MONTHYEARML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson ML24079A3062024-03-19019 March 2024 NRR E-mail Capture - Acceptance Review Results for Robinson - Proposed Relief Request RA-23-0300 ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23262B4502023-09-19019 September 2023 NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology ML23220A2342023-08-0808 August 2023 NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22285A1552022-10-12012 October 2022 NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22146A3652022-05-25025 May 2022 Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A3662022-01-12012 January 2022 Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections ML22005A0872022-01-0505 January 2022 Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 ML21286A6612021-10-13013 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21119A2272021-04-29029 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-9, EPID: L-2021-LLR-0024 ML21116A2592021-04-26026 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-8, EPID: L-2021-LLR-0023 ML21116A2582021-04-26026 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-3, EPID: L-2021-LLR-0020 ML21113A1312021-04-23023 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-5, EPID: L-2021-LLR-0021 ML21110A1462021-04-20020 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results: IST-RR-7, EPID: L-2021-LLR-0022 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20353A1302020-12-18018 December 2020 2021 Hbr 50.59 Info Request - E-mail Request- Upcoming 50.59 Inspection (IP71111.17T)- Week of March 1-5, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20063M1942020-02-21021 February 2020 NRR E-mail Capture - Accepted for Review - Robinson Unit 2 One-Time Pressure Relief Valve Test Frequency Extension EPID: L-2020-LLR-0019 ML20085F9312020-02-20020 February 2020 SPRA - Spr Audit Questions - 2nd Batch ML20049A0342020-02-16016 February 2020 NRR E-mail Capture - Accepted for Review - Robinson Unit 2 to Correct Administrative Renewed Facility Operating License Error in the 50.69 LAR EPID: L-2020-LLL-0000 ML20063L4562020-02-0404 February 2020 NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 ML20087N6632020-02-0303 February 2020 SPRA - Spr Audit Questions Redacted ML20027C2042020-01-27027 January 2020 Audit Documents Needed for the Robinson Seismic Probabilistic Risk Assessment Review - FLEX and HRA References ML20015A1892020-01-13013 January 2020 Audit Documents Needed for the Robinson SPRA Review - Fragility Analysis ML20009C0922020-01-0808 January 2020 Audit Documents Needed for the Robinson SPRA Review - Seismic Hazard Analysis ML19365A0482019-12-30030 December 2019 Request for Eportal Access for Audit Review of the Robinson SPRA Supporting Documents ML19365A0462019-12-18018 December 2019 Audit Documents Needed for the Robinson SPRA Review 2024-06-24
[Table view] Category:Inspection Plan
MONTHYEARIR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24047A0162024-02-15015 February 2024 2024 Rpn - CGD Inspection Information Request ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 ML20191A2192020-07-0909 July 2020 Notification of Conduct of a Fire Protection Team Baseline Inspection U.S. Nuclear Regulatory Commission Inspection Report No. 05000261/2020012 ML19347D1072019-12-13013 December 2019 Plan - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20190052019-08-28028 August 2019 Updated Inspection Plan for H.B. Robinson Steam Electric Plant, Unit 2 - (Report 05000261/2019005) ML19232A4172019-08-20020 August 2019 Radiation Safety Baseline Inspection RFI 2019-004 IR 05000261/20180062019-03-0404 March 2019 Annual Assessment Letter for H. B. Robinson Steam Electric Plant, Unit 2 - Report 05000261/2018006, Report 05000261/2018402, Report 05000261/2018501 IR 05000261/20180052018-08-23023 August 2018 Updated Inspection Plan for H.B. Robinson Steam Electric Plant Unit 2 (Inspection Report 05000261/2018005) ML18215A1352018-08-0303 August 2018 U2 Baseline In-Service Inspection 2018003 Public ML18172A1142018-06-20020 June 2018 Radiation Safety Baseline Inspection Emailed Initial Information Request 2018003 ML18115A0512018-04-25025 April 2018 RP Inspect Info & Doc Request IR 05000261/20170062018-02-28028 February 2018 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261/2017006, Report 05000261/2017402, Report 05000261/2017501 IR 05000261/20170052017-08-28028 August 2017 Updated Inspection Plan for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2017005 IR 05000261/20160062017-03-0101 March 2017 Annual Assessment Letter for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016006 ML17021A0042017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000261/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for H.B Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016005 ML16092A2002016-03-29029 March 2016 Notification of H.B. Robinson Steam Electric Plant - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000261/2016008 IR 05000261/20150062016-03-0202 March 2016 Annual Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015006 IR 