ML100620980

From kanterella
Jump to navigation Jump to search
Report 22 - 2010001 Inspection/Activity Plan
ML100620980
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Carolina Power & Light Co
Shared Package
ML100620954 List:
References
IR-10-001
Download: ML100620980 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/03/2010 07:02:24 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson TFPI 805

- TRIENNIAL FIRE PROTECTION 7

2 IP Fire Protection [Triennial]

7111105T 03/15/2010 03/19/2010 2

IP Fire Protection [Triennial]

7111105T 03/29/2010 04/02/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK1 2

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/19/2010 04/23/2010 2

IP Occupational ALARA Planning and Controls 71124.02 04/19/2010 04/23/2010 2

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/19/2010 04/23/2010 2

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/19/2010 04/23/2010 2

IP Performance Indicator Verification 71151 04/19/2010 04/23/2010 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 EB3TI172

- EB3 RCS DM BUTT WELDS 1

2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/26/2010 04/30/2010 EB3SGISI

- EB3 SG INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 05/03/2010 05/07/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 3

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/10/2010 05/14/2010 2

IP Occupational ALARA Planning and Controls 71124.02 05/10/2010 05/14/2010 2

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/10/2010 05/14/2010 2

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 05/10/2010 05/14/2010 2

IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

2 IP Alert and Notification System Evaluation 7111402 05/24/2010 05/28/2010 2

IP Emergency Response Organization Augmentation Testing 7111403 05/24/2010 05/28/2010 2

IP Emergency Action Level and Emergency Plan Changes 7111404 05/24/2010 05/28/2010 2

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/24/2010 05/28/2010 2

IP Performance Indicator Verification 71151 05/24/2010 05/28/2010 PSB1-RP

- RP GROUND WATER PROTECTION 1

2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 7

2 IP Identification and Resolution of Problems 71152B 07/12/2010 07/16/2010 2

IP Identification and Resolution of Problems 71152B 07/26/2010 07/30/2010 EB1

- COMPONENT DESIGN BASES INSPECTION 6

2 IP Component Design Bases Inspection 7111121 08/16/2010 08/20/2010 2

IP Component Design Bases Inspection 7111121 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 03/03/2010 07:02:24 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson EB1

- COMPONENT DESIGN BASES INSPECTION 6

2 IP Component Design Bases Inspection 7111121 09/13/2010 09/17/2010 2

IP Component Design Bases Inspection 7111121 09/27/2010 10/01/2010 PSB1-RP

- RP PUBLIC RADIAITON SAFETY INSP 3

2 IP Occupational Dose Assessment 71124.04 01/17/2011 01/21/2011 2

IP Radiation Monitoring Instrumentation 71124.05 01/17/2011 01/21/2011 2

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/17/2011 01/21/2011 2

IP Public Radiation Safety 71124.07 01/17/2011 01/21/2011 2

IP Performance Indicator Verification 71151 01/17/2011 01/21/2011 INSP

- MODS/50.59 INSP 2

2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/24/2011 01/28/2011 2

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 02/07/2011 02/11/2011 OL EXAM

- INITIAL EXAM PREP 3

2 ROBINSON/FEBRUARY 2011 EXAM AT POWER FACILITIES V23346 02/07/2011 02/11/2011 OL EXAM

- INITIAL EXAM - WEEK 1 3

2 ROBINSON/FEBRUARY 2011 EXAM AT POWER FACILITIES V23346 02/28/2011 03/04/2011 OL EXAM

- INITIAL EXAM - WEEK 2 3

2 ROBINSON/FEBRUARY 2011 EXAM AT POWER FACILITIES V23346 03/14/2011 03/25/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 4

2 IP Exercise Evaluation 7111401 05/23/2011 05/27/2011 2

IP Emergency Action Level and Emergency Plan Changes 7111404 05/23/2011 05/27/2011 2

IP Drill/Exercise Performance 71151-EP01 05/23/2011 05/27/2011 2

IP ERO Drill Participation 71151-EP02 05/23/2011 05/27/2011 2

IP Alert & Notification System 71151-EP03 05/23/2011 05/27/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure