Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22361A005 | 27 December 2022 | NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements | Safe Shutdown Operator Manual Action Emergency Lighting Fire Protection Program |
ML22321A266 | 16 November 2022 | January 2023 Emergency Preparedness Program Inspection - Request for Information | |
ML22307A137 | 2 November 2022 | August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information | Met Tower |
ML22249A255 | 29 June 2022 | Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 | Aging Management |
ML22165A088 | 14 June 2022 | Information Request, Security IR 2022403 | Job Performance Measure |
ML22166A322 | 14 June 2022 | August 2022 Emergency Preparedness Exercise Inspection - Request for Information | COVID-19 |
ML22055A114 | 23 February 2022 | NRR E-mail Capture - Request for Additional Information - Wolf Creek Request to Revise Diesel Generator Completion Time | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Tornado Generated Missile Seismically rugged |
ML22045A451 | 14 February 2022 | NRR E-mail Capture - Request for Additional Information - Wolf Creek Steam Generator Inspection Report 24th Refueling | |
ML22025A361 | 21 January 2022 | PI&R RFI Final | Temporary Modification Pandemic Coronavirus |
ML21327A260 | 23 November 2021 | NRR E-mail Capture - Request for Additional Information - Wolf Creek Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | Probabilistic Risk Assessment |
ML21271A195 | 28 September 2021 | E-mail 9-28-21 RFI for Wc EP Inspection Nov 2021 | Exemption Request |
ML21253A090 | 23 September 2021 | Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment and Regulatory Exemption for a Risk-Informed Approach to Address GSI-191 (EPIDs L-2021-LLA- 0152 and L-2021-LLE-0039) | Probabilistic Risk Assessment Exemption Request |
ML21221A128 | 5 August 2021 | NRR E-mail Capture - Urgent: Draft Request for Additional Information - Wolf Creek one-time Request for Exemption from the Biennial Emergency Preparedness Exercise | Exemption Request |
ML21132A103 | 12 May 2021 | Document Request List, Paperwork Reduction Act Statement | |
ML20302A478 | 28 October 2020 | OPC R1 Request for Information | Open Phase Condition Time Critical Operator Action |
ML20262A751 | 17 September 2020 | NRR E-mail Capture - Requests for Additional Information: Wolf Creek Amendment Request to Modify Technical Specification Surveillance Frequency Consistent with TSTF-425 | High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Earthquake |
ML20195A271 | 13 July 2020 | Generation Station - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2020012) and Request for Information | Safe Shutdown Fitness for Duty Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
ML20133J897 | 12 May 2020 | 12 May 2020 E-mail - RFI for NRC In-Office Inspection of Recent Wcngs Eplan_Eal Changes | |
ML20009E480 | 9 January 2020 | Relief Request to Utilize Code Case N-666-1 for Wolf Creek Generating Station - Request for Additional Information | Weld Overlay |
ML19346E605 | 4 November 2019 | Target Set Request for Information for Week of November 4, 2019 | |
ML19224A524 | 12 August 2019 | NRR E-mail Capture - Request for Additional Information - License Amendment Request to Revise Wolf Creek Generating Station Technical Specification 3.3.5 | |
ML18304A105 | 5 November 2018 | Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) | |
ML18282A640 | 9 October 2018 | NRR E-mail Capture - Request for Additional Information - Wolf Creek Generating Station License Amendment Request for Revision to the Emergency Plan | |
ML18270A094 | 4 October 2018 | Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses | |
ML18207A433 | 24 July 2018 | NRR E-mail Capture - (External_Sender) Draft Request for Additional Information Relief Request from ASME Code N-666-1 Alternate Repair of Essential Service Water Piping Wolf Creek Generating Station, Unit 1 EPID No.:L-2018-LLR-0101 | Weld Overlay |
ML18116A613 | 25 April 2018 | Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482/2018002) and Request for Information | Time Critical Operator Action |
ML17331A178 | 4 December 2017 | Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) | Unanalyzed Condition Probabilistic Risk Assessment Coatings Earthquake Fuel cladding |
ML17291A710 | 17 October 2017 | NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term | |
ML17265A014 | 21 September 2017 | NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses | Boric Acid |
ML17170A315 | 19 June 2017 | Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000482/2017008) and Request for Information | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Multiple Spurious Operation Emergency Lighting B.5.b Mitigating Strategies Maintenance Rule Program Fire Protection Program |
ML17166A038 | 14 June 2017 | NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term | Shutdown Margin |
ML17052A028 | 15 February 2017 | NRR E-mail Capture - Wolf Creek Generating Station - Official EAL RAIs | Ultimate heat sink |
ML16319A428 | 14 November 2016 | NRR E-mail Capture - Request for Additional Information (RAI) - Relief Requests 13R-14 and 13R-15 | Nondestructive Examination |
ML16300A266 | 21 October 2016 | Request for Additional Information - Relief Request I3R-13 Regarding Weld Examination Coverage | |
IR 05000482/2016002 | 3 August 2016 | NRC Integrated Inspection Report 05000482/2016002 | High Radiation Area Mission time Offsite Dose Calculation Manual Anticipated operational occurrence Functionality Assessment Significance Determination Process Pressure and Temperature Limits Report Process Control Program Operability Determination Fire Protection Program Overexposure |
ML16110A372 | 25 April 2016 | Request for Additional Information, License Amendment Request to Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding | |
ML16020A139 | 15 January 2016 | Notification of NRC Component Design Bases Inspection (05000482/2016007) and Initial Request for Information | Probabilistic Risk Assessment Temporary Modification |
ML15135A486 | 14 May 2015 | Wc 2015007 17T RFI | Commercial Grade Dedication |
ML15082A005 | 27 March 2015 | Request for Additional Information, Round 2, Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | |
ML15079A076 | 23 March 2015 | Request for Additional Information, Round 2, Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident | Fukushima Dai-Ichi |
ML15040A625 | 10 February 2015 | Request for Additional Information, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | |
ML14323A574 | 4 December 2014 | Request for Additional Information, License Amendment Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in USAR | Safe Shutdown Operator Manual Action Fire Protection Program |
ML14230A757 | 21 August 2014 | Request for Additional Information, Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval | Boric Acid VT-2 Pressure Boundary Leakage Through-Wall Leak |
ML14206A012 | 1 August 2014 | Request for Additional Information, Relief Requests I3R-08, RPV Interior Attachments and I3R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval | |
ML14197A336 | 25 July 2014 | Request for Additional Information, Relief Request I3R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220, Third 10-Year Inservice Inspection Interval | VT-2 Through-Wall Leak Through Wall Leak |
ML14148A387 | 2 June 2014 | Request for Additional Information Related to Flood Hazard Reevaluation Report for Recommendation 2.1 of the Near-Term Task Force Review of the Insights from the Fukushima Dai-Ichi Accident | Fukushima Dai-Ichi |
ML14111A100 | 30 April 2014 | Request for Additional Information, Nrr/Dss/Srxb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term | |
ML14083A400 | 3 April 2014 | Request for Additional Information, Nrr/Dra/Arcb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term | |
ML14058A088 | 5 March 2014 | Request for Additional Information, Nrr/De/Eeeb, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term | |
ML14027A162 | 28 January 2014 | Redacted, Request for Additional Information, Round 2, License Amendment Request to Approve Transition to Westinghouse Core Design and Safety Analysis and Adoption of Full Scope Alternate Source Term |