05000261/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015005 IR 05000261/20140012015-03-0404 March 2015 Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 ML14245A1732014-09-0202 September 2014 Mid-Cycle Ltr 2014 ML14063A1832014-03-0404 March 2014 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant ML13246A0682013-09-0303 September 2013 Mid Cycle Assessment Letter ML13224A3172013-08-12012 August 2013 Notification of Inspection and Request for Information ML13085A1272013-03-26026 March 2013 Notification of Inspection and Request for Information IR 05000261/20120012013-03-0404 March 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) ML12248A1642012-09-0404 September 2012 Mid Cycle Assessment Letter Robinson 2012 ML12209A3772012-07-27027 July 2012 IR 05000261-12-008, on 01/01/2012, H.B. Robinson Steam Electric Plant-Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206504242012-03-0505 March 2012 End of Cycle Assessment Report 22 IR 05000261/20110012011-03-0404 March 2011 Annual Assessment Letter (Report 05000261/2011001) ML1024405952010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan ML1006209802010-03-0303 March 2010 Report 22 - 2010001 Inspection/Activity Plan ML0924405542009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 RNP-RA/09-0067, Nickel-Alloy Nozzles and Penetrations Program Inspection Plan2009-07-29029 July 2009 Nickel-Alloy Nozzles and Penetrations Program Inspection Plan ML0824610022008-09-0202 September 2008 Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22 IR 05000261/20080012008-03-0303 March 2008 Annual Assessment Letter (IR 05000261-08-001) ML0724306772007-08-31031 August 2007 Mid-Cycle 2007 Report ML0724702262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - H.B. Robinson Steam Electric Plant Unit 2 ML0706001892007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 - Report 22 2024-08-22
[Table view] |
Text
ML21295A299 From: Nielsen, Adam To: Bardauskas, Tomas Cc: Pursley, William
Subject:
Robinson 2021-04 RP Inspection Document Request Date: Friday, October 22, 2021 9:56:00 AM Attachments: ROB_2021-04_RP_doc_request.pdf Our document request is attached. Please distribute it to the appropriate site people.
We would like the documents available to us by November 22nd if possible. I think this is a little earlier than we had discussed on the phone, but I may be on the road the week of November 29, so Id like to have them available prior to that. If this causes a problem, let me know and we can work it out.
Please dont hesitate to call/email me if you have any questions.
- Thanks, Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660
Robinson Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2021004 During the week of December 6 - 10, 2021, the NRC will perform a baseline Radiation Safety Inspection at the Robinson Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, and 71151).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than November 22, 2021.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Inspection Dates: December 6 - 10, 2021 Documents Due to Region II: November 22, 2021 Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls IP 71151 Performance Indicator Verification (Occupational Cornerstone Only)
Lead Inspector: Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660 Adam.Nielsen@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Miscellaneous
- 1. List of primary contacts for each inspection area w/phone numbers
- 2. Corrective action program procedure(s) 71124.01 - Radiological Hazard Assessment and Exposure Controls
- 1. Procedures related to RP controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel movement, hot spots, etc.)
- 2. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm followup, etc.)
- 3. List of all non-fuel items stored in spent fuel pool
- 4. Most recent self-assessment or audit covering RP controls
- 5. List of CRs related to RP controls (e.g. radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since November 21, 2020.
71124.02 - Occupational ALARA Planning and Controls
- 1. All procedures related to ALARA (e.g. temporary shielding, ALARA planning, source term reduction, etc.)
- 2. All ALARA planning packages that required Plant ALARA Committee approval for work performed during the October-November 2021 forced outage, as applicable.
- 3. Completed ALARA packages for the top 5 dose jobs from the previous refueling outage (Fall 2020), including dose estimates, work hour estimates, special RP controls, dose reduction initiatives, ALARA results, lessons learned, etc)
- 4. Outage ALARA Report for the last refueling outage (Fall 2020).
- 5. ALARA source term trending point data for last two refueling outages
- 6. Source term reduction strategic plan, if available.
- 7. Minutes from the last 4 Plant ALARA Committee Meetings
- 8. Most recent self-assessment or audit of ALARA program.
- 9. List of CRs related to ALARA since September 29, 2018.
71151 - Performance Indicator Verification (Occupational Cornerstone Only)
- 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data.
- 2. List of electronic dosimeter alarms since November 21, 2020 (dose and dose rate)