IR 05000261/2020420
| ML20289A644 | |
| Person / Time | |
|---|---|
| Site: | Robinson (DPR-023) |
| Issue date: | 10/14/2020 |
| From: | Dante Johnson Security Performance Evaluation Branch |
| To: | Kapopoulos E Duke Energy Progress |
| Berry J | |
| Shared Package | |
| ML20289A635 | List: |
| References | |
| IR 2020420 | |
| Download: ML20289A644 (4) | |
Text
Enclosure U.S. NUCLEAR REGULATORY COMMISSION (NRC)
OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE (NSIR)
INSPECTION REPORT
Docket Number:
05000261
License Number:
Report Number:
Enterprise Identifier: I-2020-420-0005
Licensee:
Duke Energy Progress, LLC
Facility:
H. B. Robinson Steam Electric Plant
Location:
Hartsville, South Carolina
Inspection Dates:
September 21, 2020, to September 24, 2020
Inspectors:
J. Berry, Team Leader
E. Byre, Senior Physical Security Inspector
P. Coughlin, Senior Physical Security Inspector
J. Wallo, Senior Physical Security Inspector
Approved By:
Danté C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations
SUMMARY
The NRC continued monitoring the licensees performance by conducting a security inspection at H. B. Robinson Steam Electric Plant, Unit 2 in accordance with Inspection Manual Chapter (IMC) 2201, Appendix C, Generic, Special, and Infrequent Inspections. IMC 2201 Appendix C inspections for the security inspection program are designed to support the NRC goals of maintaining safety, enhancing public confidence, improving the effectiveness, efficiency and realism of the regulatory process, reducing unnecessary regulatory burden, and promoting the common defense and security.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
92707 - Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited
- (1) NRC inspectors completed this inspection by gathering sufficient information to develop a scenario that can be segmented into limited scope tactical response drills that allows for a limited assessment of the ability of licensees physical security systems and security organization to meet the general performance objective of Title 10 of the Code of Federal Regulations (10 CFR) 73.55(b) and to ensure changes made to the physical protection program in response to a local, State, or Federal emergency (e.g., state of emergency, disaster, or public health emergency) have not adversely impacted the licensees implementation of their protective strategy.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125673.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 1, 2020, the inspectors presented the security inspection results to Ernest J.
Kapopoulos, Jr., Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2707
Corrective
Action
Documents
Resulting from
Inspection
2349725-02-06;
2349737-02-04
2349749;
2349754-02;
2349829-02-04;
2350382-02-07
2350383
2707
Miscellaneous
Duke Energy Progress
Physical Security Plan
Revision 13
2/21/2019
2707
Miscellaneous
Site Protective Strategy
Brief
04/03/2019
2702
Miscellaneous
Robinson Unit 2 Security
Protective Strategy
Revision 18
2/19/2019
2707
Procedures
SEC-RNP-0502
H.B. Robinson Nuclear
Power Plant Formal
Target Sets
Revision 11
09/12/2018
2707
Procedures
AD-SY-ALL-0220
Security Communications
Program
Revision 3
08/15/2019
2707
Procedures
PY-SY-ALL-0005
Fleet Nuclear Security use
of Force Policy
Revision 1
01/03/2019
2707
Procedures
AD-SY-ALL-0560
Security Drills and
Exercises
Revision 6
2/12/2019