/4
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV.NO.
DATE
DATE
______ _ PAGE 9 OF 50 ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.6 On the Logic Test Panel, following indicators will 8.6.1 Testing 8.6.2 Bad
                                                                                                              . lPD-18 .1. 009
* 8.6.3 . Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2 8.6.8 1/3 8.6.9 1/4 8.6.10 2/2
                                                                                                              ~l~~~~~~-
* 8.6.11 2/3 8.6.12 2/4 verify light that each of the by depressing it. Initial 
PAGE 5/24/82 10     OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
.. * ..
 
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -. lPD-18 .1. 009 REV.NO.
==8.0 Instructions==
DATE 5/24/82 PAGE 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.7 Record UV Coil Voltage Meter Reading. Required 43 VDC + 2 VDC Initial O , t''
(Continued)                                                                                 Initial 8.7 Record UV Coil Voltage Meter Reading.
L1<.-i \ "'-"" '.:, t: ..,_. l:"<ffi c. *1-.. \*;:i :H><.'-1G t..ic , :** 1.-.. L.. * / On the Relay Test Panel, place the Mode Selector 8.8 Switch in the Test position.
..              Required 43 VDC + 2 VDC
8.9 Verify the Operate Lamp is not lighted. 8.10 Verify the General Warning Lamp is 8.11 Verify the operation of the Semi-Automatic Tester. Self-check as follows: -NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS. 8.11.1 8.11.2 Verify that the continuity lamp is lighted . On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.
((w~:n, ~~hh~~~~~~( O\~~.&deg;.~:.~1 ~ ~.~~l~*:; <->.~.:~~*~:ni-\~--:.
x * *
                    \ "'-"" *~ ''~ '.:, t: ..,_. l:"<ffi c. *1-.. \*;:i :H><.'- 1G t..ic ~ , :** 1.-.. L.. *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.1.009 l 5/24/82 PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.11.4 8.11.7 Depress the test pushbutton.
                                                                                                                    ,t'' ~--~ L1<.- i  1~\
Verify that the continuity lamp and the top four LEDS on Al08 extinguish.
                                                                                                                                        /
Release the TEST pushbutton.
8.8  On the         Outpu~            Relay Test Panel, place the Mode Selector Switch in the Test position.
Verify that the continuity lamp and the top four LEDS on Al08 light. On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
8.9 Verify the Operate Lamp is not lighted.
Place the MULTIPLEXER TEST switch to the A & B position. Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.
8.10 Verify the General Warning Lamp is                                                   lighted~
8.11 Verify the operation of the Semi-Automatic Tester.
Self-check as follows:
                                                        -NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.
8.11.1                 Verify that the continuity lamp is lighted .
* 8.11.2                On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.
 
x SALEM GENERATING STATION                 NUMBER -     lPD-18.1.009 REV. NO.      l PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE   11   OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                   Initial 8.11~3    Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.
8.11.4    Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS
* on Al08 light.
On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
Place the MULTIPLEXER TEST switch to the A & B position.
                                              *~.
8.11.7    Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.
Depress and release the TEST pushbutton.
Depress and release the TEST pushbutton.
8.11.8.l Verify that the amber testing lamp lights. 8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.
8.11.8.l Verify that the amber testing lamp lights.
8.11.8.3 Verify that the GOOD lamp lights. Initial ----
8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.
x SALEM GENERATING STATION NUMBER-lPD-18.1.009
8.11.8.3 Verify that the GOOD lamp lights.
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. DATE 1 5/24/82 PAGE
 
__ OF 50 *
x SALEM GENERATING STATION                     NUMBER-     lPD-18.1.009 REV. NO. 1
* TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.11.8.4 In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods. 8.11.9 8.11.10 Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
* PERFORMANCE DEPARTMENT (I & C)
and release Test pushbutton.
DATE       5/24/82 TEST PROCEDURE                                PAGE .;;;1~2__ OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS. 8.11.10.2 Verify that the red BAD lamp lights. 8.11.11 Place the MULTIPLEXER TEST switch to INHIBIT *. 8.12 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Cont.rel Operator CLOSE Reactor Trip Breaker (B) 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF. 8.13.1 lR-llA Containment or Vent Particulate Initial x SALEM GENERATING STATION NUMBER -lPD-18 .1. 009
 
* PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. -=-1 ______ _ DATE PAGE 13 OF 50 * * ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.13.2 8.13.3 1R-12A Containment or Vent Gas Effluent.
==8.0 Instructions==
1R-12B Containment or Vent Gas Effluent (Iodine)
(Continued)                                       Initial 8.11.8.4   In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.
* 8.14 If any high RADIATION ALARM is present in Steps 8.13e1 through 8 .13. 3 lift the *field lead on terminal TB-506-2.
8.11.9     Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
8.15 Perform the following for LOGIC and PERMISSIVE testing. Record results on TABLE I. WARNING: If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and -remain on. It is then necessary to refer to Section 6.3 of the Solid State Protection System Manual to troubleshoot and define the cause. Verify the following switches are in *the positions indicated
8.11.10    ~epress  and release th~  Test pushbutton.
* 8.15.1.1 Logic A OFF 8.15.1.2 _Logic B 24 Initial 
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.
.x * *
8.11.10.2 Verify that the red BAD lamp lights.
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.1.009 1 5/24/82 PAGE ..;;;;l;..;;..4_
8.11.11   Place the MULTIPLEXER TEST switch to INHIBIT *.
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) . I 8.15.1.3 Logic C 24 8.15.1.4 Logic D 24 8.15.l.6 Memories OFF 8.15.2 8.15.3 8.15.5 Place Logic A switch to position "l" and verify that Function Logic! Lamp 2/3 lights. Depress and. release the TEST pushbutton.
8.12 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Cont.rel Operator CLOSE Reactor Trip Breaker (B)
The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and . the Green GOOD Lamp should 1 light. The I GOOD Lamp will extinguish  
* 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.
;*1he next tl.me the TEST pushbutton is dep;ressed  
8.13.1     lR-llA Containment or Vent Particulate
.. Place the Blocking Test Switch to the opposite position and Steps 8.15.2 and 8.15.3
 
* Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed. Initial SALEM GENE.ING ST A TION PERFORMANCE DEPARTMENT 0 & C) TEST PROCEOUHE
x SALEM GENERATING STATION                     NUMBER -     lPD-18 .1. 009 REV. NO.  -=-1_ _ _ _ _ __
* NUMBER_ lPD-18 .1. 009
* PERFORMANCE DEPARTMENT (I & C)
* REV.NO. l DATE 5/24/82 PAGE 15 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B FUNCTION SELECTORS LOGI C LOGIC LOGIC LOGIC MIS-A B C D SIVE OFF 24 24 24 OFF 1 24 24 24 OFF 2 24 24 24 OFF ' 3 24 24 24 OFF 4 24 24 24 OFF 5 24 24 24 OFF 6 24 24 24 OFF TABLE I LOGIC & PERMISSIVES TEST FUNCTION OFF LOSS OF FLOW, LOSS OF FLOW, LOSS OF FLOW, LOSS OF FLOW, LOOP LOOP LOOP LOOP LOSS OF FLOW, RCP 1 2 3 4 PRESSURIZER, LOW PRESSURE FUNCTION LOGIC REQUIRED ACTUAL 2/3 2/3 2/3 2/3 2/4 TRIP 2/4 BLOCKING FUNCTION.
DATE        ~5~/~2~4~/~8=2~~~-
TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED (GOOD OR BAD) 
TEST PROCEDURE 13        50 PAGE
,/\ SALEM GE.A TING ST A TION PEAFOAft.1ANCE DEPARTMENT (I & C) TEST PAOCEDUBE TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B c D SIVE 7 24 24 24 OFF 8 24 24 24 OFF 9 24 24 24 OFF 10 24 24 24 OFF 11 24 24 24 OFF 12 24 24 24 OFF
                                                                ---   OF TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
* NUMBER -lPD-18 .1. 009
 
* REV. NO. 1 DATE 5/24/82 PAGE 16 OF 50 ---SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH BLOCKS TEST INHIBIT NOT FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED .l PRESSURIZER, HIGH PRESSURE TRIP 2/4 PRESSURIZER, HIGH WATER LEVEL 2/3 TRIP LOW FEEDWATER FLOW, LOO:P 1 1/2 LOW FEEDWATER FLOW, LOOP 1 1/2 LOW FEEDWATER FLOW, LOOP 2 1/2 LOW FEEDWATER FLOW, LOOP 2 1/2 SALEM GE.A TING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B c D SIVE 13 24 24 24 OFF 14 24 24 24 OFF 15 24 24 24 OFF 16 24 24 24 OFF 17 24 24 24 OFF 18 24 24 24 .OFF 19. 24 24 24 OFF
==8.0 Instructions==
* NUMBER -lPD-18 .1. 009
(Continued)                                         Initial 8.13.2     1R-12A Containment or Vent Gas Effluent.
* REV. NO. 1 DATE 5/24/82 PAGE 17 OF 50 SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH BLOCKS TEST INHIBIT NOT . ; FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED LOW FEEDWATER FLOW, LOOP 3 1/2 LOW FEEDWATER FLOW, LOOP 3 1/2 LOW FEEDWATER FLOW, LOOP 4 1/2 LOW FEEDWATER FLOW, LOOP 4 1/2 OIL PRESSURE SWITCHES REACTOR 2/3 TRIP STOP VALVES GENERATOR TRIP 2/2 STOP VALVES GENERATOR TRIP 2/2 SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE
8.13.3    1R-12B Containment or Vent Gas Effluent (Iodine)
.. '**
* 8.14 If any high RADIATION ALARM is present in
..
* Steps 8.13e1 through 8 .13. 3 lift the *field lead on terminal TB-506-2.
* NUMBER -REV. NO. DATE lPP-18 .1. 009 1 .* 5/24/82 PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B LOGIC A 20 21 22 23 23 23 23 TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS.
8.15 Perform the following for LOGIC and PERMISSIVE testing. Record results on TABLE I.
LOGIC LOGIC B C 24 24 24 24 24 24 24 24 1 *24 2 24 3 24 LOGIC 'MIS-TEST FUNCTION . D SIVE 24 OFF STOP VALVES REACTOR TRIP 24 OFF SOURCE RANGE TR+P 24 OFF SOURCE RANGE TRIP 24 OFF FEED THRU TO LOGIC B 24 OFF INTERMEDIATE RANGE TRIP 24 OFF INTERMEDIATE RANGE TRIP 24 OFF POWER RANGE, LOW SETPOINT TRIP FUNCTION LOGIC REQUIRED ACTUAL 2/2 2/2 2/2 2/2 2/2 2/4 ** BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED 
WARNING:   If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and
... SALEM G.ATING ST A TION
                          -remain on. It is then necessary to refer to Section 6.3 of the Solid State Protection System Manual to troubleshoot and define the cause.
* NUMBER -lPD-18.1.009 PERFORMANCE DEPARTMENT (I & C) TEST PAOCEDUHE REV. NO. 1 DATE TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B FUNCTION SELECTORS LOGIC LOGIC LOGIC LOGIC MIS-A B C D SIVE TABLE I LOGIC & PERMISSIVES TEST. FUNCTION 5/24/82 PAGE 19 OF FUNCTION LOGIC REQUIRED ACTUAL 23 4 24 24 OFF' POWER RANGE, HIGH SETPOINT TRIP 2/4 23 5 24 23 6 24 23 7 24 23 8 24 23 9 24 24 .OFF OVERTEMPERATURE DELTA T TRIP 24 OFF OVERPOWER DELTA T TRIP 24 OFF RCP UNDERVOLTAGE TRIP 24 OFF RCP UNDERVOLTAGE TRIP 24 OFF RCP UNDERVOLTAGE, TURB. FEED PUMP 2/4 2/4 2/4 1/2 1/2 50
Verify the following switches are in *the positions indicated *
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED SALEM GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUBE
* 8.15.1.1   Logic A 8.15.1.2 _Logic B OFF 24
** NUMBER_ lPD-18 .1. 009 REV. NO. 1 . DATE 5/24/82 PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST. A B c b SIVE FUNCTION REQUIRED ACTUAL 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 *24 24 OFF HIGH STEAMLINE FLOW, LOOP 4 1/2
 
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED I\ SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDU'HE
.x SALEM GENERATING STATION                  NUMBER -        lPD-18.1.009
* NUMBER -lPD-18 .1. 009 REV. NO. 1 DATE 5/24/82 PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC . PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A B c D SIVE FUNCTION REQUIRED ACTUAL 23 16 24 OFF STEAMLINE ISOLATION 2/4 17 24 24 OFF HIGH .CONTAINMENT PRESSURE, 2/3 SAFETY INJECTION 23 18 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4. SPRAY ACTUATION 23 19 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 20 24 24 OFF HI-HI CONTAI'NMENT PRESSURE, 2/4 STEAM STOP VALVES
* PERFORMANCE DEPARTMENT (I & C)
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PAOCEDUHE
TEST PROCEDURE REV. NO.
* NUMBER -lPD-18 .1. 009 REV. NO. 1 DATE 5/24/82 PAGE 22 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC .& PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A B c D SIVE FUNCTION REQUIRED ACTUAL 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 23 24 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRO TO LOGIC C 23 24 l 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 1 ** ; ! BLOCKING FUNCTION TEST SWITCH BLOCKS . INHIBIT NOT ; BLOCKS INHIBITED i
DATE 1
I\ SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE TITLE SOLID STATE PROTECT.ION FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-:-A B c D SIVE 23 24 2 24 OFF 23 24 3 24 OFF 23 24 4 24 OFF 23 24 5 24 OFF 23 24. 6 24 OFF 23 24 7 24 OFF
5/24/82 PAGE ..;;;;l;..;;..4_ OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
* NUMBER -lPD-18 .1. 009
 
* REV. NO. 1 DATE 5/24/82 PAGE 23 OF 50 ---SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH BLOCKS TEST INHIBIT NOT FUNCTION REQUIRED ACTUAL BLOCKS .INHIBITED STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 PRESSURIZER PRESSURE 2/3 PRESSURIZER PRESSURE 2/3 PRESSURIZER PRESSURE 2/3 SALEM GE.ATING STATION
==8.0 Instructions==
* PERFORMANCE DEPARTMENT (I & Cl TEST PAOCEDUHE
(Continued)                                                 Initial 8.15.1.3   Logic C       24 8.15.1.4   Logic D       24
** REV. NO. lPD-18.1.009 1 DATE TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS LOGI C LOGIC LOGIC LOGIC TEST FUNCTION A B C D S.IVE 23 24 8 24 23 24 .9 24 23 24 10 24 23 24 11 24 23 24 i2 24 OFF STEAM GENERATOR LO-LO WATER .LEVEL LOOP 1 OFF STEAM GENERATOR LO-LO WATER LEVEL LOOP. 2 OFF STEAM GENERATOR LO-LO WATER LEVEL LOOP 3 . . *:*_ .. , OFF STEAM GENERATOR LO-LO WATER LEVEL LOOP 4 OFF STEAM GENERATOR LO-LO WATER LEVEL TRIP 5/24/82 PAGE 24 OF 50 FUNCTION LOGIC REQUIRED ACTUAL 2/3 2/3 2/3 2/3 1/4
* 8.15.l.6 8.15.2 Memories      OFF Place Logic A switch to position "l" and verify that Function Logic! Lamp 2/3 lights.
* BLOCKING FUNCTION TEST SWITCH . . BLOCKS INHIBIT NOT BLOCKS INHIBITED   
8.15.3    Depress and. release the TEST pushbutton.
The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and
                                                      .   ~
  . I the Green GOOD Lamp should 1light. The I
GOOD Lamp will extinguish ;*1he next tl.me the TEST pushbutton is dep;ressed ..
Place the Blocking Functi~n Test Switch to the opposite position and r~peat Steps 8.15.2 and 8.15.3 *
* 8.15.5    Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.
 
SALEM GENE.ING ST ATION PERFORMANCE DEPARTMENT TEST PROCEOUHE 0& C)
* NUMBER_
REV.NO.
DATE lPD-18 .1. 009 l
                                                                            ~~~~------~
5/24/82 PAGE 15   OF 50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                           FUNCTION LOGIC          BLOCKING FUNCTION.
TEST SWITCH PER-                                                                    BLOCKS LOGI C   LOGIC   LOGIC LOGIC   MIS-       TEST                                              INHIBIT      NOT A         B     C     D     SIVE     FUNCTION                  REQUIRED    ACTUAL      BLOCKS INHIBITED OFF     24     24     24     OFF  OFF                                                       (GOOD OR BAD) 1     24     24     24     OFF LOSS OF FLOW, LOOP 1              2/3 2    24     24     24     OFF LOSS OF FLOW, LOOP 2              2/3 3     24     24     24   OFF LOSS OF FLOW, LOOP 3              2/3 4     24     24     24   OFF LOSS OF FLOW, LOOP 4              2/3 5     24     24     24   OFF LOSS OF FLOW, RCP                 2/4 6    24      24      24    OFF  PRESSURIZER, LOW PRESSURE TRIP    2/4
 
,/\
SALEM GE.A TING ST A TION NUMBER -    lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C)                                 REV. NO. 1 TEST PAOCEDUBE                                             DATE        5/24/82 50 PAGE
                                                                                    - OF TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS LOGIC   LOGIC   LOGIC LOGIC   MIS-       TEST                                            INHIBIT      NOT A         B     c       D     SIVE     FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED  .l 7     24     24     24     OFF PRESSURIZER, HIGH PRESSURE TRIP    2/4 8     24     24     24     OFF PRESSURIZER, HIGH WATER LEVEL      2/3 TRIP 9     24     24       24   OFF LOW FEEDWATER FLOW, LOO:P 1        1/2 10     24     24       24   OFF LOW FEEDWATER FLOW, LOOP 1          1/2 11     24     24       24   OFF LOW FEEDWATER FLOW, LOOP 2          1/2 12    24     24      24    OFF LOW FEEDWATER FLOW, LOOP 2          1/2
 
SALEM GE.A TING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
5/24/82 DATE PAGE 17    OF   50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC    LOGIC  LOGIC  LOGIC  MIS-        TEST                                           INHIBIT     NOT . ;
A        B      c      D    SIVE      FUNCTION                  REQUIRED   ACTUAL     BLOCKS INHIBITED 13      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 14      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 15      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 16      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 17      24      24      24    OFF  OIL PRESSURE SWITCHES REACTOR    2/3 TRIP 18      24     24     24   .OFF STOP VALVES GENERATOR TRIP        2/2
: 19. 24     24     24   OFF STOP VALVES GENERATOR TRIP        2/2
 
SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE
                                        *~'; .
* NUMBER -
REV. NO.
lPP-18 .1. 009 1 .*
5/24/82 DATE PAGE     18  OF   50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS.                                              FUNCTION LOGIC           BLOCKING FUNCTION TEST SWITCH PER-                                                                        BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  'MIS-          TEST                                              INHIBIT      NOT A        B      C    .D    SIVE        FUNCTION                   REQUIRED       ACTUAL   BLOCKS INHIBITED 20      24      24    24    OFF    STOP VALVES REACTOR TRIP            2/2 21      24      24    24    OFF    SOURCE RANGE TR+P                  2/2 22      24      24      24    OFF    SOURCE RANGE TRIP                  2/2 23      24      24      24    OFF    FEED THRU TO LOGIC B 23      1    *24      24    OFF    INTERMEDIATE RANGE TRIP            2/2 23      2     24      24    OFF    INTERMEDIATE RANGE TRIP           2/2 23      3      24      24    OFF    POWER RANGE, LOW SETPOINT TRIP    2/4
 
SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)
* NUMBER -
REV. NO.
lPD-18.1.009 1
TEST PAOCEDUHE                                            DATE          5/24/82 PAGE   19    OF 50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH
                                *PER-                                                                      BLOCKS LOGIC   LOGIC   LOGIC  LOGIC  MIS-         TEST.                                             INHIBIT      NOT A        B      C      D     SIVE     FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      4      24     24     OFF' POWER RANGE, HIGH SETPOINT TRIP     2/4 23      5      24     24   .OFF OVERTEMPERATURE DELTA T TRIP         2/4 23      6      24     24   OFF OVERPOWER DELTA T TRIP               2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP                2/4 23      8      24      24    OFF  RCP UNDERVOLTAGE TRIP              1/2 23      9      24      24    OFF  RCP UNDERVOLTAGE, TURB. FEED        1/2 PUMP
 
SALEM GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUBE
                                                      **        NUMBER_
REV. NO.
lPD-18 .1. 009 1 .
5/24/82 DATE PAGE  20    OF 50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC   LOGIC LOGIC MIS-       TEST.                                            INHIBIT      NOT A       B       c    b    SIVE     FUNCTION                   REQUIRED    ACTUAL    BLOCKS INHIBITED 23     10      24     24   OFF RCP UNDERVOLTAGE, TURB. FEED        2/4 PUMP 23     11        24   24   OFF  LOW STEAMLINE PRESSURE              2/4 23     12      24     24   OFF HIGH STEAMLINE FLOW, LOOP 1        1/2 23      13      24     24   OFF HIGH STEAMLINE FLOW, LOOP 2         1/2 23      14      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 3        1/2 23      15      *24    24  OFF  HIGH STEAMLINE FLOW, LOOP 4        1/2
 
I\
SALEM G.ATING STATION                                            NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                               1 REV. NO.
TEST PROCEDU'HE                                                        5/24/82 DATE PAGE 21    OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC .      BLOCKING FUNCTION TEST SWITCH PER-                                                                     BLOCKS LOGIC   LOGIC   LOGIC LOGIC MIS-         TEST                                             INHIBIT      NOT A       B       c     D    SIVE       FUNCTION                   REQUIRED   ACTUAL     BLOCKS INHIBITED 23     16      ~4    24   OFF STEAMLINE ISOLATION                2/4
      ~3    17      24     24   OFF HIGH .CONTAINMENT PRESSURE,        2/3 SAFETY INJECTION 23     18      24     24   OFF HI-HI CONTAINMENT PRESSURE,         2/4.
SPRAY ACTUATION 23     19      24     24   OFF HI-HI CONTAINMENT PRESSURE,        2/4 SPRAY ACTUATION 23     20      24     24   OFF HI-HI CONTAI'NMENT PRESSURE,       2/4 STEAM STOP VALVES
 
SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PAOCEDUHE
* NUMBER -
REV. NO.
DATE lPD-18 .1. 009 1
5/24/82 PAGE 22    OF   50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC .& PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH LOGIC   LOGIC   LOGIC LOGIC PER-MIS-       TEST                                             INHIBIT BLOCKS NOT A       B       c     D   SIVE     FUNCTION                     REQUIRED   ACTUAL     BLOCKS INHIBITED  i 23     21      24    24   OFF HI-HI CONTAINMENT PRESSURE,          2/4 PHASE B ISOLATION 23    22      24     24   OFF SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    23       24     24   OFF SAFETY INJECTION, CONTAINMENT       1/2 VENTILATION ISOLATION 23     24      24     24   OFF FEED THRO TO LOGIC C 23     24       l    24   OFF STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 1
 
