Line 39: |
Line 39: |
|
| |
|
| enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Sincerely, | | Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 |
| /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 | |
|
| |
|
| Division of Reactor Safety | | Division of Reactor Safety |
Line 89: |
Line 88: |
|
| |
|
| enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Sincerely, | | Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 |
| /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 | |
|
| |
|
| Division of Reactor Safety | | Division of Reactor Safety |
|
---|
Category:Inspection Report
MONTHYEARIR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 IR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20234202023-07-12012 July 2023 Security Baseline Inspection Report 05000482/2023420 - Cover Letter IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23111A0662023-04-20020 April 2023 (Cover Letter Only) Wolf Creek Generating Station Special Inspection Reactive Report 05000482-20220502 IR 05000482/20230012023-04-19019 April 2023 Integrated Inspection Report 05000482/2023001 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) IR 05000482/20234022023-02-0606 February 2023 Security Baseline Inspection Report 050004822023402 ML23017A2092023-01-18018 January 2023 Emergency Preparedness Biennial Exercise Inspection URI Closure Report IR 05000482/20220042023-01-17017 January 2023 Integrated Inspection Report 05000482/2022004 ML22333A7132022-12-0202 December 2022 License Renewal Phase 1 Report IR 05000482/20220032022-10-25025 October 2022 Integrated Inspection Report 05000482/2022003 IR 05000482/20224032022-08-31031 August 2022 NRC Security Baseline Inspection Report 05000482/2022403 IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000482/20220022022-07-25025 July 2022 Integrated Inspection Report 05000482/2022002 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public IR 05000482/20220102022-05-0505 May 2022 Biennial Problem Identification and Resolution Inspection Report 05000482/2022010 IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000482/20213012022-01-19019 January 2022 NRC Examination Report 05000482/2021301 IR 05000482/20210112021-12-0101 December 2021 Temporary Instruction 2515/194 Report 05000482/2021011 IR 05000482/20214202021-11-15015 November 2021 Inspection Report Cover Letter FOF 05000482/2021420 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 05000482/20210102021-09-0909 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000482/2021010 IR 05000482/20210022021-08-0909 August 2021 Integrated Inspection Report 05000482/2021002 IR 05000482/20214022021-07-27027 July 2021 NRC Security Baseline Inspection Report 05000482/2021402 (Cover Letter Without Enclosure) IR 05000482/20210012021-05-0505 May 2021 Integrated Inspection Report 05000482/2021001 IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) IR 05000482/20214012021-02-26026 February 2021 NRC Security Inspection Report 05000482/2021401 IR 05000482/20200042021-02-0909 February 2021 Integrated Inspection Report 05000482/2020004 IR 05000482/20200132020-12-0303 December 2020 Traditional Enforcement Follow-Up Inspection Report 05000482/2020013 IR 05000482/20200122020-11-19019 November 2020 Triennial Fire Protection Inspection Report 05000482/2020012 IR 05000482/20200032020-11-12012 November 2020 Integrated Inspection Report 05000482/2020003 IR 05000482/20204102020-09-29029 September 2020 Security Baseline Inspection Report 05000482/2020410 IR 05000482/20200022020-08-12012 August 2020 Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 IR 05000482/20200102020-08-0303 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000482/2020010 IR 05000482/20200112020-05-21021 May 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000482/2020011 IR 05000482/20200012020-05-0404 May 2020 Integrated Inspection Report 05000482/2020001 2024-09-10
[Table view] Category:Letter
MONTHYEAR05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24036A0092024-02-14014 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0075 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22165A0882022-06-14014 June 2022 Information Request, Security IR 2022403 ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22055A1142022-02-23023 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML21327A2602021-11-23023 November 2021 NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21271A1952021-09-28028 September 2021 E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 ML21253A0902021-09-23023 September 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemption for a Risk-Informed Approach to Address GSI-191 (EPIDs L-2021-LLA- 0152 and L-2021-LLE-0039) ML21221A1282021-08-0505 August 2021 NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML20302A4782020-10-28028 October 2020 OPC R1 Request for Information ML20262A7512020-09-17017 September 2020 NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 ML20195A2712020-07-13013 July 2020 Generation Station - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2020012) and Request for Information ML20133J8972020-05-12012 May 2020 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes ML20009E4802020-01-0909 January 2020 Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information ML19346E6052019-11-0404 November 2019 Target Set Request for Information for Week of November 4, 2019 ML19224A5242019-08-12012 August 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) ML18282A6402018-10-0909 October 2018 NRR E-mail Capture - Request for Additional Information - Wolf Creek Generating Station License Amendment Request for Revision to the Emergency Plan ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses ML18207A4332018-07-24024 July 2018 NRR E-mail Capture - (External_Sender) Draft Request for Additional Information Relief Request from ASME Code N-666-1 Alternate Repair of Essential Service Water Piping Wolf Creek Generating Station, Unit 1 EPID No.:L-2018-LLR-0101 ML18116A6132018-04-25025 April 2018 Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482/2018002) and Request for Information ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses ML17170A3152017-06-19019 June 2017 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2017008) and Request for Information ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML17052A0282017-02-15015 February 2017 NRR E-mail Capture - Wolf Creek Generating Station - Official EAL RAIs ML16319A4282016-11-14014 November 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Relief Requests 13R-14 and 13R-15 ML16300A2662016-10-21021 October 2016 Request for Additional Information - Relief Request I3R-13 Regarding Weld Examination Coverage IR 05000482/20160022016-08-0303 August 2016 NRC Integrated Inspection Report 05000482/2016002 ML16110A3722016-04-25025 April 2016 Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16020A1392016-01-15015 January 2016 Notification of NRC Component Design Bases Inspection (05000482/2016007) and Initial Request for Information ML15135A4862015-05-14014 May 2015 Wc 2015007 17T RFI ML15082A0052015-03-27027 March 2015 Request for Additional Information, Round 2, Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15079A0762015-03-23023 March 2015 Request for Additional Information, Round 2, Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident ML15040A6252015-02-10010 February 2015 Request for Additional Information, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML14323A5742014-12-0404 December 2014 Request for Additional Information, License Amendment Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in USAR ML14230A7572014-08-21021 August 2014 Request for Additional Information, Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval ML14206A0122014-08-0101 August 2014 Request for Additional Information, Relief Requests I3R-08, RPV Interior Attachments and I3R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval ML14197A3362014-07-25025 July 2014 Request for Additional Information, Relief Request I3R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220, Third 10-Year Inservice Inspection Interval ML14148A3872014-06-0202 June 2014 Request for Additional Information Related to Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident ML14111A1002014-04-30030 April 2014 Request for Additional Information, Nrr/Dss/Srxb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14083A4002014-04-0303 April 2014 Request for Additional Information, Nrr/Dra/Arcb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14058A0882014-03-0505 March 2014 Request for Additional Information, Nrr/De/Eeeb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14027A1622014-01-28028 January 2014 Redacted, Request for Additional Information, Round 2, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term 2022-06-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 May 14, 2015
Mr. Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION
Dear Mr. Heflin:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Wolf Creek Generating Station during July 6-10, 2015, and July 20-24, 2015. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conduc ted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications."
Experience has shown that this inspection is resource intens ive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by June 22, 2015. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Larry Stevens of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at Jonathan.Braisted@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1
Division of Reactor Safety
Docket: 50-482 License: NPF-42
Enclosure:
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection
Request for Information
Electronic Distribution to the Wolf Creek Generating Station
Enclosure Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Wolf Creek Generating Station
Inspection Report: 05000482/2015007
Inspection Dates: July 6-10, 2015, and July 20-24, 2015
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications" Lead Inspector: Jonathan Braisted, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by June 22, 2015, to the attention of Jonathan Braisted. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.
- 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
- 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
- 3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.
- 4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.
- 5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
- 6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
- 7. Procedure(s) for implementing permanent plant modifications.
- 8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
- 9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
- 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications
Inspector Contact Information:
Jonathan Braisted Nnaerika Okonkwo Grant Larkin Reactor Inspector Reactor Inspector Emergency Response Coordinator 817-200-1194 817-200-1114 817-200-1449 Jonathan.Braisted@nrc.gov Nnaerika.Okonkwo@nrc.gov Grant.Larkin@nrc.gov
Mailing Address:
U.S. NRC, Region IV Attn: Jonathan Braisted 1600 East Lamar Blvd.
Arlington, TX 76011-4125
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1
Division of Reactor Safety
Docket: 50-482 License: NPF-42
Enclosure:
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection
Request for Information
Electronic Distribution to the Wolf Creek Generating Station
Distribution See next page
ML15135A486 SUNSI Review By: JDB ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI C: NAME JBraisted TFarnholtz SIGNATURE /RA/ /RA/ DATE 5/13/15 5/14/15 OFFICIAL RECORD COPY
Letter from Adam C. Heflin from Thomas R. Farnholtz dated May 14, 2015
SUBJECT:
WOLF CREEK GENERATING STATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION
Distribution Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Chris.Speer@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov)
WC Administrative Assistant (Carey.Spoon@nrc.gov)
Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)