{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 August 31, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
-1257 August 31, 201 6 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016005 Dear Mr. Glove r: On August 10, 2016, the Nuclear Regulatory Commission (
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016 00 5 Dear Mr. Glove r: On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of H. B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 5 , through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
NRC) completed its mid-cycle performance review of H. B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRC
The NRC determined that overall, H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRC
Line 55: Line 54:


===Enclosure:===
===Enclosure:===
Robinson Inspection/Activity Plan (09/01/2016 - 06/30/2018)
Robinson Inspection/Activity Plan (0 9/0 1/2016 - 06/30/2018)
cc Distribution via ListServ
cc Distribution via ListServ


Line 65: Line 64:
: D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
: D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)


Page 1 of 2 08/31/2016 06:58:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteRobinsonInspection / Activity Plan 09/01/2016
Page 1 of 2 08/31/2016 06:58:42 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 09/01/2016
-06/30/2018ASM EP-2016 EP ASM & RES BASELINE 3 2 IPDrill Evaluation711140601/01/2016 12/31/2016OL RQ-REQUAL INSPECTION 2 2 IPLicensed Operator Requalification Program7111111B01/16/2017 01/20/2017 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IPInservice Inspection Activities - PWR7111108P03/06/2017 03/10/2017 RP-RAD HAZARDS 1 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/2017 03/10/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P03/13/2017 03/17/2017 EP-EP EXERCISE 6 2 IPExercise Evaluation711140105/08/2017 05/12/2017 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/2017 05/12/2017 2 IPExercise Evaluation - Scenario Review711140805/08/2017 05/12/2017 2 IPPerformance Indicator Verification7115105/08/2017 05/12/2017 RP-RP OCCUPATIONAL INSPECTION 3 2 IPOccupational ALARA Planning and Controls71124.0206/19/2017 06/23/2017 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/19/2017 06/23/2017 2 IPOccupational Dose Assessment71124.0406/19/2017 06/23/2017 2 IPRadiation Monitoring Instrumentation71124.0506/19/2017 06/23/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V2350008/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V2350009/25/2017 10/06/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 5 2 IPFire Protection [Triennial]7111105T11/27/2017 12/01/2017 2 IPFire Protection [Triennial]7111105T12/11/2017 12/15/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 2 IPProblem Identification and Resolution71152B03/05/2018 03/09/2018 2 IPProblem Identification and Resolution7115203/19/2018 03/23/2018 EP-EP PROGRAM INSPECTION 3 2 IPAlert and Notification System Testing711140203/12/2018 03/16/2018 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/12/2018 03/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2018ASM EP-2016 EP ASM & RES BASELINE 3 2 IP Drill Evaluation7111406 01/01/2016 12/31/2016OL RQ-REQUAL INSPECTION 2 2 IP Licensed Operator Requalification Program7111111B 01/16/2017 01/20/2017 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 03/06/2017 03/10/2017 RP-RAD HAZARDS 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/06/2017 03/10/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/13/2017 03/17/2017 EP-EP EXERCISE 6 2 IP Exercise Evaluation7111401 05/08/2017 05/12/2017 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/08/2017 05/12/2017 2 IP Exercise Evaluation - Scenario Review7111408 05/08/2017 05/12/2017 2 IP Performance Indicator Verification71151 05/08/2017 05/12/2017 RP-RP OCCUPATIONAL INSPECTION 3 2 IP Occupational ALARA Planning and Controls71124.02 06/19/2017 06/23/2017 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 06/19/2017 06/23/2017 2 IP Occupational Dose Assessment71124.04 06/19/2017 06/23/2017 2 IP Radiation Monitoring Instrumentation71124.05 06/19/2017 06/23/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 09/25/2017 10/06/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 5 2 IP Fire Protection [Triennial]7111105T11/27/2017 12/01/2017 2 IP Fire Protection [Triennial]7111105T12/11/2017 12/15/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 2 IP Problem Identification and Resolution71152B 03/05/2018 03/09/2018 2 IP Problem Identification and Resolution71152 03/19/2018 03/23/2018 EP-EP PROGRAM INSPECTION 3 2 IP A lert and Notification System Testing7111402 03/12/2018 03/16/2018 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/12/2018 03/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 08/31/2016 06:58:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteRobinsonInspection / Activity Plan 09/01/2016
Page 2 of 2 08/31/2016 06:58:42 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 09/01/2016
-06/30/2018 EP-EP PROGRAM INSPECTION 3 2 IPEmergency Action Level and Emergency Plan Changes711140403/12/2018 03/16/2018 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/12/2018 03/16/2018 2 IPPerformance Indicator Verification7115103/12/2018 03/16/2018 RP-RP PUBLIC INSPECTION 2 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/11/2018 06/15/2018 2 IPRadiological Environmental Monitoring Program71124.0706/11/2018 06/15/2018 2 IPOccupational Exposure Control Effectiveness71151-OR0106/11/2018 06/15/2018 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0106/11/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 2 IPHeat Sink Performance7111107T06/18/2018 06/22/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2018 EP-EP PROGRAM INSPECTION 3 2 IP Emergency Action Level and Emergency Plan Changes7111404 03/12/2018 03/16/2018 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/12/2018 03/16/2018 2 IP Performance Indicator Verification71151 03/12/2018 03/16/2018 RP-RP PUBLIC INSPECTION 2 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0606/11/2018 06/15/2018 2 IP Radiological Environmental Monitoring Program71124.0706/11/2018 06/15/2018 2 IP Occupational Exposure Control Effectiveness71151-OR0106/11/2018 06/15/2018 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0106/11/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 2 IP Heat Sink Performance7111107T 06/18/2018 06/22/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 05:23, 8 July 2018

Mid-Cycle Assessment Letter for H.B Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016005
ML16244A108
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/31/2016
From: Hopper G T
Division Reactor Projects III
To: Glover R M
Duke Energy Corp
References
IR 2016005
Download: ML16244A108 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 31, 201 6 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016 00 5 Dear Mr. Glove r: On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of H. B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 5 , through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence. The NRC staff completed Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans" at H. B. Robinson Steam Electric Plant on April 15, 2016, to confirm full implementation of Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."

R. Glover 2 The results of the inspection can be found in inspection report 05000261/2016009

.

In Staff Requirements Memorandum

- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you have regarding this letter.

Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.:

50-261 License Nos.:

DPR-23

Enclosure:

Robinson Inspection/Activity Plan (0 9/0 1/2016 - 06/30/2018)

cc Distribution via ListServ

_________

___ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/24/2016 8/25/2016 8/25/2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO R. Glover 3 Letter to Richard Michael Glover from George T. Hopper dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/201 6005 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 2 08/31/2016 06:58:42 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 09/01/2016

-06/30/2018ASM EP-2016 EP ASM & RES BASELINE 3 2 IP Drill Evaluation7111406 01/01/2016 12/31/2016OL RQ-REQUAL INSPECTION 2 2 IP Licensed Operator Requalification Program7111111B 01/16/2017 01/20/2017 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 03/06/2017 03/10/2017 RP-RAD HAZARDS 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/06/2017 03/10/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/13/2017 03/17/2017 EP-EP EXERCISE 6 2 IP Exercise Evaluation7111401 05/08/2017 05/12/2017 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/08/2017 05/12/2017 2 IP Exercise Evaluation - Scenario Review7111408 05/08/2017 05/12/2017 2 IP Performance Indicator Verification71151 05/08/2017 05/12/2017 RP-RP OCCUPATIONAL INSPECTION 3 2 IP Occupational ALARA Planning and Controls71124.02 06/19/2017 06/23/2017 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 06/19/2017 06/23/2017 2 IP Occupational Dose Assessment71124.04 06/19/2017 06/23/2017 2 IP Radiation Monitoring Instrumentation71124.05 06/19/2017 06/23/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM 3 2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 09/25/2017 10/06/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 5 2 IP Fire Protection [Triennial]7111105T11/27/2017 12/01/2017 2 IP Fire Protection [Triennial]7111105T12/11/2017 12/15/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 2 IP Problem Identification and Resolution71152B 03/05/2018 03/09/2018 2 IP Problem Identification and Resolution71152 03/19/2018 03/23/2018 EP-EP PROGRAM INSPECTION 3 2 IP A lert and Notification System Testing7111402 03/12/2018 03/16/2018 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/12/2018 03/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/31/2016 06:58:42 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site RobinsonInspection / Activity Plan 09/01/2016

-06/30/2018 EP-EP PROGRAM INSPECTION 3 2 IP Emergency Action Level and Emergency Plan Changes7111404 03/12/2018 03/16/2018 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/12/2018 03/16/2018 2 IP Performance Indicator Verification71151 03/12/2018 03/16/2018 RP-RP PUBLIC INSPECTION 2 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0606/11/2018 06/15/2018 2 IP Radiological Environmental Monitoring Program71124.0706/11/2018 06/15/2018 2 IP Occupational Exposure Control Effectiveness71151-OR0106/11/2018 06/15/2018 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0106/11/2018 06/15/2018 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 2 IP Heat Sink Performance7111107T 06/18/2018 06/22/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.