I\
SALEM G.ATING ST A TION                                            NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.     1 TEST PROCEDUHE                                              DATE         5/24/82 PAGE   23    OF 50 TITLE         SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                               FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                       BLOCKS LOGIC   LOGIC   LOGIC LOGIC MIS-:-        TEST                                             INHIBIT      NOT A       B       c     D   SIVE       FUNCTION                   REQUIRED     ACTUAL   BLOCKS .INHIBITED 23     24       2    24   OFF   STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 2 23     24       3    24   OFF   STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 3 23     24       4    24   OFF   STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 4 23     24       5    24   OFF     PRESSURIZER PRESSURE              2/3 23     24.      6    24   OFF     PRESSURIZER PRESSURE              2/3 23      24      7    24    OFF      PRESSURIZER PRESSURE             2/3
 
SALEM GE.ATING STATION
* PERFORMANCE DEPARTMENT (I & Cl TEST PAOCEDUHE
                                                                    **      NUMBER:-
REV. NO.
lPD-18.1.009 1
DATE        5/24/82 PAGE  24   OF  50 TITLE          SOI.ID STATE  PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                      FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH    .
PER-                                                                         . BLOCKS LOGI C  LOGIC    LOGIC  LOGIC  MIS~                TEST                                            INHIBIT      NOT A        B        C      D    S.IVE            FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24        8      24   OFF  STEAM GENERATOR LO-LO WATER                2/3
                                                .LEVEL LOOP 1 23     24      .9      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP. 2 23      24      10      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 3
                                              ~ ..
23      24      11      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 4 23      24      i2      24    OFF  STEAM GENERATOR LO-LO WATER                1/4 LEVEL TRIP
 
                                              \, -
S~LEM G a ATING ST ATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE
* NUMBER-REV. NO.
lPD-18.1.009 1
5/24/82 DATE PAGE    25        50
                                                                                --- OF ---
TITLE          SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC   LOGIC LOGIC MIS-        TEST                                             INHIBIT      NOT A       B       c      b    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23     24     13    24   OFF STEAM GENERATOR LO-LO WATER         1/4 LEVEL, MOTOR FEED PUMP 23      24      14    24    OFF .STEAM GENERATOR *LO-LO WATER         2/4 LEVEL, TURBINE FEED PUMP 23      24      15    24    OFF STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 1 23 . 24      16    24    OFF STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 2 23      24      17    24    OFF STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 3
 
SALEM GU*
* TING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PAOCEDUHE
* NUMBEA-AEV. NO.
lPD-18.1.009 1
DATE        5/24/82 PAGE              50
                                                                                -2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOG IC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B        C      D    SIVE      FUNCTION                  REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      18    24    OFF STEAM GENERATOR HI-HI LEVEL,      2/3 GENERATOR 4 23      24      19    24    OFF  LOW TAVG                          2/4 23      24      20    24    OFF  TAVG AND REACTOR TRIPPED          2/2 23      24      21    24    OFF  UV DIODES AND OUTPUT              1/4 23      24      22    24    OFF  SAFETY INJECTION DIODES & OUTPUT 1/4 23      24      23    24    OFF  UV DIODES AND OUTPUT              1/4
 
SALEM GE.ATINGSTATION PERFORMANCE DEPARTMENT TEST PAOCEDUHE 11 & C)
* NUMBER -
REV. NO.
lPD-18.1.009 1
DATE          5/24/82 PAGE  27  OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC  LOGIC    LOGIC  LOGIC    MIS-        TEST                                            INHIBIT      NOT A        B      c        D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    _* 24    OFF  FEED THRU TO LOGIC D 23      24      24        1    OFF  SAFETY INJECTION DIODES & OUTPUT 1/3 23      24      24        2    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        3    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        4    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        5    OFF  UV DIODES AND OUTPUT                1/4 23    24      24        6    OFF  UV DIODES AND OUTPUT                1/4
 
SALEM  GEa    TING STATION PERFORUANCE DEPARTMENT (I & C)
TEST PAOCEDUHE
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
DATE          5/27/82 PAGE  28  OF    50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC  *& PERMISSIVES FUNCTION SELECTORS                                                  FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC . LOGIC    LOGIC  LOGIC    MIS-        TEST                                              INHIBI'I'    NOT A        B        c      D      SIVE      FUNCTION                      REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24      7      OFF  FEEDWATER CONTROL                    1/2 23      24      24      8      OFF  FEEDWATER CONTROL                    1/1 23      24      24      9      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    10      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    11      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    12      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    13      OFF  POWER RANGE, HI FLUX RATE TRIP        2/4
 
SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE.
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
DATE          5/24/82 PAGE  29    OF  50
"'IT(U:        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    14    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    15    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    16    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    17    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24. 24    18    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    19    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION
 
SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PAOCEDUHE
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
DATE          5/24/82 PAGE  30    OF  50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
                                                    . TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEpT                                              INHIBIT      NOT A      B        c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23    24      24    20    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    21
                                - OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    22    OFF  SAFETY INJECTION, PHASE A*          1/1 ISOLATION 23    24      24    23    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    24    OFF  FEED THRU TO PERMISSIVES 23    24      24    24      1  P6                                  1/2
 
SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
TEST PROCEDUHE                                                DATE          5/24/82-31        50
                                          .*4'.:
PAGE
                                                                                        --- OF ---
TITLE          SOLID STATE PROTECTION.SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS
* FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                          BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-            TEST                                              INHIBIT      NOT A        B      c      D    SIVE          FUNCTION                    REQUIRED_ ACTUAL        BLOCKS INHIBITED 2_3      24      24    24      2  P8                                      2/4 23      24      24    24      3  PlO                                    2/4 23      24      24    24      4  P7                                    1/3 23      24      24    24      5  pg                                    2/4 !
23      24      24    24      6  P12 23      24      24    24      7  P12                                    2/4 23      24      24    24      8  P12                                    2/4
 
J\
SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)
* NUMBER -
REV. NO. 1 lPD-18.1.009 TEST PROCEDUHE                                            DATE          5/24/82 PAGE    32    OF  50
  'TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      I)    SIVE      FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      24    24      9  Pll                                2/3  I I
23      24      24    24      10  P8 RCP BREAKERS                    1/4 23      24      24    24      11  P8 RCP BREAKERS                    1/4 OFF    24      24    24    OFF  OFF                                OFF
 
*X SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)              REV.NO. _l~~~~~~
DATE      _5/,__24~/~8_2~~~~
TEST PROCEDURE                                PAGE _3_3__ OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                        Initial 8.16 Perform the following Memories Testing._
Record results on TABLE II.
8.16.l    Place MEMORIES switch to position "l".
(The 1/4 function logic lamp will light
* 8.16.2 whenever the MEMORIES switch is not in the OFF position) ..
In the MEMORY FUNCTION TEST portion of the LOGIC TEST PANEL, depress and. release the RED pushbutton and verify that the MEMORY SET lamp lights.    (If already on, depress and release BLACK pushbutton).
8.16.3    After MEMORY SET lamp lights, depress and release BLACK pushbutton.
8.16.4    Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .
I & C - 001


GaA TING ST A TION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE
SALEM GENERATING STATION                  NUMBER -     lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
\, -* NUMBER-lPD-18.1.009
DATE         5/24/82 TEST PROCEDURE                              PAGE _3_4__ OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION                                            FUNCTION       MEMORY      FUNCTION SELECTOR                                              LOGIC         TEST     PUSHBUTTON MEMORIES                  TEST FUNCTION               1/4          RED        BLACK OFF         OFF                                                   (ON OR OFF) 1       POWER RANGE BLOCK
* REV. NO. 1 DATE 5/24/82 PAGE 25 OF 50 ------TITLE SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B c b SIVE 23 24 13 24 OFF 23 24 14 24 OFF 23 24 15 24 OFF 23 . 24 16 24 OFF 23 24 17 24 OFF TABLE I LOGIC & PERMISSIVES TEST FUNCTION STEAM GENERATOR LO-LO WATER LEVEL, MOTOR FEED PUMP .STEAM GENERATOR
* 2 3
*LO-LO WATER LEVEL, TURBINE FEED PUMP STEAM GENERATOR HI-HI LEVEL, GENERATOR 1 STEAM GENERATOR HI-HI LEVEL, GENERATOR 2 STEAM GENERATOR HI-HI LEVEL, GENERATOR 3 FUNCTION LOGIC REQUIRED ACTUAL 1/4 2/4 2/3 2/3 2/3 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED SALEM GU ** TING STATION PERFORMANCE DEPARTMENT (I & C) TEST PAOCEDUHE
INTERMEDIATE RANGE BLOCK SOURCE RANGE BLOCK 4       SOURCE RANGE BLOCK 5       SAFETY INJECTION BLOCK, PRESSURIZER 6        SAFETY INJECTION BLOCK, PRESSURIZER 7        SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LEVEL ,
* AEV. NO. lPD-18.1.009 1 DATE TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS LOG IC LOGIC LOGIC LOGIC MIS-TEST FUNCTION A B C D SIVE 23 24 18 23 24 19 23 24 20 23 24 21 24 24 24 24 OFF STEAM GENERATOR HI-HI LEVEL, GENERATOR 4 OFF LOW TAVG OFF TAVG AND REACTOR TRIPPED OFF UV DIODES AND OUTPUT 5/24/82 PAGE 2(? OF 50 ---FUNCTION LOGIC REQUIRED ACTUAL 2/3 2/4 2/2 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPUT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4
8        SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LOGIC 9       AUTOMATIC SAFETY INJECTION BLOCK 10         FEEDWATER VALVE CONTROL
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED A SALEM GE.ATINGSTATION
**11             FEEDWATER VALVE CONTROL OFF         OFF I & C - 001
* NUMBER -lPD-18.1.009
* PERFORMANCE DEPARTMENT 11 & C) REV. NO. 1 TEST PAOCEDUHE DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER-BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 _* 24 OFF FEED THRU TO LOGIC D 23 24 24 1 OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2 OFF UV DIODES AND OUTPUT 1/4 23 24 24 3 OFF UV DIODES AND OUTPUT 1/4 23 24 24 4 OFF UV DIODES AND OUTPUT 1/4 23 24 24 5 OFF UV DIODES AND OUTPUT 1/4 23 24 24 6 OFF UV DIODES AND OUTPUT 1/4 SALEM GEa TING STATION PERFORUANCE DEPARTMENT (I & C) TEST PAOCEDUHE TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-LOGIC . LOGIC LOGIC LOGIC MIS-A B c D SIVE 23 24 24 7 OFF 23 24 24 8 OFF 23 24 24 9 OFF 23 24 24 10 OFF 23 24 24 11 OFF 23 24 24 12 OFF 23 24 24 13 OFF ..
* NUMBER -lPD-18 .1. 009
* REV. NO. 1 DATE 5/27/82 PAGE 28 OF 50 SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC *& PERMISSIVES FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH BLOCKS TEST INHIBI'I' NOT FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED FEEDWATER CONTROL 1/2 FEEDWATER CONTROL 1/1 RCP UNDERFREQUENCY 2/4 RCP UNDERFREQUENCY 1/2 RCP UNDERFREQUENCY 1/2 RCP UNDERFREQUENCY 2/4 POWER RANGE, HI FLUX RATE TRIP 2/4 


GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE.
    .~
* NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 PAGE 29 OF 50 "'IT(U: SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B FUNCTION SELECTORS LOGIC LOGIC LOGIC LOGIC A B c D 23 24 24 14 23 24 24 15 23 24 24 16 23 24 24 17 23 24. 24 18 23 24 24 19
SALEM GENERATING STATION                                                                                         NUMBER -                     lPD-18 .1. 009 REV.NO.                   _l_ _ _ _ _ __
* TABLE I LOGIC & PERMISSIVES PER-MIS-TEST SIVE FUNCTION OFF SAFETY INJECTION, PHASE A ISOLATION OFF SAFETY INJECTION, PHASE A ISOLATION OFF SAFETY INJECTION, PHASE A ISOLATION OFF SAFETY INJECTION, PHASE A ISOLATION OFF SAFETY INJECTION, PHASE A ISOLATION OFF SAFETY INJECTION, PHASE A ISOLATION FUNCTION LOGIC REQUIRED ACTUAL 1/1 1/1 1/1 1/1 1/1 1/1
PERFORMANCE DEPARTMENT&deg; (I & C)
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C) TEST PAOCEDUHE TITLE SOI.ID STATE PROTECTION FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B c D SIVE 23 24 24 20 OFF -23 24 24 21 OFF 23 24 24 22 OFF 23 24 24 23 OFF 23 24 24 24 OFF 23 24 24 24 1
DATE                         5/24/82
* NUMBER -lPD-18 .1. 009 REV. NO. DATE 1 5/24/82 PAGE 30 OF 50 SYSTEM FUNCTIONAL TEST TRAIN B . TABLE I LOGIC & PERMISSIVES FUNCTION LOGIC TEpT FUNCTION REQUIRED ACTUAL SAFETY INJECTION, PHASE A 1/1 ISOLATION SAFETY INJECTION, PHASE A 1/1 ISOLATION SAFETY INJECTION, PHASE A* 1/1 ISOLATION SAFETY INJECTION, PHASE A 1/1 ISOLATION FEED THRU TO PERMISSIVES P6 1/2
                                                                                                                                                              -----'----~---
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED
TEST PROCEDURE 35                50 PAGE
: "' : SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)' TEST PROCEDUHE
                                                                                                                                                                      ---           OF TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
.. !:* .*4'.: -------
* NUMBER -REV. NO. DATE PAGE lPD-18 .1. 009 ** 1 5/24/82-31 OF 50 ------TITLE SOLID STATE PROTECTION.SYSTEM FUNCTIONAL TEST TRAIN B FUNCTION SELECTORS
* LOGIC LOGIC LOGIC LOGIC A B c D 2_3 24 24 24 23 24 24 24 23 24 24 24 23 24 24 24 23 24 24 24 23 24 24 24 23 24 24 24 LOGIC PER-MIS-TEST SIVE FUNCTION 2 P8 3 PlO 4 P7 5 pg 6 P12 7 P12 8 P12 TABLE I & PERMISSIVES FUNCTION LOGIC REQUIRED_
ACTUAL 2/4 2/4 1/3 2/4 ! 2/4 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED J\ SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C) TEST PROCEDUHE
* 'TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B c I) SIVE 23 24 24 24 9 23 24 24 24 10 23 24 24 24 11 OFF 24 24 24 OFF
* NUMBER -REV. NO. DATE PAGE lPD-18.1.009 1 5/24/82 32 OF 50 SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES TEST FUNCTION Pll P8 RCP BREAKERS P8 RCP BREAKERS OFF FUNCTION LOGIC REQUIRED ACTUAL 2/3 I I 1/4 1/4 OFF
* BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED 
*X * *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO.
DATE PAGE _3_3 __ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.16 Perform the following Memories Testing._
Record results on TABLE II. 8.16.l 8.16.2 8.16.3 8.16.4 Place MEMORIES switch to position "l". (The 1/4 function logic lamp will light whenever the MEMORIES switch is not in the OFF position)
.. In the MEMORY FUNCTION TEST portion of the LOGIC TEST PANEL, depress and. release the RED pushbutton and verify that the MEMORY SET lamp lights. (If already on, depress and release BLACK pushbutton).
After MEMORY SET lamp lights, depress and release BLACK pushbutton.
Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II . I & C -001 Initial
* NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE PAGE _3_4 __ OF 50 TITLE FUNCTION SELECTOR MEMORIES OFF 1
* 2 3 4 5 6 7 8 9 10 **11 OFF I & C -001 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TEST FUNCTION OFF POWER RANGE BLOCK TABLE 2 MEMORIES INTERMEDIATE RANGE BLOCK SOURCE RANGE BLOCK SOURCE RANGE BLOCK SAFETY INJECTION BLOCK, PRESSURIZER SAFETY INJECTION BLOCK, PRESSURIZER SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LEVEL , SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LOGIC AUTOMATIC SAFETY INJECTION BLOCK FEEDWATER VALVE CONTROL FEEDWATER VALVE CONTROL OFF FUNCTION LOGIC 1/4 MEMORY TEST RED FUNCTION PUSHBUTTON BLACK (ON OR OFF) 
* ".i. 1 a. r _ nn1 SALEM GENERATING STATION PERFORMANCE DEPARTMENT&deg; (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO. _l ______ _ DATE 5/24/82 PAGE 35 OF 50 ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued)
Initial 8.17 Perform the following for Output Relay Testing and Record'results on TABLE III. 8.17.1 8.17.2 8.17.3 8.17.4 c..* -('. \ \. Place the MASTER RELAY SELECTOR in Position "l". Depress SLAVE TEST A pushbutton and verify that the required "A" lamps lights while pushbutton is depressed.
Verify the required lamps light by placing an "X" under each on*requirement.
Repeat Step 8.17.2 for SLAVE TEST B. Repeat Steps 8.17.2 and 8.17.3 for each MASTER RELAY SELECTOR position listed on TABLE III. -. (I H . " 'II . \-z:..:. ..........
-1...*.i '--,. . ... \::""l...
** .... <" i ... \ -...... "'\_.,. \.... \.:>f'; ,..; ;...\... *
\,:''\
<!..
c
\ &#xa5;..i.vc i_ .,
\I... "-.:*<.*l\ \<... . \.;.. \..:: '.C
\ -., .. ,, '.'\ "A .;* \-(-'1-*" ..:. \ ... _
* S:\v: ..... * \t. 1<:C 'C. \ .. ---
SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDUHE
* NUMBER -lPD-18 .1. 009
* REV. NO. 1 DATE 5/24/82 PAGE 36 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B MASTER RELAY SELECTOR 1 2 3 4 5 6 7 TABLE III LOGIC & PERMISSIVES SLAVE RELAY FUNCTION CONTAINMENT ISOLATION, PHASE A CONTAINMENT VENTILATION ISOLATION STEAM STOP VALVES SPRAY ACTUATION CONTAINMENT ISOLATION, PHASE B FEEDWATER VALVES (HI-HI STEAM GENERATOR LEVEL) TRIP TURBINE/MAIN FEEDWATER PUMPS Al ON ON ON ON ON ON ON A2 ON OFF OFF OFF ON OFF OFF SLAVE RELAY CONTINUITY LAMPS A3 A4 Bl B2 B3 B4 ON OFF ON ON ON OFF OFF OFF ON *oFF OFF OFF OFF OFF ON O;F'F OFF OFF OFF OFF ON ON OFF OFF OFF OFF ON ON OFF OFF OFF OFF OFF pFF OFF OFF OFF OFF OFF OFF OFF OFF SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C) TEST PROCEDUHE
* NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 PAGE 37 OF 50
* TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B MASTER RELAY SELECTOR 8 9 10 11 12 13 14 15 TABLE III LOGIC & PERMISSIVES SLAVE RELAY FUNCTION Al A2 RCP UNDERFREQUENCY ON OFF SPARE ON OFF (NOT USED) OFF OFF (NOT USED) OFF OFF LO-LO TAVG STEAM DUMP INTERLOCK ON OFF LOSS OF POWER/TURBINE AUXILIARY PUMP ON OFF LOW WATER LEVEL/MOTOR AUXILIARY PUMP ON OFF LOW WATER LEVEL/TURBINE AUXILIARY PUMP ON OFF SLAVE RELAY CONTINUITY LAMPS A3 A4 Bl B2 B3 B4 OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF. OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF 
,/\ SALEM GE.A TING STATION
* NUMBER -lPD-18 .1. 009
* PERF0Rf..1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUUE DATE 5/24/82 PAGE 38 OF 50 TITLE SOI, ID STATE PROTECTION SYSTEM TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4. Bl B2 B3 B4 16 GENERATOR TRIP & .STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 17 TAVG AND REACTOR TRIPPED ON OFP OFF OFF ON OFF OFF OFF 18 SAFETY INJECTION . ON ON ON ON ON ON ON ON 19 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 20 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 21 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 22 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 23 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 PAGE 39 OF SO TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL T.EST TRAIN B 8.0 Instructions: (Continued) 8.18 Place the MULTIPLEXER TEST switch to Normal. 8.19 Replace (if required) the field lead to TB-506-2 lifted Step 8.14. 8.20 Inform the Control Operator that a containment ventilation isolation will be initiated if a high radiation alarm is present when this procedure is completed.
Inform him that -he may reset the containment ventilation isolation at this time. 8.21 Manual Input Function Test -NOTE-8.ai.\.&deg;t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped 8.21.1 Tripped Operational Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated . I & C
* 001 Initial 
** *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lP D-18 . 1. 0 0 9 5/24/82 PAGE 40 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued)
*-WARNING-Reactor By-pass Breaker B must remain energized for the duration of the manual testing, otherwise a Reactor Trip will occur
* 8.21.2 8.21.3 8. 21. 4 8. 21. 5 8.21.6 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7. (Pressurizer High Pressure Trip). In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.
At the Control Board, verify that Reactor Trip B is OPEN. Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC. Release the pushbuttons depressed in Step 8.21.3 . I & C -001 Initial 
'x * **
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV. NO. -*--=l=--------
DATE 5/24/82 PAGE 41 OF 50 TITLE . SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued)
: 8. 21. 7 8. 21. 8 8.21.9 8.21.10 8.21.11 Place the LOGIC A Test Switch in the OFF position.
Have the Control Opeator close the Reactor Trip Breaker B . Have the Control Operator OPEN Reactor By-Pass Breaker B. Have the Control Operator rack Out Reactor By-Pass Breaker B. Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B . I I & C
* 001 Initial 
. )< * *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO. _l ______ DATE 5/24/82 PAGE 42 OF 50 ---SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST. 8.22.1 8.22.2 8.22.3 Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated, depress the BLACK button to extinguish it . In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK position.
Connect the Digital Voltmeter as follows: 8.22.3Al
* TD-1, Terminal 6 (+) 8.22.3.2 Logic Ground (GND) 8.-22.4 8.22.5 8.22.6 The DVM should read approximately
+48 VDC. Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2. The DVM should indicate 0 VDC. I & C -001 Initial 
.x * * ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO. _l ______ _ DATE 5/24/82 PAGE 43 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.22.7 8.22.8 Latch-up Relay K602 by depressing the latch plunger and time the interval from this point until the voltmeter reads approximately
*+48 VDC. (The time should be 60 to 65 sec.) sec. -----At the Control Board depress the S.I. Block/Reset pushbutton and verify the following:
8.22.8.1 DVM indicates 0 VDC 8.22.8.2 MEMORY SET lamp lights 8.22.8.3 Relay K602 Resets 8.22.9 8.22.10 Return the MEMORIES switch to the OFF position.
Connect the Digital Voltmeter as follows: 8.22.10.l TD-1, Terminal 6 (+) -8.22.10.2 IDgic Ground (GND) 8.22.11 The DVM .should read approximately
+48 VDC. I & C -001 Initial 
* * ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER_ lPD-18 .1. 009 REV.NO.
DATE 5/24/82 PAGE 44 OF 50 ---TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.22.12 8.22.13 Move the positive lead of the DVM to TD-1 Terminal 2 and measure the resistance to gr_ound (GND) . The DVM should indicate an Open. Connect the Digital Voltmeter (AC Scale) as follows: 8.22.13.l TD-1, Terminal 1 8.22.13.2 TD-1, Terminal 5 8.22.14 NOTE: 8.22.15 The.DVM* should read 0 VAC. A DVM indication of 25 VAC or less is considered noise. Measure the resi.stance between* TD-1, Terminal 1 and TD-1, Terminal 5. The DVM should indicate an OPEN. Initial 8.22.16 In the output test cabinet, return the test switch 602 to the UNBLOCK position and verify the TL/TXC Alarm light extinguishes. 
.. . }( * *
* SALEM GENERATING STATION . PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 PAGE 45 OF 50 TITLE


==8.0 Instructions==
==8.0 Instructions==
(Continued) 8.22.17 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from the Control . Board. NOTE: The pushbutton must be pushed even when BEZEL block light is lit. (ND can be applied if their permissives are not present, therefore, only those permitted will be set.) 8.22.17.1 Block Source Range-Train B
(Continued)                                                                                                                                 Initial 8.17 Perform the following for Output Relay Testing and Record'results on TABLE III.
8.22.17.2 Block Intermediate Range-Train B pushed. 8.22.17.3 Block Power Range -Train B pushed. WARNING: The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.
8.17.1        Place the MASTER RELAY SELECTOR in Position "l".
8.22.18 Place the Input Error Inhibit Switch in the NORMAL position
8.17.2        Depress SLAVE TEST A pushbutton and verify that the required "A" lamps lights while pushbutton is depressed.                                                                            Verify the required lamps light by placing an "X" under each on*requirement.
* I & C -001 Initial ----
8.17.3        Repeat Step 8.17.2 for SLAVE TEST B.
* . 'X * *
8.17.4        Repeat Steps 8.17.2 and 8.17.3 for each MASTER RELAY SELECTOR position listed on TABLE III.
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.1.009 1 5/24/82 PAGE 46 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.23 Perform the following for Spray Actuation Test. 8.23.1 Depreas Spray Test pushbutton for each of the individual channels and verify proper indication at the Control Board . 8.23;1.l Channel I Containment Pressure Hi-Hi I 8. 23 .1. 2 Channel II Containment Pressure Hi-Hi II 8.23.1.3 Channel III Containment Pressure Hi-Hi III 8.23.1.4 Channel IV Containment Pressure 8.23.2 8.23.3 "Hi-Hi. IV Place input ERROR INHIBIT Switch in the INHIBIT position.
c..*    -
( ' . \ \.
                                          ~*
                                            ~
                                              \-z:..:.  .......... -1...*.i '--
                                                                                .      (I
                                                                                          ~
H            .
                                                                                                                      \::""l...
                                                                                                                                'II
                                                                                                                                    ** ....      ~ <"
i ..
                                              \                                                        "'"'"~        ~*J          -  ......"'\_.,.      ,~,.,,,      S:\v:.....* *~
                                                '~~ \....                        \.:>f'; ,..; ;...\... *      \j"~,...~ \,:''\              \&deg;")*~t:. <!..        C'\~
c      ~                V---~*C.      \  ~      &#xa5;..i.vc i_ ., -~\:!C<'3;                        \I... "-.:*<.*l\ ~  \t. 1<:C 'C. \
                                                    \<... lcC:~                    . \.;.. \..:: '.C      -~~-Q..
                                                                                      \
                                                  -.,                                        .. ,,                '.'\
".i.                                            ''~\'\""c.c....                              "A          ~(...
                                                  ~~ .;* \-                      (-'1- *" . :. \. ._
* 1 a. r _ nn1
 
SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
DATE        5/24/82 PAGE  36    OF 50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                SLAVE RELAY CONTINUITY LAMPS SELECTOR              SLAVE RELAY FUNCTION          Al    A2    A3    A4      Bl      B2    B3  B4 1      CONTAINMENT ISOLATION, PHASE A            ON    ON    ON    OFF    ON      ON    ON  OFF 2      CONTAINMENT VENTILATION ISOLATION        ON    OFF    OFF    OFF    ON    *oFF  OFF OFF 3      STEAM STOP VALVES                        ON    OFF    OFF    OFF    ON      O;F'F OFF OFF 4      SPRAY ACTUATION                          ON    OFF    OFF    OFF    ON      ON    OFF OFF 5      CONTAINMENT ISOLATION, PHASE B            ON    ON    OFF    OFF    ON      ON    OFF OFF 6      FEEDWATER VALVES (HI-HI STEAM            ON    OFF    OFF    OFF    OFF    pFF  OFF OFF GENERATOR LEVEL) 7      TRIP TURBINE/MAIN FEEDWATER PUMPS        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF
 
SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)
TEST PROCEDUHE
* NUMBER -
REV. NO.
lPD-18 .1. 009 1
5/24/82 DATE PAGE  37    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                              SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION              Al    A2    A3    A4      Bl    B2  B3  B4 8      RCP UNDERFREQUENCY                      ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 9      SPARE                                  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 10        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 11        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 12        LO-LO TAVG STEAM DUMP INTERLOCK        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 13        LOSS OF POWER/TURBINE AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF. OFF OFF 14        LOW WATER LEVEL/MOTOR AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 15        LOW WATER LEVEL/TURBINE AUXILIARY PUMP  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF
 
,/\
SALEM GE.A TING STATION                                            NUMBER -      lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C)                                  REV. NO.      1 TEST PAOCEDUUE DATE          5/24/82 PAGE    38    OF  50 TITLE        SOI, ID STATE PROTECTION SYSTEM FUNCTION~L  TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                  SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION                Al    A2    A3      A4. Bl    B2  B3  B4 16        GENERATOR TRIP & .STEAM DUMP INTERLOCK    ON    OFF    OFF    OFF    OFF    OFF  OFF  OFF 17        TAVG AND REACTOR TRIPPED                  ON    OFP    OFF    OFF    ON    OFF  OFF  OFF 18        SAFETY INJECTION .                        ON    ON    ON      ON      ON    ON  ON  ON 19        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 20        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 21        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 22        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 23        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF OFF      OFF                                        OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF
 
SALEM GENERATING STATION                      NUMBER -      lPD-18 .1. 009 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE                                  PAGE      39  OF SO SOLID STATE PROTECTION SYSTEM FUNCTIONAL T.EST TRAIN B TITLE
 
==8.0 Instructions==
(Continued)                                          Initial 8.18 Place the MULTIPLEXER TEST switch to Normal.
8.19 Replace (if required) the field lead to TB-506-2 lifted  ~n Step 8.14.
8.20 Inform the Control Operator that a containment ventilation isolation will be initiated if a high radiation alarm is present when this procedure is completed.      Inform him that -he may reset the containment ventilation isolation at this time.
8.21 Manual Input Function Test
                                      -NOTE-  8.~\.\)  8.ai.\.&deg;t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped                      Operational 8.21.1    Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .
 
**          SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE PAGE lP D-18 . 1. 0 0 9 5/24/82 40    OF    50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                            Initial
                                            *-WARNING-Reactor By-pass Breaker B must remain energized for the duration of the manual testing, otherwise a Reactor Trip will occur *
* 8.21.2      At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7.
High Pressure Trip).
(Pressurizer 8.21.3      In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.
: 8. 21. 4    At the Control Board, verify that Reactor Trip Break~r  B is OPEN.
: 8. 21. 5    Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.
8.21.6      Release the pushbuttons depressed in Step 8.21.3 .
I & C - 001
 
'x
* SALEM GENERATING STATION                  NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)            REV. NO.  -*--=l=--------
DATE          5/24/82 TEST PROCEDURE PAGE  41    OF  50 TITLE      . SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                      Initial
: 8. 21. 7  Place the LOGIC A Test Switch in the OFF position.
: 8. 21. 8  Have the Control Opeator close the Reactor Trip Breaker B .
**                        8.21.9    Have the Control Operator OPEN Reactor By-Pass Breaker B.
8.21.10  Have the Control Operator rack Out Reactor By-Pass Breaker B.
8.21.11  Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B .
* I I & C
* 001
 
. )<
* SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ _~
PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE PAGE
                                                                      - OF  50 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                    Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.
8.22.1    Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated, depress the BLACK button to extinguish it .
8.22.2    In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK  OUT~UT  position.
8.22.3    Connect the Digital Voltmeter as follows:
8.22.3Al
* TD-1, Terminal 6 (+)
8.22.3.2  Logic Ground (GND) 8.-22.4    The DVM should read approximately +48 VDC.
8.22.5    Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.
8.22.6    The DVM should indicate 0 VDC.
I & C - 001
 
.x SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE PAGE  43    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                      Initial 8.22.7    Latch-up Relay K602 by depressing the latch plunger and time the interval from this point until the voltmeter reads approximately *+48 VDC.    (The time should be 60 to 65 sec.)
                                    - - - - -sec.
* 8.22.8      At the Control Board depress the S.I.
Block/Reset pushbutton and verify the following:
8.22.8.1  DVM indicates 0 VDC 8.22.8.2  MEMORY SET lamp lights 8.22.8.3  Relay K602 Resets 8.22.9    Return the MEMORIES switch to the OFF position.
8.22.10    Connect the Digital Voltmeter as follows:
8.22.10.l TD-1, Terminal 6 (+)
**                        - 8.22.10.2 IDgic Ground (GND) 8.22.11    The DVM .should read approximately +48 VDC.
I & C - 001
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER_
REV.NO.
DATE PAGE lPD-18 .1. 009
                                                          ~l~~~~~~~
5/24/82
                                                              - OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                      Initial 8.22.12    Move the positive lead of the DVM to TD-1 Terminal 2 and measure the resistance to gr_ound (GND) . The DVM should indicate an Open.
* 8.22.13    Connect the Digital Voltmeter (AC Scale) as follows:
8.22.13.l TD-1, Terminal 1 8.22.13.2 TD-1, Terminal 5 8.22.14    The.DVM* should read 0 VAC.
NOTE:      A DVM indication of 25 VAC or less is considered noise.
8.22.15    Measure the resi.stance between* TD-1, Terminal 1 and TD-1, Terminal 5.      The DVM should indicate an OPEN.
8.22.16    In the output test cabinet, return the test
**                        switch 602 to the UNBLOCK    outp~t  position and verify the TL/TXC Alarm light extinguishes.
 
. }(
SALEM GENERATING STATION .                                                    NUMBER -              lPD-18 .1. 009 REV. NO.              1 PERFORMANCE DEPARTMENT (I & C)
DATE                  5/24/82 TEST PROCEDURE PAGE        45        OF      50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~
 
==8.0 Instructions==
(Continued)                                                                                  Initial 8.22.17             Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from the Control
                                                . Board.
NOTE:               The pushbutton must be pushed even when BEZEL block light is lit.                               (ND block~ can
* be applied if their permissives are not present, therefore, only those permitted will be set.)
8.22.17.1 Block Source Range-Train B                                       pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.
8.22.17.3 Block Power Range - Train B pushed.
WARNING:             The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.
8.22.18             Place the Input Error Inhibit Switch in the NORMAL position
* I & C -001
 
. 'X SALEM GENERATING STATION                                                                                 NUMBER -     lPD-18.1.009 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE   46   OF 50 TITLE                                     SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                                 Initial 8.23 Perform the following for Spray Actuation Test.
8.23.1                       Depreas Spray Test pushbutton for each of the individual channels and verify proper indication at the Control Board .
* 8.23;1.l                   Channel I Containment Pressure Hi-Hi       I
: 8. 23 .1. 2               Channel II Containment Pressure Hi-Hi       II 8.23.1.3                   Channel III Containment Pressure Hi-Hi       III 8.23.1.4                   Channel IV Containment Pressure "Hi-Hi.       IV 8.23.2                        Place input ERROR INHIBIT Switch in the
* 8.23.3 INHIBIT position.
Place the MODE Selector switch in the OPERATE position.
Place the MODE Selector switch in the OPERATE position.
I Iii c j 001 * ****-**)  
I Iii c j 001
*.-*o*.-, ...  
  * ****- **) *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**
* --**** .** Initial 
 
* . x' * *
  ~
* I & C -001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18 .1. 009 1 5/24/82 PAGE 47 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions: (Continued) 8.23.4 Actuate"the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those rni tted will be set. 8.23.4.1 Pressurizer Safety Injection . 8.23.4.2 Steamline Pressure Safety Injection. -NOTE-Safeguard actions which are being blocked by virtue of having been Reset from the Control ', Bezels will be re-initiated  
. x' SALEM GENERATING STATION                                                                                                                       NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                                                                                                 REV. NO.     1 DATE         5/24/82 TEST PROCEDURE PAGE   47   OF   50 TITLE                                                 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
*at this time if necessary logic signal is present. The guard actions involved are: 1. Containment Spray 2. Phase A Isolation
 
: 3. Phase B Isolation
==8.0 Instructions==
: 4. Feedwater Isolation
(Continued)                                                                             Initial 8.23.4                       Actuate"the following MANUAL BLOCKS using the pushbuttons on the Control Board.                                               No blocks can be applied if their permissives are not present; therefore, only those per-rni tted will be set.
: 5. Containment Ventilation Isolation from Safety Injection Signal. Inform the Control Operator of this condition . Control Operator **...* --* , .. *" ...... -**. -.... :::**._"!'.
8.23.4.1                   Pressurizer Safety Injection .
r-.-.-*-***""!--*  
* 8.23.4.2                   Steamline Pressure Safety Injection.
...... _._,._. *****---:-**--*---.......... , .. -,. -..... --* . *-. . .. . ****-.*... Initial 
Safeguard actions which are being blocked by
.. .. * *
                                                                                                                                              -NOTE-virtue of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present.                                                       The safe-guard actions involved are:
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT
: 1.           Containment Spray
{I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO.
: 2.           Phase A Isolation
DATE 5/24/82 PAGE 48 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 8.0 Instructions:
: 3.           Phase B Isolation
*8.23.s 8.23.6 (Continued)
: 4.           Feedwater Isolation
Place the Input ERROR Inhibit switch in the NORMAL position.
: 5.           Containment Ventilation Isolation from Safety Injection Signal.
Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a iesult of this test
Inform the Control Operator of this condition .
* Control Operator I & C -001
  **...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)
TEST PROCEDURE NUMBER -
REV.NO.
DATE PAGE lPD-18 .1. 009
__;;l;;__~~~~~~
5/24/82 48   OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
 
==8.0 Instructions==
(Continued)                                      Initial
                        *8.23.s   Place the Input ERROR Inhibit switch in the NORMAL position.
8.23.6    Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a iesult of this test *
* 8.24 Perform the following for the Multiplexer checks.
* 8.24 Perform the following for the Multiplexer checks.
* WARNING: It is necessary that SSPS Train A Mul tip],exer . Switch be in the normal position and that its general warning lamp be off. If the lamp is already on, it is necessary that it be cleared before the A & B position is selected in the *other train. 8.24.1 8.24.2 NOTE: Place Train B Multiplexer Test Switch to the A & B position.
* WARNING:   It is necessary that SSPS Train A Mul tip],exer .
Verify no intermittent condition exists. An intermittent (on/off) condition is when the indication appears at the control board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.
Switch be in the normal position and that its general warning lamp be off. If the lamp is already on, it is necessary that it be cleared before the A & B position is selected in the
I & C -001 Initial 
                              *other train.
'. .. ... X* " * *
8.24.1     Place Train B Multiplexer Test Switch to the A & B position.
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE*
8.24.2    Verify no intermittent condition exists.
NUMBER -lPD-18 .1. 009 REV.NO. _l ______ _ DATE. 5/24/82 PAGE 49 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B Instructions: (Continued) 8.24.3 8.24.4 Place Train B Multiplexer Test Switch to the Normal position.
NOTE:      An intermittent (on/off) condition is when the indication appears at the control board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.
If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the Controls Operator depress S.I. Reset for Train B. Remove jumper: ----Initial Senior Shift Supervisor/Shift Supervisor 9.0 System Return to Normal: 9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal. Senior Shift Supervisor/Shift Supervisor Date/Time 1 s. c -001 Initial 
I & C - 001
.. ,.. ,,,. .. x ,*
 
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18 .1. 009 REV.NO.
                              -~-------
DATE 5/24/82 PAGE 50 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 10. 0 Remarks: w.o. I.O .
X*
* 11.0 Completion:
SALEM GENERATING STATION                   NUMBER -   lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
11.l Completed by: --------Technician Date Time
PERFORMANCE DEPARTMENT (I & C)
* 11.2 Approved by: --------Supervisor Time Date I & C -001 .....................  
DATE.       5/24/82 TEST PROCEDURE*                              PAGE 49   OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
.,..-... -*.***-.-:.***-
                ~.*o  Instructions: (Continued)                                     Initial 8.24.3   Place Train B Multiplexer Test Switch to the Normal position.
... --.....................  
8.24.4    If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the Controls Operator depress S.I. Reset for Train B.
... *-,, ... -...... .}}
Remove jumper:
Initial Senior Shift Supervisor/Shift Supervisor 9.0 System Return to Normal:
9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.
Senior Shift Supervisor/Shift Supervisor
* Date/Time 1 s. c - 001
 
          ..~
. x ,*
NUMBER -     lPD-18 .1. 009 SALEM GENERATING STATION REV.NO.   --"l~------
PERFORMANCE DEPARTMENT (I & C)
DATE         5/24/82 TEST PROCEDURE                                                                                              PAGE   50   OF   50 TITLE                                 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
: 10. 0 Remarks:                                                               w.o.                                 I.O .
11.0 Completion:
11.l Completed by:
Technician           Date           Time
* 11.2 Approved by:
Supervisor         Date            Time I & C -001
                    ..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .}}

Latest revision as of 12:45, 23 February 2020

Rev 1 to Solid State Protection Sys Function Test-Train B.
ML18087A736
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/02/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.1.009, NUDOCS 8303160573
Download: ML18087A736 (52)


Text

NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES .

ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:

1\71 lC.J PERMANENT (GREEN)

D *TEMPORARY (ORANGE)

  • EXPIRES:

ALL ON*THE*SPOT CHANGES TO BE CONSIDERED !="OR APPLICABILITY TO BOTH UNITS.

[ZJ UNIT I PROCECURENO. ___ \~\=>--.....\J...._-_\~B........

  • ~'~*~O~L~~q--*_________ REV. NO. _ _\_ _ _ CHANGE No._\..___ _

~ UNITZ PROCECURENO.~~c:9-.---..?n.......~-__.\~B-'_*~\-*___,OQ~-C\_,________ REV. NO._--.._ _ CHANGE NO._.;___ _\

PROPOSED CHANGE:

<a.'d-,.\.L\, res.:1-,.s, e.~,.,1.1_, ca.~\.\\;i 1 A~~ B.~\,\'1 B. ~'- \ J

'8. d.. \. C\ ) CC> . d-L \ u REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

°SP.W'Q.. ~

AUTHORIZATION: ~**S ERViORIN

.;~ CHARGE

~ DATE OR SHIFT SUPERVISOR

-SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO ~OTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL I ~I D ()l!!clratt'-

~ D .19K~THEAD c:~:I'"t:J"'.3 ~ ~ .  :' SORC \:HAIRMAN) l?tl I ~r~

MANAGER.* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

' 8303160573 830314 PDR ADOCK 05000272 S PDR.

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE.

  • \

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAF~TY RELATED PROCEDURE:

lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS: FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .

PERF. ENGR. SORC STA. SUPT.

REV APPROVED REVIEWED APPROVED 1

'x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. _l~------

DATE _5~/~2~4~/~8~2_______

TEST PROCEDURE PAGE 1 50

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

1.0 Purpose

l*.1 The purpose of this procedure is to verify the operability of Solid State Protection System Train B.

1.2 To satisfy the train surveillance requirement of the technical specifications *

  • 2.0

References:

2ol Solid State Protection System Manual.

2.2 Wiring Diagrams: 203688, 2~2885, 224305

I

\

  • ' x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009
    • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV.NO.

DATE

_1_*------------~

5/24/82 PAGE 2

--- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

3.0 Precautions

3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test conditions into

    • 3.2 both trainsc Test conditions may be applied to one train using its*

. built-in testers, while the opposite train is used to ma~ntain the plant protection and provide data to the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to insure successful completion *

,x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. 1~~~~~~~

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82


~--~-------

  • TEST PROCEDURE PAGE 3 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0 Limitations and Actions:

4.1 If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standardo This shall be done prior ~o taking any other corrective action.

\.._.

4o2 If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately

_ and PD-14.1.001 shall be performed.

4o3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately. Exceptions*

to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.

Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4o4 An entry will be made in the Remarks section of this

  • procedure indicating any deficiency and the corrective action taken.
  • X SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. ....;;;..l_ _ _ _ _ __
  • PERFORMANCE DEPARTMENT (I & C)

DATE _S~/...:2;..;;4-'-/..;;.8=2_ _ __

TEST PROCEDURE PAGE _4_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 5.0 Test Equipment:

Device Name PD No. Recal. Date Fluke (2)

Stop Watch

SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _s__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:

6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.

Supervisor 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 603 The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.

Control Operator

SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • PERFORMANCE DEPARTMENT (I & C)

REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 6 OF so TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0 System Line~up:

7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position .

  • Safeguard actions which are being blocked by virtue of having been *Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are:
1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. ---=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE _7_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

8.1 Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).

8elel Bus #1 TB-110 - 11 & 12 VAC 8olo2 Bus #2 TB-210 - 11 & 12 VAC

  • 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11 12 12 VAC VAC 8.1.5 Bus #1 TB--654 - 2 & 12 VAC 8.2 Open the front doors of Train B Logic Bay and Train B Output Relay Bay.
8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1 +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
  • 8.3.2 As Found As Left

+48VDC #2 Required 48.7 + 0.2 VDC As Found . As Left

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. *l

  • PERFORMANCE DEPARTMENT (I & C) ~~~~~~~-

DATE 5/24/82 TEST PROCEDURE PAGE ---..8__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.3.3 +lSVDC #1 Required 15.7 + 0.2 VDC As Found As Left

+15VDC #2 Required l5o7 + 0.2 VDC

  • As Found As Left 8.4 Verify the followi.ng Solid State Protection System General Warnings Lamps are Off o 8 4 .1
0. General Warning Lamp - Train A 8.4.2 General Warning Lamp - Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

General Warning Lamp - Train A

  • 8.5.2 General Warning Lamp - Train B

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. ~l~~~~~~-

  • PERFORMANCE DEPARTMENT (I & C)

DATE _5~/_2_4~/_8_2_______

TEST PROCEDURE PAGE OF 50 9

TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.6 On the Logic Test Panel, verify that each of the following indicators will light by depressing it.

