MONTHYEARML23179A2132023-07-0505 July 2023 Approval for Credit for the Wolf Creek Generating Station Operational Safety Review Team to the Baseline Inspection Samples/Hours ML22165A0882022-06-14014 June 2022 Information Request, Security IR 2022403 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21309A5482021-11-15015 November 2021 NSIR Staff Review of the Wolf Creek Generating Stations Security Plan Training & Qualification Plan & Safeguards Contingency Plan for the Verification of ASM EA 20 091 Incorporation ML21243A4492021-09-0202 September 2021 ISFSI Technical Assistance Request - Review of Physical Security Plan ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17019A2912017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML17019A2932017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML16064A1872016-03-0404 March 2016 Closed Pre-Decisional Enforcement Conference with Wolf Creek Nuclear Operating Corporation ML15251A0092015-09-11011 September 2015 Review of Revision 28 to the Updated Safety Analysis Report ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification ML14197A3442014-07-25025 July 2014 Review of Revision 27 to the Updated Safety Analysis Report ML13204A2432013-07-24024 July 2013 Notice of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13109A2342013-07-12012 July 2013 Safety Evaluation Regarding Wolf Creek Generating Station - Loss of Offsite Power and Augmented Inspection, Issue for Resolution 2012-004 ML13179A1012013-07-0909 July 2013 7/30/13 Notice of Forthcoming Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13093A0592013-04-0202 April 2013 Public Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Performance Assessment Results for Wolf Creek Generating Station for 2012 ML13078A1552013-03-20020 March 2013 License Amendment Request to Change Diesel Generator Surveillance Requirements ML12249A0292012-09-0606 September 2012 9/20/12 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Wolf Creek Station ML1222602142012-08-16016 August 2012 Iolb Evaluation of Ifr 2012-04 Relating to Wolf Creek Loss of Offsite Power and Notification of Unusual Event ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML1101106702011-02-0707 February 2011 Fire Protection Safety Evaluation Input for Wolf Creek Generating Station Regarding License Amendment Request for Deviation from the Fire Protection Program Requirements ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station ML0917002962009-07-30030 July 2009 Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months ML0835705252008-12-24024 December 2008 Meeting Notice, Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Pre-Application of Post-fire Safe Shutdown Issues at Wolf Creek ML0829405182008-11-10010 November 2008 Renewal of Full-Power Operating License for the Wolf Creek Generating Station, Unit 1 ML0813006882008-05-0909 May 2008 03/05/2008 Meeting Minutes of Subcommittee on Plant License Renewal Regarding Wolf Creek Generating Station ML0812001002008-04-29029 April 2008 End of Cycle Meeting with Wolf Creek Nuclear Operation Corporation IR 05000482/20080072008-04-24024 April 2008 IR 05000482-08-007, on 01/15/2008 - 03/13/2008, Wolf Creek Generating Station, NRC Special Inspection ML0810805452008-04-18018 April 2008 05/01/2008-Notice of Forthcoming Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Safety Evaluation Report Open Items Related to Metal Fatigue Analyses for License Renewal ML0807904692008-04-10010 April 2008 Summary of Teleconference with Wolf Creek Nuclear Operating Corporation, Ameren Union Electric Company for Callaway Plant, and Performance Contracting, Inc. Containment Sump Head Loss Testing ML0802500852008-03-26026 March 2008 Summary of Second Conference Call Held on January 16, 2008, with PWR Licensees on New Temporary License Amendment Needed for Steam Generator Tube Inspections in Spring 2008 Refueling Outages ML0807404192008-03-14014 March 2008 Assessment of Inspections of Dissimilar Metal Butt Welds in a Retired Pressurizer ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0807304562008-03-13013 March 2008 Cy 2007 Baseline Inspection Completion ML0804503232008-03-0303 March 2008 Summary of Third Conference Call Held with Pressurized-Water Reactor Licensees on Status of NRC Review of License Amendment Requests for Steam Generator Tube Inspections ML0807300242008-02-22022 February 2008 Status Report and Proposed Agenda for the ACRS Subcommittee on March 5, 2008 Related to the License Renewal Application of Wolf Creek Generating Stations Unit 1 ML0804504682008-02-19019 February 2008 Federal Register Notice Regarding the Meeting of the ACRS Subcommittee on Wolf Creek Plant License Renewal Application, March 5, 2008 ML0803603712008-02-0707 February 2008 Advisory Sub-Committee on Reactor Safeguards Review of the Wolf Creek Generating Station, License Renewal Application - Safety Evaluation Report with Open Items ML0800901542008-01-22022 January 2008 Summary of Conference Call Held with PWR Licensees on the Temporary License Amendment Needed for Steam Generator Tube Inspections in Spring 2008 Refueling Outages ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 ML0732500032007-11-21021 November 2007 Memo to Thomas G. Hiltz Key Issues for Discussion for November 28, 2007 Meeting on Steam Generator Tube Inspection License Amendment (Tac MD0197) ML0730901272007-11-0808 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss NRC Staff'S Request for Additional Information on Licensee'S Supplemental Letter to Letter Dated September 27, 2007, to Application Dated February 21, 2006 ML0727000542007-10-0202 October 2007 Summary of Telephone Conference Call Held on 9/26/07, Between the U.S. NRC and Wolf Creek Nuclear Operating Corporation, Concerning Draft Requests for Additional