UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2013 Mr. William R. Gideon Vice President Carolina Power and Light Company H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550
SUBJECT:
MID CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 (NRC INSPECTION REPORT 05000261/2013006)
Dear Mr. Gideon:
On August 14, 2013, the NRC staff completed its mid-cycle performance review of the H. B.
Robinson Steam Electric Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Robinson Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of the Apparent Violation (AV)05000261/2013008-01, Failure to Perform Adequate Preventative Maintenance on the Dedicated Shutdown Diesel Generator In accordance with Vendor Guidelines. The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end of cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
W. Gideon 2
We also plan on conducting several infrequently performed inspections which include: Initial Operator Licensing Examinations; and 2515/TI-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping, Phase 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4645 with any questions you may have regarding this letter.
Sincerely,
/RA/
George T. Hopper, Chief Division of Reactor Projects Docket No.: 50-261, Docket No. 72-3 License No.: DPR-23, License No. SNM-2502
Enclosure:
Robinson Inspection/Activity Plan (09/01/2013 - 12/31/2014) cc: Distribution via Listserv
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE JSD /RA/
GTH /RA/
NAME JDodson GHopper DATE 08/23/2013 08/29/2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
W. Gideon 3
Letter to William R. Gideon from George Hopper dated September 3, 2013
SUBJECT:
MID CYCLE ASSESSMENT LETTER FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 (NRC INSPECTION REPORT 05000261/2013006)
DISTRIBUTION:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource Institute of Nuclear Power Operations (INPO)
ROP Reports
Robinson Inspection / Activity Plan 09/01/2013 - 12/31/2014 Unit Number Page 1 of 1 09/03/2013 08:07:33 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1
- UNIT 2 INSERVICE INSPECTION 2
09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR 1
SGISI
- UNIT 2 SG INSERVICE INSPECTION 2
09/30/2013 10/04/2013 IP 7111108P Inservice Inspection Activities - PWR 2
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 2
10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2
10/07/2013 10/11/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2
10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification 1
- EP PROGRAM INSPECTION 2
06/23/2014 06/27/2014 IP 7111402 Alert and Notification System Testing 2
06/23/2014 06/27/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2
06/23/2014 06/27/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2
06/23/2014 06/27/2014 IP 71151 Performance Indicator Verification 2
OL EXAM
- INITIAL LICENSE EXAM PREP 2
07/21/2014 07/25/2014 V23430 ROBINSON/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES 4
- RP PUBLIC RADIATON SAFETY BASELINE 2
07/21/2014 07/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2
07/21/2014 07/25/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2
07/21/2014 07/25/2014 IP 71124.07 Radiological Environmental Monitoring Program 2
07/21/2014 07/25/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2
07/21/2014 07/25/2014 IP 71151 Performance Indicator Verification 2
OL EXAM
- INITIAL LICENSE EXAM WEEK 1 2
08/18/2014 08/22/2014 V23430 ROBINSON/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES 2
OL EXAM
- INITIAL LICENSE EXAM WEEK 2 2
08/25/2014 08/29/2014 V23430 ROBINSON/AUGUST 2014 INITIAL EXAM AT POWER FACILITIES 4
TFPI
- TRIENNIEL FIRE PROTECTION INSP 2
10/20/2014 10/24/2014 IP 7111105T Fire Protection [Triennial]
2 11/03/2014 11/07/2014 IP 7111105T Fire Protection [Triennial]
Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.