August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016005

Dear Mr. Glover:

On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of H. B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC staff completed Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans at H. B. Robinson Steam Electric Plant on April 15, 2016, to confirm full implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The results of the inspection can be found in inspection report 05000261/2016009.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you have regarding this letter.

Sincerely,

/RA/

George T. Hopper, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-261 License Nos.: DPR-23

Enclosure:

Robinson Inspection/Activity Plan (09/01/2016 - 06/30/2018)

cc Distribution via ListServ

____________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP

SIGNATURE DXW4 JSD GTH

NAME DJackson JDodson GHopper

DATE 8/24/2016 8/25/2016 8/25/2016

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016005

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 2 08/31/2016 06:58:42 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 09/01/2016 - 06/30/2018 ASM EP

- 2016 EP ASM & RES BASELINE

2 IP Drill Evaluation 7111406 01/01/2016 12/31/2016 OL RQ

- REQUAL INSPECTION

2 IP Licensed Operator Requalification Program 7111111B 01/16/2017 01/20/2017 ISI

- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM

2 IP Inservice Inspection Activities - PWR 7111108P 03/06/2017 03/10/2017 RP

- RAD HAZARDS

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/06/2017 03/10/2017 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/13/2017 03/17/2017 EP

- EP EXERCISE

2 IP Exercise Evaluation 7111401 05/08/2017 05/12/2017

IP Emergency Action Level and Emergency Plan Changes 7111404 05/08/2017 05/12/2017

IP Exercise Evaluation - Scenario Review 7111408 05/08/2017 05/12/2017

IP Performance Indicator Verification 71151 05/08/2017 05/12/2017 RP

- RP OCCUPATIONAL INSPECTION

2 IP Occupational ALARA Planning and Controls 71124.02 06/19/2017 06/23/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/19/2017 06/23/2017

IP Occupational Dose Assessment 71124.04 06/19/2017 06/23/2017

IP Radiation Monitoring Instrumentation 71124.05 06/19/2017 06/23/2017 OL EXAM

- INITIAL LICENSE EXAM PREP

2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 08/28/2017 09/01/2017 OL EXAM

- INITIAL LICENSE EXAM

2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 09/25/2017 10/06/2017 TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION

2 IP Fire Protection [Triennial]

7111105T 11/27/2017 12/01/2017

IP Fire Protection [Triennial]

7111105T 12/11/2017 12/15/2017 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

2 IP Problem Identification and Resolution 71152B 03/05/2018 03/09/2018

IP Problem Identification and Resolution 71152 03/19/2018 03/23/2018 EP

- EP PROGRAM INSPECTION

2 IP Alert and Notification System Testing 7111402 03/12/2018 03/16/2018

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/12/2018 03/16/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 08/31/2016 06:58:42 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 09/01/2016 - 06/30/2018 EP

- EP PROGRAM INSPECTION

2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/12/2018 03/16/2018

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/12/2018 03/16/2018

IP Performance Indicator Verification 71151 03/12/2018 03/16/2018 RP

- RP PUBLIC INSPECTION

2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/11/2018 06/15/2018

IP Radiological Environmental Monitoring Program 71124.07 06/11/2018 06/15/2018

IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2018 06/15/2018

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/11/2018 06/15/2018 HS

- TRIENNIAL HEAT SINK PERFORMANCE

2 IP Heat Sink Performance 7111107T 06/18/2018 06/22/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.