{{#Wiki_filter:AVERAGEDAILYUNITPOWERLEVELDOCKETNO.TurkePointUNITCOMPLETED gYV.T.Chils<nIL(ITELEPHONE Llll5l=MONTHSEPTEMBER 197SDAYAVERAGEDAILYPOWERLEVEL(MWe-Net)I7659DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 17I8IOl3IS!66066058652657660665663659l9202l2225262728a93031062450260624066056itttIli;rtsINSTRUCTIONS Onthisformat.listtheaveragedailyunitpowerleveltnLiDVeNctforeachdayinthcreporting month.Computetothenearestwholeniegaivat t.(or77)8004840ggyI OPERATING STATUSOPERATING DATAREPORTDOCKETNO.50250DATE~~2,78COhlPLETED BY~~hj3.son TELEPHONE
{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turke Point UNIT COMPLETED gY V.T.Chi ls<n I L (I TELEPHONE Llll5l=MONTH SEPTEMBER 197S DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 7 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 I8 IO l3 IS!6 60 660 58 652 657 660 665 663 659 l9 20 2l 22 25 26 27 28 a9 30 310 6 2 450 260 624 0 660 56 it tt I li;r ts INSTRUCTIONS On this format.list the average daily unit power level tn LiDVe Nct for each day in thc reporting month.Compute to the nearest whole niegaivat t.(or77)8004840 ggyI OPERATING STATUS OPERATING DATA REPORT DOCKET NO.50 250 DATE~~2,78 COhlPLETED BY~~hj3.son TELEPHONE~~3824 728 I.Unit iVame: Turkey Point Unit iVo.3 2.Reporting Period: S tembe 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hlWe): iVotes-Unit No.3 operated a approximately 100/.R.P.ex-cept for outage of Sept.18-19 1978, and load reductions of Sept.22-23, and 23-24,1978.
~~3824728I.UnitiVame:TurkeyPointUnitiVo.32.Reporting Period:Stembe3.LicensedThermalPower(MWt):22004.Nameplate Rating(GrossMWe):S.DesignElectrical Rating(NethlWe):iVotes-UnitNo.3operatedaapproximately 100/.R.P.ex-ceptforoutageofSept.18-19 1978,andloadreductions ofSept.22-23,and23-24,1978.
8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net hOVe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.to-Date Cumulative 720.0 6 551.0 707.7 4 946.6 ll.Hours In Reporting Period 12.i umber Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 9.6 83.5 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours 17.Gross Electrical Energy Generated (MWH)469 785 3 313 410 18.iVet Electrical Energy Generated (MWH)446 134 3 135 529 19.Unit Service Factor 98.3 75.5 20.Unit Availability Factor 100.0 75.5 71.9 22.Unit Capacity Factor (Using DER Net)89.4 69.1 23.Unit Forced Outage Rate-0-1.1 24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): 51" 032.6 194.6 39 033.0 24 597 755 23 282 179 76.5 76.7 69.1 65.8 2.6 Harch 4 1979.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status{Prior to Commercial Operation):
8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NethOVe):10.ReasonsForRestrictions, IfAny:NONEThisMonthYr.to-DateCumulative 720.06551.0707.74946.6ll.HoursInReporting Period12.iumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours9.683.514.HoursGenerator On-LineIS.UnitReserveShutdownHours17.GrossElectrical EnergyGenerated (MWH)469785331341018.iVetElectrical EnergyGenerated (MWH)446134313552919.UnitServiceFactor98.375.520.UnitAvailability Factor100.075.571.922.UnitCapacityFactor(UsingDERNet)89.469.123.UnitForcedOutageRate-0-1.124.Shutdowns Scheduled OverNext6Months(Type.Date.andDurationofEach):51"032.6194.639033.0245977552328217976.576.769.165.82.6Harch41979.25.IfShutDownAtEndOfReportPeriod.Estimated DateofStartup:26.UnitslnTestStatus{PriortoCommercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hION'fll~SZXQJ55 1978 I it No.3 DATF Oct.7 1978 COMPI.ETED DY Ihtc fP A c c ec u<c>>CA Licensee Event Report c CC u u g O cn 6 c 0 c Q c E~O Cause Ec Corrective Acliun lo Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No.3 Mas removed from service to perform integrated safeguards surveillance test.(Nuclear system)22 78-09-22-0-N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear sys tern)23 78-08-23 N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear system)I F: Forccrl S: Schcdolcd (9/77)Reason: A.Erluipmcnt Failure (Explain)8 hlaintcnance oi Test C Refueling D Regulatory Restriction li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain)I I Otlfcr (Explain)3 hlclhod: I hlauual 2 hlanual Scram.3 Automatic Scram.4.Other (Lxplain)Exltibil G-Instructions for Preparatloll ul Data Entry Sltccts I'or Licensee Event Report (LERI Flic INURI'.G-OI6 I)Exlribit I~Saruc Source ,<<',~,<<i~>~',"~~',~'i~~~>><<ia~"-."~i>>'I"'.<<': i 8<<.w  
ForecastAchievedINITIALCRITICALITYINITIALELECTRICITY COMMERCIAL OPERATION UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORThION'fll~SZXQJ551978IitNo.3DATFOct.71978COMPI.ETED DYIhtcfPAccecu<c>>CALicenseeEventReportcCCuugOcn6c0cQcE~OCauseEcCorrective AcliunloPrcvcnlRecurrence 2178-09-1812.3BN/AZZZZZZUnitNo.3Masremovedfromservicetoperformintegrated safeguards surveillance test.(Nuclearsystem)2278-09-22-0-N/AHCHTEXCH(D)Loadreduction tolocateandrepaircondenser tubeleak.(Non-nuclear systern)2378-08-23N/AHCHTEXCH(D)Loadreduction tolocateandrepaircondenser tubeleak.(Non-nuclear system)IF:ForccrlS:Schcdolcd (9/77)Reason:A.Erluipmcnt Failure(Explain) 8hlaintcnance oiTestCRefueling DRegulatory Restriction li-Operator TwiningkLiccnscExamination F.Administrative GOpcratiottal lirrur(Fxplain)
IIOtlfcr(Explain) 3hlclhod:Ihlauual2hlanualScram.3Automatic Scram.4.Other(Lxplain)
ExltibilG-Instructions forPreparatloll ulDataEntrySltcctsI'orLicenseeEventReport(LERIFlicINURI'.G-OI6I)ExlribitI~SarucSource,<<',~,<<i~>~',"~~',~'i~~~>><<ia~"-."~i>>'I"'.<<':i8<<.w  


AVERAGEDAlLYUNITPOWERLEVELDOCKETNO.50-251DATEOt~.7,1978COMPLETED BYSEPTEMBERr 1978DAYAVERAGEDAILYPOWERLEVEL(hIWe.Nct)'AYAVERAGEDAILYPOWERLEVEL(hIWe-iVct) l7I8l9202l22IOl3l4ISl68425262f2$'i930INSTRUCTIONS Onthisformat,listtheaireragcdailyunitpowerieiielinMWcNctforeachdayinthereporting tnunth.Cumput<<tothenearestwholemegawatt.
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.50-25 1 DATE Ot~.7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILY POWER LEVEL (hI We.Nct)'AY AVERAGE DAILY POWER LEVEL (hIWe-iVct) l7 I8 l9 20 2l 22 IO l3 l4 IS l6 84 25 26 2 f 2$'i9 30 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth.Cumput<<to the nearest whole megawatt.I')177 l OPERATING DATA REPORT OPERATING STATUS ev Point Unit No.4 o0 728 I.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (iIWt): 4.iVamepiate Rating (Gross Mme): S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum'Dependable Capacity (iVet MWe): DOCKET NO.DATE Qcr~78 COMPLETED OY~~hilson TELEPHOiVE 430S3~-3824 Notes-Una.t No.4 scheduled refueling, maintenance, and inspections continued during month.Initial reactor crit cality following completion of refueling was accompli'she on September 28, 1978.~g~'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To'iVhich Restricted, lf Any (Net MWe): 10.Reasons For Restrictions, lf Any: 5 i Yr..to.Date This Month 720.0 I I.Hours In Reporting Period 12., Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (M'IVH)17.Gross Electrical Energy Generated (hlWH)IS.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using I(DC Net)"".Unit Capacity Factor (Using DER Net)~D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 876.5 54.7-0--0-'-0--0-3 028 155 2 865 454-3 210 73.4 73.4 65.7-0--0-63.1-0-0.1 (Type.Date, and Duration of Each): Cumulative 32 349.4 138.8-0-20 852 080 19 761 939 6.1 66.8 63.7 2.9 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
I')177l OPERATING DATAREPORTOPERATING STATUSevPointUnitNo.4o0728I.UnitName:2.Reporting Period:3.LicensedThermalPower(iIWt):4.iVamepiate Rating(GrossMme):S.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.Maximum'Dependable Capacity(iVetMWe):DOCKETNO.DATEQcr~78COMPLETED OY~~hilsonTELEPHOiVE 430S3~-3824Notes-Una.tNo.4scheduled refueling, maintenance, andinspections continued duringmonth.Initialreactorcritcalityfollowing completion ofrefueling wasaccompli'she onSeptember 28,1978.~g~'.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport.GiveReasons:9.PowerLevelTo'iVhichRestricted, lfAny(NetMWe):10.ReasonsForRestrictions, lfAny:5iYr..to.Date ThisMonth720.0II.HoursInReporting Period12.,NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On.LineIS.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (M'IVH)17.GrossElectrical EnergyGenerated (hlWH)IS.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingI(DCNet)"".UnitCapacityFactor(UsingDERNet)~D.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months4876.554.7-0--0-'-0--0-30281552865454-321073.473.465.7-0--0-63.1-0-0.1(Type.Date,andDurationofEach):Cumulative 32349.4138.8-0-20852080197619396.166.863.72.925.IfShutDownAtEndOfReportPeriod.Estimated DateofStartup:26.UnitslnTestStatus(PriortoCommercial Operation):
October 1, 1978 Forecast Achieved IN ITIA L CR ITICA LITY INITIAL ELFCTRICITY COMMERCIAL OPERATION ('>/77)
October1,1978ForecastAchievedINITIALCRITICALITYINITIALELFCTRICITY COMMERCIAL OPERATION
UNIT SIIUTDOWNS AND POWER REDUCTIONS gEpppTgpNm SEPTppBER 1978 COh(PLETED BY lit No.4 Ns).Dare~A I.~I I'vl rl Cl a, c 5rx!r<c~C/l Llceiiscc Event Report ir C tt 0 Cl'n Vl cn G C 0 c Q E~O Cr Cailsc k, Corrective Acllilil lo Prcvelil Rceurrcrlec 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No.4 was removed from service for scheduled refueling, maintenance, and inspections.(Continued f rom previous month)(Nuclear and non-nuclear systems)I F: Forced S: Scheduled ('t/17)Reason: A-Er(uipmcnt Failure (Explain)8 htalntcnancc oi Test C-Refueling D Rcyilatory Restriction L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive G Operational Error (Lxplain)I I Other (Explain)htcthod: I-hlanual 2-h(anual Scram.3-Aulolualic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation tf Data Entry Sheets lor Licensee Event Rcport (LL'R)File (NURL'G.016 l)5 Exliibil I-Saine Source 4'r-4~
('>/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.S t.Lucre DATE Oct.7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)DAY AVERAGE DAlLY POWER LEVEL (LIIWe.Nct) 782 17 10 12 13 15 16 INSTRUCTIONS 351 77 777 778 778 779 767 773 IS 19 20 21 22 23 25 26'l9 30 NOTE: 783 778 741 782 769 764 765~760 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.'is ,r I-0~4'r I~o o tt II tt ll I: I j;it~j On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth.
UNITSIIUTDOWNS ANDPOWERREDUCTIONS gEpppTgpNm SEPTppBER 1978COh(PLETED BYlitNo.4Ns).Dare~AI.~II'vlrlCla,c5rx!r<c~C/lLlceiiscc EventReportirCtt0Cl'nVlcnGC0cQE~OCrCailsck,Corrective AcllililloPrcvelilRceurrcrlec 7S-08-13S720.0N/AzzZZZZZZUnitNo.4wasremovedfromserviceforscheduled refueling, maintenance, andinspections.
Compute to the nearest whole megawatt.I<)/77)  
(Continued frompreviousmonth)(Nuclearandnon-nuclearsystems)IF:ForcedS:Scheduled
('t/17)Reason:A-Er(uipmcnt Failure(Explain) 8htalntcnancc oiTestC-Refueling DRcyilatory Restriction L.Operator TrainingtLLiccnscExaniinalion F.Adminislmtive GOperational Error(Lxplain)
IIOther(Explain) htcthod:I-hlanual2-h(anual Scram.3-Aulolualic Scram.4.Other(Explain)
ExhibitG-Instructions forPreparation tfDataEntrySheetslorLicenseeEventRcport(LL'R)File(NURL'G.016l)5ExliibilI-SaineSource4'r-4~
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.St.LucreDATEOct.7,1978COMPLETED BYonMONTHSEPTEIIBER,1978DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
DAYAVERAGEDAlLYPOWERLEVEL(LIIWe.Nct) 782171012131516INSTRUCTIONS 35177777778778779767773IS19202122232526'l930NOTE:783778741782769764765~760Averagedailypowerlevelgreaterthan777Kfeduetocoolercondenser coolingwater.'is,rI-0~4'rI~oottIIttllI:Ij;it~jOnthisformat,listtheaveragedailyunitpowertcvclinMac.Nctforeachdayinthcrcportinnmonth.
Computetothenearestwholemegawatt.
I<)/77)  


OPERATING DATAREPORTDOCKETNO.DATEQ~f~f[78COhIPLETED GY~~sonTELEPHONE X2RB~-3824OPERATING STATUSl.UnitName:2.Reportfng Period:Setember19783.LicensedThermalPower(MWt):4.NamephteRating(GrossMWe):5.DesignElectrical Rating(NetMIVe):6.MaximumDependable Capacity(CrossMWe):7.hlaximumDependable Capacity(NethIWe):2560850802822777Notes-Unitoperatedatap-prox'.mately 100KR.P.afrermainpowertransformer Vo.lAwasreturnedtoserviceonSeptember 3,1978.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, lfAny:ThishlonthYr.toDateCumulative 232.0'118.512525.821.0296302049621060904172580.480.674.772.46.9er3,1978II.HoursInReporting Period12.NumberOfHoursReactor'IVasCritical13.ReactorReserveShutdownHours16.914.HoursGenerator On.Line4844.015.UnitReserveShutdownHours11.721.01178099017.GrossElectrical EnergyCcnerated (MWH)558870382630018.NetElectrical EnergyGenerated (MWH)527.357359914819.UnitServiceFactor98.473.920.UnitAvaiiability Factor100'74~370.722.UnitCapacityFactor(UsingDERNet)91.368.523.UnitForcedOutageRate-0-1.424.Shutdowns Scheduled OverNext6hlonths(Type,Date.andDurationofEach):amGenerator TubeInsnection Proram-October30-Decemb25.IfShutDownAtEndOfReportPeriod.Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
OPERATING DATA REPORT DOCKET NO.DATE Q~f~f[78 COhIPLETED GY~~son TELEPHONE X2RB~-3824 OPERATING STATUS l.Unit Name: 2.Reportfng Period: Se tember 1978 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 5.Design Electrical Rating (Net MIVe): 6.Maximum Dependable Capacity (Cross MWe): 7.hlaximum Dependable Capacity (Net hIWe): 2560 850 802 822 777 Notes-Unit operated at ap-prox'.mately 100K R.P.afrer main power transformer Vo.lA was returned to service on September 3, 1978.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This hlonth Yr.to Date Cumulative 2 32.0'118.5 12 525.8 21.0 29 630 204 9 621 060 9 041 725 80.4 80.6 74.7 72.4 6.9 er 3, 1978 I I.Hours In Reporting Period 12.Number Of Hours Reactor'IVas Critical 13.Reactor Reserve Shutdown Hours 16.9 14.Hours Generator On.Line 4 844.0 15.Unit Reserve Shutdown Hours 11.7 21.0 11 780 990 17.Gross Electrical Energy Ccnerated (MWH)558 870 3 826 300 18.Net Electrical Energy Generated (MWH)5 27.35 7 3 599 148 19.Unit Service Factor 98.4 73.9 20.Unit Avaiiability Factor 100'74~3 70.7 22.Unit Capacity Factor (Using DER Net)91.3 68.5 23.Unit Forced Outage Rate-0-1.4 24.Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each): am Generator Tube Insnection Pro ram-October 30-Decemb 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
ForecastAchievedINITIALCRITICALITYINITIALELECTRICITY COhIMERCIAL OPERATION UNITSIIUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.50335UNITNAhIE No.1REPORThIONfI>>
Forecast Achieved INITIA L CR ITICA LITY INITIAL ELECTRICITY COhIMERCIAL OPERATION UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.50 335 UNITNAhIE No.1 REPORThIONfI>>
SEPTEHBER, 1978Nii.DateIIUlflClM~-nV~ccu<a~VlQLiccnsccEventReportrrCC~ea~>E(30CJCauseh.Corrective ActionloPfcvcrllRecllrrerrcc 1878-08-30SN/AEGTRANSFLoadwaslimitedtothecapacityofmainpowertransformer No.1B.(Continued frompreviousmonth)(Non-nuclearsystem)78-08-31S5.3N/AEGTRANSFUnitwasremovedfromservicetopro-tectpersonnel usingacranetoremoveafaultybushingfrommainpowertransformer No.1A.(Continued frompreviousmonth)(Non-nuclear system)2078-09-02S6.4BN/AEGTRANSFUnitwasremovedfromservicetoreturnmainpowertransformer No.lAtoserviceafterinstallation ofanewbushingandseal.(Non-nuclear system)F:ForcedS:Scheduled (9/77)Reason:AEquipmcnt Failure(Expiaio) 8hlainlcnance oiTestCRcfucling DRegrdatory ltestrtclton E.Operator Trainingh.IiccnscExamination F.Administ wlivcG.Opcraliooal Error(Explain)
SEPTEHBER, 1978 Nii.Date I I Ul fl Cl M~-n V~cc u<a~Vl Q Liccnscc Event Report rr C C~e a~>E(3 0 CJ Cause h.Corrective Action lo Pfcvcrll Recllrrerrcc 18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No.1B.(Continued from previous month)(Non-nuclear system)78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No.1A.(Continued from previous month)(Non-nuclear system)20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal.(Non-nuclear system)F: Forced S: Scheduled (9/77)Reason: A Equipmcnt Failure (Expiaio)8 hlainlcnance oi Test C Rcfucling D Regrdatory ltestrtclton E.Operator Training h.Iiccnsc Examination F.Administ wlivc G.Opcraliooal Error (Explain)II.Other (Explain)hicthod: I.hianual 2.hianual Scram.3-Aufonmlic Scram.4-Other (Explaut)Exhibit G-Instructions for Prcparalio>>
II.Other(Explain) hicthod:I.hianual 2.hianual Scram.3-Aufonmlic Scram.4-Other(Explaut)
of Data Entry Sheets lor Lieensec Event lteporl (LL'R)Fiie I YUltEG.0!6I)5 Exllibit I-Sarrre Source i+I cLORIOA?0"VER 5 uGHI'Qi"I?A."A October 7, 1978 Office of Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555~~C Gentlemen:
ExhibitG-Instructions forPrcparalio>>
Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, D.Schmia Vice President Power Resources~4 I'I;~~tl-C VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire 4
ofDataEntrySheetslorLieensecEventlteporl(LL'R)FiieIYUltEG.0!6I)5ExllibitI-SarrreSource i+IcLORIOA?0"VER5uGHI'Qi"I?A."A October7,1978OfficeofManagement Information andProgramControlsU.S.NuclearRegulatory Commission Washington, D.C.20555~~CGentlemen:
 
AttachedaretheSeptember, 1978,Operating SummaryReportsforTurkeyPointUnitNos.3and4andSt.LucieUnitNo.1.Verytrulyyours,D.SchmiaVicePresident PowerResources
==SUMMARY==
~4I'I;~~tl-CVTC/DDCcc:Mr.JamesP.O'ReillyRobertLowenstein, Esquire4 SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-250TurkeyPointUNITUnitNo.3DATEOct.7,1978COMPLETED BYV.T.ChilsonQEPORTMONTHSEPTEMBER, 1978TELEPHONE (305)552-3824)Unitoperatedatapproximately 100$R.P.exceptfortheoutageofSeptember 18-19,1978,andtheloadreductions ofSeptember 22-23and23-24,1978.Referto"UnitShutdowns andPowerReductions" sectionoftheSeptember, 1978,Operating StatusReportforadditonal information.
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Oct.7, 1978 COMPLETED BY V.T.Chilson QEPORT MONTH SEPTEMBER, 19 78 TELEPHONE (305)552-3824)Unit operated at approximately 100$R.P.except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978.Refer to"Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.
NoMajorSafety-related maintenance wasperformed duringthemonth.
No Major Safety-related maintenance was performed during the month.  
SUMMARYOFOPERATING EXPERIENCE DOCKETNO..50-251TurkeyPointUnitNo.4DATEOct.71978COMPLETED BYV.T.Chilson~~4~TELEPHONE 305552-3824QEPORTMONTHSEPTEMBER 1978Scheduled refueling, maintenance, andinspections outagecontinued duringmonth.Initialreactorcriticality following completion ofzefueling wasaccomplished onSeptember 28,1978.MajorSafety-related maintenance activities performed duringthemonthincluded:
 
Completed theSteamGenerator TubeInspection Program.RefertoSteamGenerator Inspection ReportofSeptember 6,1978,foradditional information.
==SUMMARY==
Installed 12newfuelassemblies andshuffledpartially spentfuelassemblies forCoreCycleVoperation.
OF OPERATING EXPERIENCE DOCKET NO..50-251 Turkey Point Unit No.4 DATE Oct.7 1978 COMPLETED BY V.T.Chilson~~4~TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month.Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.Major Safety-related maintenance activities performed during the month included: Completed the Steam Generator Tube Inspection Program.Refer to Steam Generator Inspection Report of September 6, 1978, for additional information.
Completed modifications tochargingsystempiping.g1CI
Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.
$UMMARYOFOPERATING EXPERIENCE
Completed modifications to charging system piping.g 1 C I
~4~~~~~KTDOCKETNO..50-335cCit.il'CUNITSt.LucienitN.1QEPORTMONTHSEPTEMBER, 1978DATEOct.71978COMPLETED BYV.T.isTELEPHONE t~I'iI!Ig~iUnitoperatedatapproximately 100%R.P.aftermainpowertrans-formerNo.1Awas.returnedtoserviceonSeptember 3,1978.MajorSafety-related maintenance performed duringthemonthin-cludedinspection andrepairsonchargingpumpNo.1A.RefertoLicenseeEventReportNo.335-78-34 foradditional details.PiIf~jlif~it!}}
$UMMARY OF OPERATING EXPERIENCE
~4~~~~~KT DOCKET NO..50-335 cC it.il'C UNIT S t.Lucie nit N.1 QEPORT MONTH SEPTEMBER, 1978 DATE Oct.7 1978 COMPLETED BY V.T.i s TELEPHONE t~I'i I!Ig~i Unit operated at approximately 100%R.P.after main power trans-former No.1A was.returned to service on September 3, 1978.Major Safety-related maintenance performed during the month in-cluded inspection and repairs on charging pump No.1A.Refer to Licensee Event Report No.335-78-34 for additional details.Pi If~j l if~i t!}}

Revision as of 18:26, 7 July 2018

Monthly Operating Repts for Sept 1978
ML17208A513
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/07/1978
From: CHILSON V T
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A512 List:
References
NUDOCS 8004240444
Download: ML17208A513 (15)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turke Point UNIT COMPLETED gY V.T.Chi ls<n I L (I TELEPHONE Llll5l=MONTH SEPTEMBER 197S DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 7 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 I8 IO l3 IS!6 60 660 58 652 657 660 665 663 659 l9 20 2l 22 25 26 27 28 a9 30 310 6 2 450 260 624 0 660 56 it tt I li;r ts INSTRUCTIONS On this format.list the average daily unit power level tn LiDVe Nct for each day in thc reporting month.Compute to the nearest whole niegaivat t.(or77)8004840 ggyI OPERATING STATUS OPERATING DATA REPORT DOCKET NO.50 250 DATE~~2,78 COhlPLETED BY~~hj3.son TELEPHONE~~3824 728 I.Unit iVame: Turkey Point Unit iVo.3 2.Reporting Period: S tembe 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hlWe): iVotes-Unit No.3 operated a approximately 100/.R.P.ex-cept for outage of Sept.18-19 1978, and load reductions of Sept.22-23, and 23-24,1978.

8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net hOVe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.to-Date Cumulative 720.0 6 551.0 707.7 4 946.6 ll.Hours In Reporting Period 12.i umber Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 9.6 83.5 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours 17.Gross Electrical Energy Generated (MWH)469 785 3 313 410 18.iVet Electrical Energy Generated (MWH)446 134 3 135 529 19.Unit Service Factor 98.3 75.5 20.Unit Availability Factor 100.0 75.5 71.9 22.Unit Capacity Factor (Using DER Net)89.4 69.1 23.Unit Forced Outage Rate-0-1.1 24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): 51" 032.6 194.6 39 033.0 24 597 755 23 282 179 76.5 76.7 69.1 65.8 2.6 Harch 4 1979.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status{Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hION'fll~SZXQJ55 1978 I it No.3 DATF Oct.7 1978 COMPI.ETED DY Ihtc fP A c c ec u<c>>CA Licensee Event Report c CC u u g O cn 6 c 0 c Q c E~O Cause Ec Corrective Acliun lo Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No.3 Mas removed from service to perform integrated safeguards surveillance test.(Nuclear system)22 78-09-22-0-N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear sys tern)23 78-08-23 N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear system)I F: Forccrl S: Schcdolcd (9/77)Reason: A.Erluipmcnt Failure (Explain)8 hlaintcnance oi Test C Refueling D Regulatory Restriction li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain)I I Otlfcr (Explain)3 hlclhod: I hlauual 2 hlanual Scram.3 Automatic Scram.4.Other (Lxplain)Exltibil G-Instructions for Preparatloll ul Data Entry Sltccts I'or Licensee Event Report (LERI Flic INURI'.G-OI6 I)Exlribit I~Saruc Source ,<<',~,<<i~>~',"~~',~'i~~~>><<ia~"-."~i>>'I"'.<<': i 8<<.w

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.50-25 1 DATE Ot~.7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILY POWER LEVEL (hI We.Nct)'AY AVERAGE DAILY POWER LEVEL (hIWe-iVct) l7 I8 l9 20 2l 22 IO l3 l4 IS l6 84 25 26 2 f 2$'i9 30 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth.Cumput<<to the nearest whole megawatt.I')177 l OPERATING DATA REPORT OPERATING STATUS ev Point Unit No.4 o0 728 I.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (iIWt): 4.iVamepiate Rating (Gross Mme): S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum'Dependable Capacity (iVet MWe): DOCKET NO.DATE Qcr~78 COMPLETED OY~~hilson TELEPHOiVE 430S3~-3824 Notes-Una.t No.4 scheduled refueling, maintenance, and inspections continued during month.Initial reactor crit cality following completion of refueling was accompli'she on September 28, 1978.~g~'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To'iVhich Restricted, lf Any (Net MWe): 10.Reasons For Restrictions, lf Any: 5 i Yr..to.Date This Month 720.0 I I.Hours In Reporting Period 12., Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (M'IVH)17.Gross Electrical Energy Generated (hlWH)IS.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using I(DC Net)"".Unit Capacity Factor (Using DER Net)~D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 876.5 54.7-0--0-'-0--0-3 028 155 2 865 454-3 210 73.4 73.4 65.7-0--0-63.1-0-0.1 (Type.Date, and Duration of Each): Cumulative 32 349.4 138.8-0-20 852 080 19 761 939 6.1 66.8 63.7 2.9 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

October 1, 1978 Forecast Achieved IN ITIA L CR ITICA LITY INITIAL ELFCTRICITY COMMERCIAL OPERATION ('>/77)

UNIT SIIUTDOWNS AND POWER REDUCTIONS gEpppTgpNm SEPTppBER 1978 COh(PLETED BY lit No.4 Ns).Dare~A I.~I I'vl rl Cl a, c 5rx!r<c~C/l Llceiiscc Event Report ir C tt 0 Cl'n Vl cn G C 0 c Q E~O Cr Cailsc k, Corrective Acllilil lo Prcvelil Rceurrcrlec 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No.4 was removed from service for scheduled refueling, maintenance, and inspections.(Continued f rom previous month)(Nuclear and non-nuclear systems)I F: Forced S: Scheduled ('t/17)Reason: A-Er(uipmcnt Failure (Explain)8 htalntcnancc oi Test C-Refueling D Rcyilatory Restriction L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive G Operational Error (Lxplain)I I Other (Explain)htcthod: I-hlanual 2-h(anual Scram.3-Aulolualic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation tf Data Entry Sheets lor Licensee Event Rcport (LL'R)File (NURL'G.016 l)5 Exliibil I-Saine Source 4'r-4~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.S t.Lucre DATE Oct.7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)DAY AVERAGE DAlLY POWER LEVEL (LIIWe.Nct) 782 17 10 12 13 15 16 INSTRUCTIONS 351 77 777 778 778 779 767 773 IS 19 20 21 22 23 25 26'l9 30 NOTE: 783 778 741 782 769 764 765~760 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.'is ,r I-0~4'r I~o o tt II tt ll I: I j;it~j On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth.

Compute to the nearest whole megawatt.I<)/77)

OPERATING DATA REPORT DOCKET NO.DATE Q~f~f[78 COhIPLETED GY~~son TELEPHONE X2RB~-3824 OPERATING STATUS l.Unit Name: 2.Reportfng Period: Se tember 1978 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 5.Design Electrical Rating (Net MIVe): 6.Maximum Dependable Capacity (Cross MWe): 7.hlaximum Dependable Capacity (Net hIWe): 2560 850 802 822 777 Notes-Unit operated at ap-prox'.mately 100K R.P.afrer main power transformer Vo.lA was returned to service on September 3, 1978.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This hlonth Yr.to Date Cumulative 2 32.0'118.5 12 525.8 21.0 29 630 204 9 621 060 9 041 725 80.4 80.6 74.7 72.4 6.9 er 3, 1978 I I.Hours In Reporting Period 12.Number Of Hours Reactor'IVas Critical 13.Reactor Reserve Shutdown Hours 16.9 14.Hours Generator On.Line 4 844.0 15.Unit Reserve Shutdown Hours 11.7 21.0 11 780 990 17.Gross Electrical Energy Ccnerated (MWH)558 870 3 826 300 18.Net Electrical Energy Generated (MWH)5 27.35 7 3 599 148 19.Unit Service Factor 98.4 73.9 20.Unit Avaiiability Factor 100'74~3 70.7 22.Unit Capacity Factor (Using DER Net)91.3 68.5 23.Unit Forced Outage Rate-0-1.4 24.Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each): am Generator Tube Insnection Pro ram-October 30-Decemb 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CR ITICA LITY INITIAL ELECTRICITY COhIMERCIAL OPERATION UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.50 335 UNITNAhIE No.1 REPORThIONfI>>

SEPTEHBER, 1978 Nii.Date I I Ul fl Cl M~-n V~cc u<a~Vl Q Liccnscc Event Report rr C C~e a~>E(3 0 CJ Cause h.Corrective Action lo Pfcvcrll Recllrrerrcc 18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No.1B.(Continued from previous month)(Non-nuclear system)78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No.1A.(Continued from previous month)(Non-nuclear system)20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal.(Non-nuclear system)F: Forced S: Scheduled (9/77)Reason: A Equipmcnt Failure (Expiaio)8 hlainlcnance oi Test C Rcfucling D Regrdatory ltestrtclton E.Operator Training h.Iiccnsc Examination F.Administ wlivc G.Opcraliooal Error (Explain)II.Other (Explain)hicthod: I.hianual 2.hianual Scram.3-Aufonmlic Scram.4-Other (Explaut)Exhibit G-Instructions for Prcparalio>>

of Data Entry Sheets lor Lieensec Event lteporl (LL'R)Fiie I YUltEG.0!6I)5 Exllibit I-Sarrre Source i+I cLORIOA?0"VER 5 uGHI'Qi"I?A."A October 7, 1978 Office of Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555~~C Gentlemen:

Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, D.Schmia Vice President Power Resources~4 I'I;~~tl-C VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Oct.7, 1978 COMPLETED BY V.T.Chilson QEPORT MONTH SEPTEMBER, 19 78 TELEPHONE (305)552-3824)Unit operated at approximately 100$R.P.except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978.Refer to"Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.

No Major Safety-related maintenance was performed during the month.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO..50-251 Turkey Point Unit No.4 DATE Oct.7 1978 COMPLETED BY V.T.Chilson~~4~TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month.Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.Major Safety-related maintenance activities performed during the month included: Completed the Steam Generator Tube Inspection Program.Refer to Steam Generator Inspection Report of September 6, 1978, for additional information.

Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.

Completed modifications to charging system piping.g 1 C I

$UMMARY OF OPERATING EXPERIENCE

~4~~~~~KT DOCKET NO..50-335 cC it.il'C UNIT S t.Lucie nit N.1 QEPORT MONTH SEPTEMBER, 1978 DATE Oct.7 1978 COMPLETED BY V.T.i s TELEPHONE t~I'i I!Ig~i Unit operated at approximately 100%R.P.after main power trans-former No.1A was.returned to service on September 3, 1978.Major Safety-related maintenance performed during the month in-cluded inspection and repairs on charging pump No.1A.Refer to Licensee Event Report No.335-78-34 for additional details.Pi If~j l if~i t!