Information Pertaining to the Wolf Creek Generating Station, Unit 1, LRA 2023-07-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22165A0882022-06-14014 June 2022 Information Request, Security IR 2022403 ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22055A1142022-02-23023 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time ML22045A4512022-02-14014 February 2022 NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML21327A2602021-11-23023 November 2021 NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21271A1952021-09-28028 September 2021 E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 ML21253A0902021-09-23023 September 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemption for a Risk-Informed Approach to Address GSI-191 (EPIDs L-2021-LLA- 0152 and L-2021-LLE-0039) ML21221A1282021-08-0505 August 2021 NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML20302A4782020-10-28028 October 2020 OPC R1 Request for Information ML20262A7512020-09-17017 September 2020 NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 ML20195A2712020-07-13013 July 2020 Generation Station - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2020012) and Request for Information ML20133J8972020-05-12012 May 2020 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes ML20009E4802020-01-0909 January 2020 Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information ML19346E6052019-11-0404 November 2019 Target Set Request for Information for Week of November 4, 2019 ML19224A5242019-08-12012 August 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) ML18282A6402018-10-0909 October 2018 NRR E-mail Capture - Request for Additional Information - Wolf Creek Generating Station License Amendment Request for Revision to the Emergency Plan ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses ML18207A4332018-07-24024 July 2018 NRR E-mail Capture - (External_Sender) Draft Request for Additional Information Relief Request from ASME Code N-666-1 Alternate Repair of Essential Service Water Piping Wolf Creek Generating Station, Unit 1 EPID No.:L-2018-LLR-0101 ML18116A6132018-04-25025 April 2018 Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482/2018002) and Request for Information ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses ML17170A3152017-06-19019 June 2017 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2017008) and Request for Information ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML17052A0282017-02-15015 February 2017 NRR E-mail Capture - Wolf Creek Generating Station - Official EAL RAIs ML16319A4282016-11-14014 November 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Relief Requests 13R-14 and 13R-15 ML16300A2662016-10-21021 October 2016 Request for Additional Information - Relief Request I3R-13 Regarding Weld Examination Coverage IR 05000482/20160022016-08-0303 August 2016 NRC Integrated Inspection Report 05000482/2016002 ML16110A3722016-04-25025 April 2016 Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16020A1392016-01-15015 January 2016 Notification of NRC Component Design Bases Inspection (05000482/2016007) and Initial Request for Information ML15135A4862015-05-14014 May 2015 Wc 2015007 17T RFI ML15082A0052015-03-27027 March 2015 Request for Additional Information, Round 2, Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15079A0762015-03-23023 March 2015 Request for Additional Information, Round 2, Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident ML15040A6252015-02-10010 February 2015 Request for Additional Information, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML14323A5742014-12-0404 December 2014 Request for Additional Information, License Amendment Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in USAR ML14230A7572014-08-21021 August 2014 Request for Additional Information, Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval ML14206A0122014-08-0101 August 2014 Request for Additional Information, Relief Requests I3R-08, RPV Interior Attachments and I3R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval ML14197A3362014-07-25025 July 2014 Request for Additional Information, Relief Request I3R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220, Third 10-Year Inservice Inspection Interval ML14148A3872014-06-0202 June 2014 Request for Additional Information Related to Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident ML14111A1002014-04-30030 April 2014 Request for Additional Information, Nrr/Dss/Srxb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14083A4002014-04-0303 April 2014 Request for Additional Information, Nrr/Dra/Arcb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14058A0882014-03-0505 March 2014 Request for Additional Information, Nrr/De/Eeeb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term ML14027A1622014-01-28028 January 2014 Redacted, Request for Additional Information, Round 2, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term 2022-06-29
[Table view] |
Text
June 14, 2022 To: Mr. Mike Corbin and Mr. Jason Knust
SUBJECT:
DOCUMENT REQUEST LIST FOR BASELINE INSPECTIONS 71130.07 AND 71130.04
- Please provide the information requested below for in-office inspection and review by 07/11/2022. The documents may be provided via email, disc, hard copies, or a combination of the above. When using CERTREC, please send an email to the inspection team when the documents are uploaded.
- DO NOT forward any documents on flash/thumb drives, as current NRC policies and procedures prohibit using this type of media.
- It is preferable not ship Safeguards Information to the Region IV office. Inspectors can review these types of documents upon arrival at the site.
Attention: James Buchanan / Christopher Jewett U.S. Nuclear Regulatory Commission 1600 E. Lamar Blvd.
Arlington TX 76011-4125
- To keep the requested information organized, please submit electronic documents using the same number/lettering system as below.
- Any questions, please contact the assigned inspectors for the baseline inspections.
General Folder:
All Security Event Log entries since 06/20/2022.
Any open security related LERs.
Security Department Organizational Charts.
The corrective actions, procedure writing, and Safety and Security Interface procedures.
Current index of all security procedures and lesson plans.
A Word/Text file stating the date and revision of your current Physical Security Plan.
Rev.0
1-Security Training (71130.07):
A. Corrective Action summaries related to Security Training from 07/05/2020 to present.
Any summaries after 07/11/2022 need to be provided for review after the entrance meeting.
B. Provide any Security Training related policies, procedures, Instructions, desk-top guides, job aids, lesson plans, standing orders or any other type of lower tier document.
C. A current exhaustive list of all AROs, ASOs, SOs, and Security Trainers, and Watch persons. Include a break down by shift.
D. Any audits, program reviews, or self-assessments, etc. associated with the Security Training program since 07/05/2020.
E. All courses of fire for all weapons required to support your physical protection programs including any certifications of the courses of fire, and certifications of your firearms instructors.
F. Provide a list of equipment watch persons, armed security officers, armed responders, and alarm station operators are trained to use in order to perform their duties, the method and/or manner in which they are trained to use the equipment, and how the security officers demonstrate proficiency/qualification in the use of the equipment.
G. Provide a copy of your practical physical fitness test lesson plan and procedure along with how the test includes strenuous activity, physical exertion, levels of stress, and exposure to elements as they pertain to an individuals assigned security duties.
H. Provide at least one filled out actual example of the evaluation forms that you use for your OJT program (40hrs), your OJE program (individual officer certification), and your Tactical Course of Fire evaluation (individual officer). This can be the same officer for all examples.
I. Procedures or guidance documents use to certify the medical qualifications of security personnel needed to implement the protective strategy.
J. Provide all job performance measures (TPEs).
K. Provide a schedule of range activities during the inspection.
L. Be prepared to support a sample of officers running tactical course, timeline drill, and/or physical fitness test.
//--------------------- LAST ITEM FOR IP 71130.07 ---------------------//
Rev.0
- 2. Equipment Performance, Testing and Maintenance (71130.04):
A. Corrective Action summaries related to Security equipment performance, testing, and maintenance from 07/05/2020 to present. Any summaries after 07/11/2022 need to be provided for review after the entrance meeting.
B. Provide any Security and Maintenance Department Equipment Performance, Testing and Maintenance related policies, procedures, instructions, desk-top guides, job aids, lesson plans, standing orders or any other type of lower tier document for all equipment, devices or barriers that support your physical protection program.
C. Security related equipment operating procedures, instructions, etc. for all equipment being used by the security force (if these are contained within the procedures in B. you dont need to include them in this folder).
D. Provide any audits, program reviews, self-assessments, etc. associated with Equipment Performance, Testing and Maintenance.
E. Please have personnel available to perform general testing, to include but not limited to UPS testing where applicable along with appropriate personnel to open panels, remove microwave heads, card reader testing to include removal of covers, testing of power loss to receive various indicators to the operators at the alarm stations and that non-portable communication equipment remains functional. Provide documentation of your most recent testing regarding the above items.
F. For the time period listed in 2.A, provide a listing of all firearms maintenance/history activities, both in and out of service, i.e., semi-annual cleaning, firing, repairs, etc. Also, provide documentation that all firearms maintenance (beyond standard cleaning) repairs and modifications are performed by certified armorer(s), including Armorer Certificates for each weapon system used at the site.
G. Provide any procedures relating to storage, handling, transporting weapons within company property.
H. Provide documentation of your most recent security/emergency generator battery testing and the loads used during the testing.
I. Provide documentation regarding new equipment related to security, to include the analysis, acceptance testing, and vendor manuals.
J. Lighting Surveys conducted in the isolation zones and appropriate exterior areas within the protected area.
//--------------------- LAST ITEM FOR IP 71130.04 ---------------------//
Rev.0
Please be prepared to provide the following items during the inspection onsite:
- Contractor/vendor/manufacturer installation documentations, manuals, or special letters regarding any piece of equipment or device that supports your physical protection program.
- Any Compensatory Measures procedures that support your Physical Security Plan, to include walls or buildings that comprise any portion of your PA.
- Analysis conducted of areas where communication may be an issue and your methods to ensure continue communication and that there are no activities impeding alarm station operators, or any locations that any equipment can be over-ridden.
- Be prepared to provide records of testing and maintenance on any generator or other uninterruptable power source that supports your physical protection program. Including transfer of power testing that show IDS and Security Communication continued to function.
- Copies of specific I&C maintenance records if needed.
- Maintenance and testing schedule for IDS, Perimeter Cameras, Vital Areas, Special purpose detector equipment, weapons, etc.
Rev.0