8.6.1 Testing 8.6.2 Bad 8.6.3 . Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2 8.6.8 1/3 8.6.9 1/4 8.6.10 2/2

  • 8.6.11 8.6.12 2/3 2/4
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE

. lPD-18 .1. 009

~l~~~~~~-

PAGE 5/24/82 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.7 Record UV Coil Voltage Meter Reading.

.. Required 43 VDC + 2 VDC

((w~:n, ~~hh~~~~~~( O\~~.°.~:.~1 ~ ~.~~l~*:; <->.~.:~~*~:ni-\~--:.

\ "'-"" *~ ~ '.:, t: ..,_. l:"<ffi c. *1-.. \*;:i :H><.'- 1G t..ic ~ , :** 1.-.. L.. *

,t ~--~ L1<.- i 1~\

/

8.8 On the Outpu~ Relay Test Panel, place the Mode Selector Switch in the Test position.

8.9 Verify the Operate Lamp is not lighted.

8.10 Verify the General Warning Lamp is lighted~

8.11 Verify the operation of the Semi-Automatic Tester.

Self-check as follows:

-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.

8.11.1 Verify that the continuity lamp is lighted .

  • 8.11.2 On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.

x SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. l PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11~3 Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.

8.11.4 Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS

  • on Al08 light.

On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.

Place the MULTIPLEXER TEST switch to the A & B position.

  • ~.

8.11.7 Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.

Depress and release the TEST pushbutton.

8.11.8.l Verify that the amber testing lamp lights.

8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.

8.11.8.3 Verify that the GOOD lamp lights.

x SALEM GENERATING STATION NUMBER- lPD-18.1.009 REV. NO. 1

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE .;;;1~2__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11.8.4 In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.

8.11.9 Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.

8.11.10 ~epress and release th~ Test pushbutton.

8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.

8.11.10.2 Verify that the red BAD lamp lights.

8.11.11 Place the MULTIPLEXER TEST switch to INHIBIT *.

8.12 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Cont.rel Operator CLOSE Reactor Trip Breaker (B)

  • 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.

8.13.1 lR-llA Containment or Vent Particulate

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. -=-1_ _ _ _ _ __

  • PERFORMANCE DEPARTMENT (I & C)

DATE ~5~/~2~4~/~8=2~~~-

TEST PROCEDURE 13 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.13.2 1R-12A Containment or Vent Gas Effluent.

8.13.3 1R-12B Containment or Vent Gas Effluent (Iodine)

  • 8.14 If any high RADIATION ALARM is present in
  • Steps 8.13e1 through 8 .13. 3 lift the *field lead on terminal TB-506-2.

8.15 Perform the following for LOGIC and PERMISSIVE testing. Record results on TABLE I.

WARNING: If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and

-remain on. It is then necessary to refer to Section 6.3 of the Solid State Protection System Manual to troubleshoot and define the cause.

Verify the following switches are in *the positions indicated *

  • 8.15.1.1 Logic A 8.15.1.2 _Logic B OFF 24

.x SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV. NO.

DATE 1

5/24/82 PAGE ..;;;;l;..;;..4_ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.15.1.3 Logic C 24 8.15.1.4 Logic D 24

  • 8.15.l.6 8.15.2 Memories OFF Place Logic A switch to position "l" and verify that Function Logic! Lamp 2/3 lights.

8.15.3 Depress and. release the TEST pushbutton.

The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and

. ~

. I the Green GOOD Lamp should 1light. The I

GOOD Lamp will extinguish ;*1he next tl.me the TEST pushbutton is dep;ressed ..

Place the Blocking Functi~n Test Switch to the opposite position and r~peat Steps 8.15.2 and 8.15.3 *

  • 8.15.5 Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.

SALEM GENE.ING ST ATION PERFORMANCE DEPARTMENT TEST PROCEOUHE 0& C)

  • NUMBER_

REV.NO.

