MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:License-Operator Examination Report
MONTHYEARML24297A2182024-10-28028 October 2024 – NRC Operator License ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20193012019-11-19019 November 2019 NRC Operator License Examination Report 05000261/2019301 IR 05000261/20163022016-09-19019 September 2016 NRC Operator License Re-Take Examination Report 05000261/2016302 IR 05000261/20163012016-03-30030 March 2016 NRC Operator License Examination Report 05000261/2016301 IR 05000261/20133012013-09-23023 September 2013 Er 05000261-13-301; July 29 - August 1, 2013 and August 6, 2013; H. B. Robinson Steam Electric Plant Unit No. 2; Operator License Examinations IR 05000261/20113022012-01-20020 January 2012 Er 05000261-11-302, on December 5 - 9, 2011 and December 13, 2011, H. B. Robinson Steam Electric Plant Unit 2, Licensed Operator Examinations IR 05000261/20113012011-04-29029 April 2011 NRC Operator License Examination Report 05000261-11-301 IR 05000261/20093012009-11-19019 November 2009 Er 05000261/09-301on 09/21/09 - 09/24/09, and 09/29, 2009 for H. B. Robinson, Unit 2, Licensed Operator Examinations ML0708204482007-03-23023 March 2007 Interim NRC Examination Report 2007-301 IR 05000261/20023012002-08-30030 August 2002 Reactor Operator Initial Examination Report 50-261/2002-301 2024-10-28
[Table view] |
Text
November 18, 2022
Ms. Nicole Flippin Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT - NRC OPERATOR LI CENSE EXAMINATION REPORT 05000261/2022301
Dear Ms. Flippin:
During the period October 3 - 6, 2022, the Nuclear Regulatory C ommission (NRC) administered operating tests to employees of your company who had applied fo r licenses to operate the H. B.
Robinson Steam Electric Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests with those members of your staff identified in the enclosed report. The written examination was administered by your staff on October 12, 2022.
All applicants passed both the operating test and written exami nation. There were no post-examination comments. A Sim ulator Fidelity Report is included in this report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspecti on in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is acce ssible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contac t me at (404) 997-4703
Sincerely,
/RA/
Thomas A. Stephen, Chief Operat ions Branch 1 Divis ion of Reactor Safety
Docket No: 50-261 License No: DPR-23
Enclosures:
- 1. Report Details
- 2. Simulator Fidelity Report
cc: Distribution via Listserv N. Flippin 2
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000261/2022301 dated November 18, 2022
DISTRIBUTION:
D. Bacon, RII T. Stephen, RII
- See previous page for concurrence
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: ML22322A132 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS/OB1 RII:DRS/OB1 RII:DRS/OB1 NAME DEgelstad DBacon TStephen DATE 11/17 /2022 11/18/2022 11/ 18 /2022 3
OFFICIAL RECORD COPY DOCUMENT NAME: HTTPS://USNRC.SHAREPOINT.COM/TEAMS/RII OPERATOR LICENSING EXAMS/ROBINSON/INITIAL EXAM 2022-301/CORRESPONDENCE/RB 2022-301 EXAMINATION REPORT LETTER.DOCX 2
U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Examination Report
Docket No.: 05000261
License No.: DPR-23
Report No.: 05000261/2022301
Enterprise Identifier: L-2022-OLL-0018
Licensee: Duke Energy Progress, LLC
Facility: H. B. Robinson Steam Electric Plant, Unit 2
Location: Hartsville, SC
Dates: Operating Test - October 3-6, 2022 WrittenExamination-Oct ober 12, 2022
Examiners: D. Bacon, Chief Examiner, Senior Operations Enginee r K.Kirc hbaum, Operations Engineer M.K ennard, Senior Operations Engineer
Approved by: Thomas A. Stephen, Chief OperationsBranch1 DivisionofReactorSafety
SUMMARY
ER 05000261/2022301; October 3-6, 2022 & October 12, 2022; H. B. Robinson Steam Electric Plant, Unit 2; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an init ial examination in accordance with the guidelines in Revision 12, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." This examination im plemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
The operating tests and written ex aminations were developed by the NRC.
The NRC administered the operating tests during the period Octo ber 3-6, 2022. Members of the H. B. Robinson Steam Electric Plant training staff administ ered the written examination on October 12, 2022. All Reactor Operator (RO) and Senior Reactor Operator (SRO)] applicants passed both the operating test and written examination. All ap plicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
2 2
REPORT DETAILS
- 4. OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
- a. Inspection Scope
The NRC reviewed the licensees examination security measures w hile preparing and administering the examinations to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC performed an audit of two license applications during t he preparatory site visit to confirm that they accurately reflected the subject applicant s qualifications in accordance with NUREG-1021.
The NRC administered the operating tests during the period Octo ber 3-6, 2022. The NRC examiners evaluated three Reactor Operator (RO) and five Se nior Reactor Operator (SRO) applicants using the guidelines contained in NUR EG-1021. Members of the H. B. Robinson Steam Electric Plant training staff admin istered the written examination on October 12, 2022. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, wh o applied for licenses to operate the H. B. Robinson Steam Electric Plant, met the req uirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
- b. Findings
No findings were identified.
The NRC developed both the operating tests and the written exam inations. All examination material was developed in accordance with the guide lines contained in Revision 12, of NUREG-1021. Examination changes agreed upon be tween the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
All applicants passed both the operating test and written exami nation and were issued licenses.
Copies of all individual examination reports were sent to the f acility Training Manager for evaluation of weaknesses and determination of appropriate remed ial training.
The licensee did not submit any post-examination comments. A c opy of the final Reactor Operator and Senior Reac tor Operator written examinations and answer keys, with all changes incorporated, may be accessed not earlier than October 14, 2024, in the ADAMS system (ADAMS Accession Numbers ML22318A013 and ML22318A014).
3
4OA6 Meetings, Including Exit
Exit Meeting Summary
On October 6, 2022, the NRC examination team discussed generic issues associated with the operating test with Ms. Nicole Flippin, Site Vice Pres ident, and members of the H. B. Robinson Steam Electric Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary infor mation was identified.
4 4
KEY POINTS OF CONTACT
Licensee personnel
N. Flippin, Site VP L. Basta, Plant Manager G. Curtis, Operations Manager R. Fredrick, Assistant Operations Manager J. Rackley, Training Manager L. Whitley, Superintendent Operations Training M. Santalla, Superintendent Operations Training J. Rhodes, Superintendent Operations Training L. McNeely, Organizational and Development C. McComber, Nuclear Instructor J. Goodridge, Nuclear Instructor T. Bardauskas, Regulatory Affairs Lead Engineer
NRC personnel
V. Gaffney, Resident Inspector
SIMULATOR FIDELITY REPORT
Facility Licensee: H. B. Robinson
Facility Docket No.: 05000261
Operating Test Administered: October 3-6, 2022
This form is to be used only to report observations. These obs ervations do not constitute audit or inspection findings and, without further verification and re view in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, e xaminers observed the following:
Item Description Simulator Service Recorder NR-53 was not clearing on simulator reset. This issue Request 22-17854 did not affect administration of the operating test and did not present any examination security issues.
Enclosure 2