Updated Inspection Plan for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2017005
ML17240A298
Person / Time
Site: Robinson 
Issue date: 08/28/2017
From: Steven Rose
NRC/RGN-II/DRP/RPB4
To: Kapopoulos E
Duke Energy Progress
References
IR 2017005
Download: ML17240A298 (5)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2017005

Dear Mr. Kapopoulos:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for H. B. Robinson Steam Electric Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-261 License Nos.: DPR-23

Enclosure:

Robinson Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2017005 August 28, 2017

DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RIDSNrrPMRobinson Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML OFFICE RII: DRP RII: DRP RII: DRP

NAME DJackson JDodson SRose

DATE 8/15/2017 8/15/2017 8/28/2017

OFFICIAL AGENCY RECORD 17240A298

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/23/2017 14:09:45 ASM EP

- 2017 EP ASM & RES BASELINE

2 IP Drill Evaluation 7111406 01/01/2017 12/31/2017 OL EXAM

- INITIAL LICENSE EXAM PREP

2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 08/28/2017 09/01/2017 EQI

- DESIGN BASES ASSURANCE INSPECTION (PROGR

2 IP Design Bases Assurance Inspection (Programs)

7111121N 09/11/2017 09/15/2017

IP Design Bases Assurance Inspection (Programs)

7111121N 10/02/2017 10/06/2017

IP Design Bases Assurance Inspection (Programs)

7111121N 10/16/2017 10/20/2017 OL EXAM

- INITIAL LICENSE EXAM

2 ROBINSON/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23500 09/25/2017 10/06/2017 TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION

2 IP Fire Protection [Triennial]

7111105T 11/27/2017 12/01/2017

IP Fire Protection [Triennial]

7111105T 12/11/2017 12/15/2017 MODS

- PERMENANT PLANT MODIFICATION

2 IP Evaluations of Changes, Tests, and Experiments 7111117T 02/26/2018 03/02/2018 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

2 IP Problem Identification and Resolution 71152B 03/05/2018 03/09/2018

IP Problem Identification and Resolution 71152 03/19/2018 03/23/2018 EP

- EP PROGRAM INSPECTION

2 IP Alert and Notification System Testing 7111402 03/12/2018 03/16/2018

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/12/2018 03/16/2018

IP Emergency Action Level and Emergency Plan Changes 7111404 03/12/2018 03/16/2018

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/12/2018 03/16/2018

IP Performance Indicator Verification 71151 03/12/2018 03/16/2018 RP

- RP PUBLIC INSPECTION

2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/11/2018 06/15/2018

IP Radiological Environmental Monitoring Program 71124.07 06/11/2018 06/15/2018

IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2018 06/15/2018

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/11/2018 06/15/2018 HS

- TRIENNIAL HEAT SINK PERFORMANCE

2 IP Heat Sink Performance 7111107T 06/18/2018 06/22/2018 ISI

- UNIT 2 IN-SERVICE INSPECTION & RVH EXAM

2 IP Inservice Inspection Activities - PWR 7111108P 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/23/2017 14:09:45 RP

- RAD HAZARD AND TRANSPORTATION

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2018 09/28/2018

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/24/2018 09/28/2018 LR

- POST-APPROVAL LR PHASE 4

2 IP Post-Approval Site Inspection for License Renewal 71003 12/03/2018 12/07/2018 DBAI

- DESIGN BASES ASSURANCE INSPECTION (TEAMS

2 IP Design Bases Assurance Inspection (Teams)

7111121M 04/08/2019 04/12/2019

IP Design Bases Assurance Inspection (Teams)

7111121M 04/29/2019 05/03/2019

IP Design Bases Assurance Inspection (Teams)

7111121M 05/13/2019 05/17/2019 EP

- EP EXERCISE INSPECTION

2 IP Exercise Evaluation 7111401 05/20/2019 05/24/2019

IP Emergency Action Level and Emergency Plan Changes 7111404 05/20/2019 05/24/2019

IP Exercise Evaluation - Scenario Review 7111408 05/20/2019 05/24/2019

IP Performance Indicator Verification 71151 05/20/2019 05/24/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.