DATE lPD-18 .1. 009 l

~~~~------~

5/24/82 PAGE 15 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION.

TEST SWITCH PER- BLOCKS LOGI C LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED OFF 24 24 24 OFF OFF (GOOD OR BAD) 1 24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2 24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3 3 24 24 24 OFF LOSS OF FLOW, LOOP 3 2/3 4 24 24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5 24 24 24 OFF LOSS OF FLOW, RCP 2/4 6 24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4

,/\

SALEM GE.A TING ST A TION NUMBER - lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUBE DATE 5/24/82 50 PAGE

- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED .l 7 24 24 24 OFF PRESSURIZER, HIGH PRESSURE TRIP 2/4 8 24 24 24 OFF PRESSURIZER, HIGH WATER LEVEL 2/3 TRIP 9 24 24 24 OFF LOW FEEDWATER FLOW, LOO:P 1 1/2 10 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 1 1/2 11 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2 12 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2

SALEM GE.A TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82 DATE PAGE 17 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT . ;

A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 13 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 14 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 15 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 16 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 17 24 24 24 OFF OIL PRESSURE SWITCHES REACTOR 2/3 TRIP 18 24 24 24 .OFF STOP VALVES GENERATOR TRIP 2/2

19. 24 24 24 OFF STOP VALVES GENERATOR TRIP 2/2

SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • ~'; .
  • NUMBER -

REV. NO.

lPP-18 .1. 009 1 .*

5/24/82 DATE PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS. FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC 'MIS- TEST INHIBIT NOT A B C .D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24 OFF SOURCE RANGE TR+P 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO LOGIC B 23 1 *24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2 24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3 24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4

SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

TEST PAOCEDUHE DATE 5/24/82 PAGE 19 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH

  • PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 4 24 24 OFF' POWER RANGE, HIGH SETPOINT TRIP 2/4 23 5 24 24 .OFF OVERTEMPERATURE DELTA T TRIP 2/4 23 6 24 24 OFF OVERPOWER DELTA T TRIP 2/4 23 7 24 24 OFF RCP UNDERVOLTAGE TRIP 2/4 23 8 24 24 OFF RCP UNDERVOLTAGE TRIP 1/2 23 9 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 1/2 PUMP

SALEM GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUBE

    • NUMBER_

REV. NO.

lPD-18 .1. 009 1 .

5/24/82 DATE PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 *24 24 OFF HIGH STEAMLINE FLOW, LOOP 4 1/2

I\

SALEM G.ATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) 1 REV. NO.

TEST PROCEDU'HE 5/24/82 DATE PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC . BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 16 ~4 24 OFF STEAMLINE ISOLATION 2/4

~3 17 24 24 OFF HIGH .CONTAINMENT PRESSURE, 2/3 SAFETY INJECTION 23 18 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4.

SPRAY ACTUATION 23 19 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 20 24 24 OFF HI-HI CONTAI'NMENT PRESSURE, 2/4 STEAM STOP VALVES

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

DATE lPD-18 .1. 009 1

5/24/82 PAGE 22 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC .& PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH LOGIC LOGIC LOGIC LOGIC PER-MIS- TEST INHIBIT BLOCKS NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED i 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 23 24 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRO TO LOGIC C 23 24 l 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 1

I\

SALEM G.ATING ST A TION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 TEST PROCEDUHE DATE 5/24/82 PAGE 23 OF 50 TITLE SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-:- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS .INHIBITED 23 24 2 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5 24 OFF PRESSURIZER PRESSURE 2/3 23 24. 6 24 OFF PRESSURIZER PRESSURE 2/3 23 24 7 24 OFF PRESSURIZER PRESSURE 2/3

SALEM GE.ATING STATION

  • PERFORMANCE DEPARTMENT (I & Cl TEST PAOCEDUHE
    • NUMBER:-

REV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 24 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH .

PER- . BLOCKS LOGI C LOGIC LOGIC LOGIC MIS~ TEST INHIBIT NOT A B C D S.IVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 8 24 OFF STEAM GENERATOR LO-LO WATER 2/3

.LEVEL LOOP 1 23 24 .9 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP. 2 23 24 10 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 3

~ ..

23 24 11 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 4 23 24 i2 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL TRIP

\, -

S~LEM G a ATING ST ATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER-REV. NO.

lPD-18.1.009 1

5/24/82 DATE PAGE 25 50

--- OF ---

TITLE SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 13 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL, MOTOR FEED PUMP 23 24 14 24 OFF .STEAM GENERATOR *LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 . 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2 23 24 17 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 3

SALEM GU*

  • TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBEA-AEV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 50

-2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOG IC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPUT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4

SALEM GE.ATINGSTATION PERFORMANCE DEPARTMENT TEST PAOCEDUHE 11 & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 _* 24 OFF FEED THRU TO LOGIC D 23 24 24 1 OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2 OFF UV DIODES AND OUTPUT 1/4 23 24 24 3 OFF UV DIODES AND OUTPUT 1/4 23 24 24 4 OFF UV DIODES AND OUTPUT 1/4 23 24 24 5 OFF UV DIODES AND OUTPUT 1/4 23 24 24 6 OFF UV DIODES AND OUTPUT 1/4

SALEM GEa TING STATION PERFORUANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/27/82 PAGE 28 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC *& PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC . LOGIC LOGIC LOGIC MIS- TEST INHIBI'I' NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 7 OFF FEEDWATER CONTROL 1/2 23 24 24 8 OFF FEEDWATER CONTROL 1/1 23 24 24 9 OFF RCP UNDERFREQUENCY 2/4 23 24 24 10 OFF RCP UNDERFREQUENCY 1/2 23 24 24 11 OFF RCP UNDERFREQUENCY 1/2 23 24 24 12 OFF RCP UNDERFREQUENCY 2/4 23 24 24 13 OFF POWER RANGE, HI FLUX RATE TRIP 2/4

SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE.

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 29 OF 50

"'IT(U: SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 14 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 15 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 16 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 17 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24. 24 18 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 19 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION

SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 30 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

. TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEpT INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 20 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 21

- OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 22 OFF SAFETY INJECTION, PHASE A* 1/1 ISOLATION 23 24 24 23 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 24 OFF FEED THRU TO PERMISSIVES 23 24 24 24 1 P6 1/2

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

TEST PROCEDUHE DATE 5/24/82-31 50

.*4'.:

PAGE

--- OF ---

TITLE SOLID STATE PROTECTION.SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS

  • FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED_ ACTUAL BLOCKS INHIBITED 2_3 24 24 24 2 P8 2/4 23 24 24 24 3 PlO 2/4 23 24 24 24 4 P7 1/3 23 24 24 24 5 pg 2/4 !

23 24 24 24 6 P12 23 24 24 24 7 P12 2/4 23 24 24 24 8 P12 2/4

J\

SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO. 1 lPD-18.1.009 TEST PROCEDUHE DATE 5/24/82 PAGE 32 OF 50

'TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c I) SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 24 9 Pll 2/3 I I

23 24 24 24 10 P8 RCP BREAKERS 1/4 23 24 24 24 11 P8 RCP BREAKERS 1/4 OFF 24 24 24 OFF OFF OFF

  • X SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV.NO. _l~~~~~~

DATE _5/,__24~/~8_2~~~~

TEST PROCEDURE PAGE _3_3__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.16 Perform the following Memories Testing._

Record results on TABLE II.

8.16.l Place MEMORIES switch to position "l".

(The 1/4 function logic lamp will light

  • 8.16.2 whenever the MEMORIES switch is not in the OFF position) ..

In the MEMORY FUNCTION TEST portion of the LOGIC TEST PANEL, depress and. release the RED pushbutton and verify that the MEMORY SET lamp lights. (If already on, depress and release BLACK pushbutton).

8.16.3 After MEMORY SET lamp lights, depress and release BLACK pushbutton.

8.16.4 Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .

I & C - 001

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _3_4__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION FUNCTION MEMORY FUNCTION SELECTOR LOGIC TEST PUSHBUTTON MEMORIES TEST FUNCTION 1/4 RED BLACK OFF OFF (ON OR OFF) 1 POWER RANGE BLOCK

  • 2 3

INTERMEDIATE RANGE BLOCK SOURCE RANGE BLOCK 4 SOURCE RANGE BLOCK 5 SAFETY INJECTION BLOCK, PRESSURIZER 6 SAFETY INJECTION BLOCK, PRESSURIZER 7 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LEVEL ,

8 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LOGIC 9 AUTOMATIC SAFETY INJECTION BLOCK 10 FEEDWATER VALVE CONTROL

    • 11 FEEDWATER VALVE CONTROL OFF OFF I & C - 001

.~

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT° (I & C)

DATE 5/24/82


'----~---

TEST PROCEDURE 35 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.17 Perform the following for Output Relay Testing and Record'results on TABLE III.

8.17.1 Place the MASTER RELAY SELECTOR in Position "l".

8.17.2 Depress SLAVE TEST A pushbutton and verify that the required "A" lamps lights while pushbutton is depressed. Verify the required lamps light by placing an "X" under each on*requirement.

8.17.3 Repeat Step 8.17.2 for SLAVE TEST B.

8.17.4 Repeat Steps 8.17.2 and 8.17.3 for each MASTER RELAY SELECTOR position listed on TABLE III.

c..* -

( ' . \ \.

~*

~

\-z:..:. .......... -1...*.i '--

. (I

~

H .

\::""l...

'II

    • .... ~ <"

i ..

\ "'"'"~ ~*J - ......"'\_.,. ,~,.,,, S:\v:.....* *~

'~~ \.... \.:>f'; ,..; ;...\... * \j"~,...~ \,:\ \°")*~t:. <!.. C'\~

c ~ V---~*C. \ ~ ¥..i.vc i_ ., -~\:!C<'3; \I... "-.:*<.*l\ ~ \t. 1<:C 'C. \

\<... lcC:~ . \.;.. \..:: '.C -~~-Q..

\

-., .. ,, '.'\

".i. ~\'\""c.c.... "A ~(...

~~ .;* \- (-'1- *" . :. \. ._

  • 1 a. r _ nn1

SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 36 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 1 CONTAINMENT ISOLATION, PHASE A ON ON ON OFF ON ON ON OFF 2 CONTAINMENT VENTILATION ISOLATION ON OFF OFF OFF ON *oFF OFF OFF 3 STEAM STOP VALVES ON OFF OFF OFF ON O;F'F OFF OFF 4 SPRAY ACTUATION ON OFF OFF OFF ON ON OFF OFF 5 CONTAINMENT ISOLATION, PHASE B ON ON OFF OFF ON ON OFF OFF 6 FEEDWATER VALVES (HI-HI STEAM ON OFF OFF OFF OFF pFF OFF OFF GENERATOR LEVEL) 7 TRIP TURBINE/MAIN FEEDWATER PUMPS ON OFF OFF OFF OFF OFF OFF OFF

SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82 DATE PAGE 37 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 8 RCP UNDERFREQUENCY ON OFF OFF OFF OFF OFF OFF OFF 9 SPARE ON OFF OFF OFF OFF OFF OFF OFF 10 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 11 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 12 LO-LO TAVG STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 13 LOSS OF POWER/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF. OFF OFF 14 LOW WATER LEVEL/MOTOR AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF 15 LOW WATER LEVEL/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF

,/\

SALEM GE.A TING STATION NUMBER - lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUUE DATE 5/24/82 PAGE 38 OF 50 TITLE SOI, ID STATE PROTECTION SYSTEM FUNCTION~L TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4. Bl B2 B3 B4 16 GENERATOR TRIP & .STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 17 TAVG AND REACTOR TRIPPED ON OFP OFF OFF ON OFF OFF OFF 18 SAFETY INJECTION . ON ON ON ON ON ON ON ON 19 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 20 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 21 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 22 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 23 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 39 OF SO SOLID STATE PROTECTION SYSTEM FUNCTIONAL T.EST TRAIN B TITLE

8.0 Instructions

(Continued) Initial 8.18 Place the MULTIPLEXER TEST switch to Normal.

8.19 Replace (if required) the field lead to TB-506-2 lifted ~n Step 8.14.

8.20 Inform the Control Operator that a containment ventilation isolation will be initiated if a high radiation alarm is present when this procedure is completed. Inform him that -he may reset the containment ventilation isolation at this time.

8.21 Manual Input Function Test

-NOTE- 8.~\.\) 8.ai.\.°t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped Operational 8.21.1 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .

    • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lP D-18 . 1. 0 0 9 5/24/82 40 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • -WARNING-Reactor By-pass Breaker B must remain energized for the duration of the manual testing, otherwise a Reactor Trip will occur *
  • 8.21.2 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7.

High Pressure Trip).

(Pressurizer 8.21.3 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.

8. 21. 4 At the Control Board, verify that Reactor Trip Break~r B is OPEN.
8. 21. 5 Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.

8.21.6 Release the pushbuttons depressed in Step 8.21.3 .

I & C - 001

'x

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. -*--=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE 41 OF 50 TITLE . SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

8. 21. 7 Place the LOGIC A Test Switch in the OFF position.
8. 21. 8 Have the Control Opeator close the Reactor Trip Breaker B .
    • 8.21.9 Have the Control Operator OPEN Reactor By-Pass Breaker B.

8.21.10 Have the Control Operator rack Out Reactor By-Pass Breaker B.

8.21.11 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B .

  • I I & C
  • 001

. )<

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ _~

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE

- OF 50 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.

8.22.1 Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated, depress the BLACK button to extinguish it .

8.22.2 In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK OUT~UT position.

8.22.3 Connect the Digital Voltmeter as follows:

8.22.3Al

  • TD-1, Terminal 6 (+)

8.22.3.2 Logic Ground (GND) 8.-22.4 The DVM should read approximately +48 VDC.

8.22.5 Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.

8.22.6 The DVM should indicate 0 VDC.

I & C - 001

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 43 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.7 Latch-up Relay K602 by depressing the latch plunger and time the interval from this point until the voltmeter reads approximately *+48 VDC. (The time should be 60 to 65 sec.)

- - - - -sec.

  • 8.22.8 At the Control Board depress the S.I.

Block/Reset pushbutton and verify the following:

8.22.8.1 DVM indicates 0 VDC 8.22.8.2 MEMORY SET lamp lights 8.22.8.3 Relay K602 Resets 8.22.9 Return the MEMORIES switch to the OFF position.

8.22.10 Connect the Digital Voltmeter as follows:

8.22.10.l TD-1, Terminal 6 (+)

    • - 8.22.10.2 IDgic Ground (GND) 8.22.11 The DVM .should read approximately +48 VDC.

I & C - 001

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER_

REV.NO.

DATE PAGE lPD-18 .1. 009

~l~~~~~~~

5/24/82

- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.12 Move the positive lead of the DVM to TD-1 Terminal 2 and measure the resistance to gr_ound (GND) . The DVM should indicate an Open.

  • 8.22.13 Connect the Digital Voltmeter (AC Scale) as follows:

8.22.13.l TD-1, Terminal 1 8.22.13.2 TD-1, Terminal 5 8.22.14 The.DVM* should read 0 VAC.

NOTE: A DVM indication of 25 VAC or less is considered noise.

8.22.15 Measure the resi.stance between* TD-1, Terminal 1 and TD-1, Terminal 5. The DVM should indicate an OPEN.

8.22.16 In the output test cabinet, return the test

    • switch 602 to the UNBLOCK outp~t position and verify the TL/TXC Alarm light extinguishes.

. }(

SALEM GENERATING STATION . NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 45 OF 50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~

8.0 Instructions

(Continued) Initial 8.22.17 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from the Control

. Board.

NOTE: The pushbutton must be pushed even when BEZEL block light is lit. (ND block~ can

  • be applied if their permissives are not present, therefore, only those permitted will be set.)

8.22.17.1 Block Source Range-Train B pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.

8.22.17.3 Block Power Range - Train B pushed.

WARNING: The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.

8.22.18 Place the Input Error Inhibit Switch in the NORMAL position

  • I & C -001

. 'X SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 46 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23 Perform the following for Spray Actuation Test.

8.23.1 Depreas Spray Test pushbutton for each of the individual channels and verify proper indication at the Control Board .

  • 8.23;1.l Channel I Containment Pressure Hi-Hi I
8. 23 .1. 2 Channel II Containment Pressure Hi-Hi II 8.23.1.3 Channel III Containment Pressure Hi-Hi III 8.23.1.4 Channel IV Containment Pressure "Hi-Hi. IV 8.23.2 Place input ERROR INHIBIT Switch in the
  • 8.23.3 INHIBIT position.

Place the MODE Selector switch in the OPERATE position.

I Iii c j 001

  • ****- **) *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**

~

. x' SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 47 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23.4 Actuate"the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those per-rni tted will be set.

8.23.4.1 Pressurizer Safety Injection .

  • 8.23.4.2 Steamline Pressure Safety Injection.

Safeguard actions which are being blocked by

-NOTE-virtue of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present. The safe-guard actions involved are:

1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation
5. Containment Ventilation Isolation from Safety Injection Signal.

Inform the Control Operator of this condition .

  • Control Operator I & C -001
    • ...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18 .1. 009

__;;l;;__~~~~~~

5/24/82 48 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • 8.23.s Place the Input ERROR Inhibit switch in the NORMAL position.

8.23.6 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a iesult of this test *

  • 8.24 Perform the following for the Multiplexer checks.
  • WARNING: It is necessary that SSPS Train A Mul tip],exer .

Switch be in the normal position and that its general warning lamp be off. If the lamp is already on, it is necessary that it be cleared before the A & B position is selected in the

  • other train.

8.24.1 Place Train B Multiplexer Test Switch to the A & B position.

8.24.2 Verify no intermittent condition exists.

NOTE: An intermittent (on/off) condition is when the indication appears at the control board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.

I & C - 001

-~-------

X*

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE. 5/24/82 TEST PROCEDURE* PAGE 49 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

~.*o Instructions: (Continued) Initial 8.24.3 Place Train B Multiplexer Test Switch to the Normal position.

8.24.4 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the Controls Operator depress S.I. Reset for Train B.

Remove jumper:

Initial Senior Shift Supervisor/Shift Supervisor 9.0 System Return to Normal:

9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.

Senior Shift Supervisor/Shift Supervisor

  • Date/Time 1 s. c - 001

..~

. x ,*

NUMBER - lPD-18 .1. 009 SALEM GENERATING STATION REV.NO. --"l~------

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 50 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

10. 0 Remarks: w.o. I.O .

11.0 Completion:

11.l Completed by:

Technician Date Time

  • 11.2 Approved by:

Supervisor Date Time I & C -001

..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .