March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2015006
Dear Mr. Glover:
On February 10, 2016, the NRC completed its end-of-cycle performance review of H.B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event.
The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for H.B. Robinson, Unit 2, and the information gathered will aid staff in development of the safety evaluation for the site. The NRC staff has received the final compliance letter for the site. Once the final safety evaluation is issued, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191: Inspection of the Licensees Responses to Mitigation Strategies Order EA-12-049, Spent Fuel Pool Instrumentation Order EA-12-051 and Emergency Preparedness Information requested by NRC in March 12, 2012.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4645 with any questions you have regarding this letter.
Sincerely,
/RA/
George T. Hopper, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-261 License Nos.: DPR-23
Enclosure:
Robinson Inspection/Activity Plan
(3/1/2016 - 12/31/2017)
cc Distribution via ListServ
_______________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP
SIGNATURE DXW4 JSD GTH
NAME D. Jackson J. Dodson G. Hopper
DATE 2/24/2016 2/25/2016 2/29/2016
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2015006
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
Page 1 of 2 03/02/2016 08:09:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 03/01/2016 - 12/31/2017 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
2 IP Problem Identification and Resolution 71152B 03/07/2016 03/11/2016
IP Problem Identification and Resolution 71152B 03/21/2016 03/25/2016 ASM EP
2 IP Drill Evaluation 7111406 01/01/2016 12/31/2016 TI-191
- MITIGATING STRATEGIES
2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 04/11/2016 04/15/2016 EP
- EP PROGRAM INSPECTION
2 IP Alert and Notification System Testing 7111402 06/20/2016 06/24/2016
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/20/2016 06/24/2016
IP Emergency Action Level and Emergency Plan Changes 7111404 06/20/2016 06/24/2016
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/20/2016 06/24/2016
IP Performance Indicator Verification 71151 06/20/2016 06/24/2016 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/27/2016 07/01/2016
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/27/2016 07/01/2016 CDBI
- COMPONENT DESIGN BASES INSPECTION
2 IP Component Design Bases Inspection 7111121 06/27/2016 07/01/2016
IP Component Design Bases Inspection 7111121 07/18/2016 07/22/2016
IP Component Design Bases Inspection 7111121 08/01/2016 08/05/2016
IP Component Design Bases Inspection 7111121 08/15/2016 08/19/2016 ISI
- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM
2 IP Inservice Inspection Activities - PWR 7111108P 02/20/2017 02/24/2017 RP
- RAD HAZARDS
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2017 03/03/2017 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 02/27/2017 03/03/2017 OL RQ
- REQUAL INSPECTION
2 IP Licensed Operator Requalification Program 7111111B 03/06/2017 03/10/2017 EP
- EP EXERCISE
2 IP Exercise Evaluation 7111401 05/08/2017 05/12/2017
IP Emergency Action Level and Emergency Plan Changes 7111404 05/08/2017 05/12/2017
IP Exercise Evaluation - Scenario Review 7111408 05/08/2017 05/12/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 03/02/2016 08:09:06 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 03/01/2016 - 12/31/2017 EP
- EP EXERCISE
2 IP Performance Indicator Verification 71151 05/08/2017 05/12/2017 RP
- RP OCCUPATIONAL INSPECTION
2 IP Occupational ALARA Planning and Controls 71124.02 06/19/2017 06/23/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/19/2017 06/23/2017
IP Occupational Dose Assessment 71124.04 06/19/2017 06/23/2017
IP Radiation Monitoring Instrumentation 71124.05 06/19/2017 06/23/2017 OL EXAM
- INITIAL LICENSE EXAM PREP
2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 08/28/2017 09/01/2017 OL EXAM
- INITIAL LICENSE EXAM
2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 09/25/2017 10/06/2017 TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION
2 IP Fire Protection [Triennial]
7111105T 11/27/2017 12/01/2017
IP Fire Protection [Triennial]
7111105T 12/11/2017 12/15/2017 This report does not include INPO and OUTAGE activities.